Permit Application Status

PRRES20200314


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20200314
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY PARTIALLY FINISHED BASEMENT COVERED PATIO
02/11/2020
02/18/2020
03/10/2021
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
PERMITTING@JFECONSTRUCTION.COM  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/18/2020 02/13/2020
Steve Conrick
Rear yard dimension
Corrective Action Required
02/13/2020

The rear yard demision(s) must be provided on the plot plan. The house (and covered patio) must meet the 30' rear yard setback
Drainage swales
Corrective Action Required
02/13/2020

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provided Please add cross-section elevations throughout the swale and berm
Spot elevations
Corrective Action Required
02/13/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. The back right corner near the patio is at 982 and the area near the egress well is at 981.5, but there is a flow arrow on the side yard pointing to the rear of the house. Please clearify and adjust as necessary. Should the house be raised?
Residential Plan Review Approved 02/18/2020 02/13/2020
Steve Conrick
Plot Plan Review Rejected 02/13/2020 02/12/2020
Steve Conrick
Rear yard dimension
Corrective Action Required
02/12/2020

The rear yard demision(s) must be provided on the plot plan. The house (and covered patio) must meet the 30' rear yard setback
Drainage swales
Corrective Action Required
02/12/2020

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provided Please add cross-section elevations throughout the swale and berm
Spot elevations
Corrective Action Required
02/12/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. The back right corner near the patio is at 982 and the area near the egress well is at 981.5, but there is a flow arrow on the side yard pointing to the rear of the house. Please clearify and adjust as necessary. Should the house be raised?
Residential Plan Review Approved 02/13/2020 02/12/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,128.59 $1,128.59 Paid 02/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/18/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/18/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 02/18/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 02/18/2020
8331507-Sewer Connection Fee $510.00 $510.00 Paid 02/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/6/2020 3/6/2020 03/06/2020
Sewer Service Inspection - R Passed 4/1/2020 4/1/2020 04/01/2020
Water Service Inspection - R Partial 4/2/2020 (11:00) 4/2/2020 04/02/2020
Water Service Inspection - R Passed 4/2/2020 4/2/2020 04/02/2020
Underslab Plumbing Inspection - Residential Passed 4/9/2020 4/9/2020 04/09/2020
Piers/Caissons Inspection - Residential Passed 4/17/2020 04/29/2020
Misc
Informational
04/29/2020
3RD PARTY DECK PIERS BY KEVIN MILLER @ APEX SIGNED & STAMPED BY CLAYTON HESS. - (4) 24 X 36 DECK PIERS
Electrical Service Inspection Passed 5/29/2020 5/29/2020 05/29/2020
All Rough Inspection - Residential Failed 5/29/2020 5/29/2020 05/29/2020
Miscellaneous Correction
Corrective Action Required
05/29/2020
-COMPLETE GARAGE PORTAL Framing PFH PER DETAIL-NAILING PATTERN EXTERIOR, 5/8” ANCHOR BOLTS AND DOUBLE BOTTOM PLATE -MISSING ANCHOR BOLTS IN GARAGE -ANCHOR BOLTS WITHIN 12” OF PLATE BREAK -PROVIDE CLIP OR HANGER ON RAFTER IN OFFICE/BEDROOM WHERE UNLANDED RAFTER MEETS BEAM -NAIL DOUBLE 2x12 HEADERS TOGETHER IN MASTER BED -FINISH BLOCKING JOISTS ABOVE BEAM IN BASEMENT -COMPLETE GAS LINE AND HOOK UP ON EXTERIOR GAS FIREPLACE
Gas Service Inspection - Residential Failed 5/29/2020 5/29/2020 05/29/2020
Miscellaneous Correction
Corrective Action Required
05/29/2020
-COMPLETE GAS LINE AND HOOK UP ON EXTERIOR GAS FIREPLACE
All Rough Inspection - Residential Failed 6/2/2020 6/2/2020 06/02/2020
Miscellaneous Correction
Resolved
06/02/2020
-COMPLETE GARAGE PORTAL Framing PFH PER DETAIL-NAILING PATTERN EXTERIOR, 5/8” ANCHOR BOLTS AND DOUBLE BOTTOM PLATE -MISSING ANCHOR BOLTS IN GARAGE -ANCHOR BOLTS WITHIN 12” OF PLATE BREAK -PROVIDE CLIP OR HANGER ON RAFTER IN OFFICE/BEDROOM WHERE UNLANDED RAFTER MEETS BEAM -NAIL DOUBLE 2x12 HEADERS TOGETHER IN MASTER BED -FINISH BLOCKING JOISTS ABOVE BEAM IN BASEMENT -
Miscellaneous Correction
Corrective Action Required
06/02/2020
—OK TO COVER— -COMPLETE GAS LINE AND ELECTRICAL HOOK UP ON EXTERIOR GAS FIREPLACE -UNDERGROUND ELECTRIC AND PLUMBING INSPECTION REQUIRED
Driveway Inspection Passed 6/17/2020 6/17/2020 06/17/2020
Misc
Informational
06/17/2020
On Wednesday, 6-17-2020. I preformed a drive approach inspection at the aforementioned property and found the sub grade and the forming all met city standards to pour driveway.
Erosion Control Inspection Residential Failed 07/17/2020
Miscellaneous Correction
Corrective Action Required
07/17/2020
-ADDRESS DEFICIENT EROSION CONTROL
Underground Plumbing Inspection - Residential Passed 7/17/2020 7/17/2020 07/17/2020
Erosion Control Inspection Residential Failed 07/21/2020
Miscellaneous Correction
Resolved
07/21/2020
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/21/2020
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Gas Service Inspection - Residential Passed 9/9/2020 09/09/2020
Miscellaneous Correction
Resolved
09/09/2020
-COMPLETE GAS LINE AND HOOK UP ON EXTERIOR GAS FIREPLACE
All Rough Inspection - Residential Passed 9/9/2020 09/09/2020
Miscellaneous Correction
Resolved
09/09/2020
—OK TO COVER— -COMPLETE GAS LINE AND ELECTRICAL HOOK UP ON EXTERIOR GAS FIREPLACE -UNDERGROUND ELECTRIC AND PLUMBING INSPECTION REQUIRED
Plot Plan Inspection Passed 9/14/2020 09/14/2020
Erosion Control Inspection Residential Passed 09/28/2020
Misc
Resolved
09/28/2020
-Deficient erosion control installation, shall be in compliance within two days. No further inspections until complete -Street cleanup required immediately. No further inspections until complete -Remove trash from site -Remove overgrown weeds and vegetation -provide building address
Occupancy Inspection - Codes Residential Failed 9/28/2020 9/28/2020 09/28/2020
Misc
Corrective Action Required
09/28/2020
-Lawn irrigation permit required -Final grade per approved plot and sod -Seal all exterior penetrations -Downspouts to discharge minimum 36 inches from foundation -Lighting fixtures at front door placed below eight (8) feet shall be fixtures manufactured such that the light source is not "readily accessible" as defined in the adopted National Electrical Code (NEC). -All sliding glass doors shall be equipped with a secondary locking device consisting of a metal pin or a surface mounted bolt assembly. Metal pins shall be installed at the intersection of the inner and outer panels of the inside door and shall not penetrate the frame's exterior surface. The surface mounted bolt assembly shall be installed at the base of the door. -Receptacle within 6 feet of sink requires GFCI protection, under kitchen sink -kitchen GFCI receptacles not working right side of range & island -Remove all paint covers from smoke and carbon monoxide alarms -Remove trash and construction debris -Label dedicated circuit in garage as non-GFCI protected -Building address shall be of contrasting color to it’s background
Occupancy Inspection - Codes Residential Full C of O 3/10/2021 3/10/2021 03/10/2021
Misc
Resolved
03/10/2021
-Lawn irrigation permit required -Final grade per approved plot and sod -Seal all exterior penetrations -Downspouts to discharge minimum 36 inches from foundation -Lighting fixtures at front door placed below eight (8) feet shall be fixtures manufactured such that the light source is not "readily accessible" as defined in the adopted National Electrical Code (NEC). -All sliding glass doors shall be equipped with a secondary locking device consisting of a metal pin or a surface mounted bolt assembly. Metal pins shall be installed at the intersection of the inner and outer panels of the inside door and shall not penetrate the frame's exterior surface. The surface mounted bolt assembly shall be installed at the base of the door. -Receptacle within 6 feet of sink requires GFCI protection, under kitchen sink -kitchen GFCI receptacles not working right side of range & island -Remove all paint covers from smoke and carbon monoxide alarms -Remove trash and construction debris -Label dedicated circuit in garage as non-GFCI protected -Building address shall be of contrasting color to it’s background
Erosion Control Inspection Residential Passed 03/10/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
03/10/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Gas Piping Inspection - Residential Passed 03/10/2021
Documents & Images
Date Uploaded File Type Document Name
02/12/2020 Letter Codes Residential Plan Review
02/18/2020 Letter DS Building Permit
02/18/2020 Receipt Receipt for transaction: 2020-000653
02/20/2020 Plot Plan DOC022020-02202020091513
03/06/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/27/2020 Engineer Report/Study Final_2020.04.17_DPier_LSMO_Concrete Design
04/29/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/11/2020 Plot Plan As-Graded Plot Plan
09/14/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
03/10/2021 Letter Codes Final Certificate of Occupancy
03/10/2021 Letter Field Certificate of Occupancy
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
09/20/2021 WW-27-AS-GRADED-UPDATED-9-20-21-Invoice
09/20/2021 WW-27-AS-GRADED-UPDATED-9-20-21
09/20/2021 Plot Plan APPROVED AS GRADED PLOT PLAN
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home