Summary
PRRES20193546
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW SINGLE FAMILY PARTIALLY FINISHED BASEMENT STOP WORK ORDER generated on 06/15/2020 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 06/23/2020 12:00 AM by username 'Mark Harding'.
12/06/2019
12/11/2019
11/09/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/10/2019 12/10/2019
Steve Conrick
Residential Plan Review Approved 12/10/2019 12/10/2019
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $814.71 $814.71 Paid 12/11/2019
Right of Way Permit Fee $80.00 $80.00 Paid 12/11/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/11/2019
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/11/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 12/11/2019
Water Meter Fee $425.02 $425.02 Paid 12/11/2019
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/18/2020
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/18/2020
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/7/2020 (3:15) 1/7/2020 01/07/2020
Misc
Corrective Action Required
01/07/2020
Staple plans together on future inspections Post site address Ok to pour
Underslab Plumbing Inspection - Residential Passed 2/21/2020 2/21/2020 02/21/2020
Sewer Service Inspection - R Passed 3/4/2020 3/4/2020 03/04/2020
Water Service Inspection - R Passed 3/5/2020 (10:30) 3/5/2020 03/05/2020
Piers/Caissons Inspection - Residential Failed 4/24/2020 (9:00) 4/24/2020 at 9:40 AM 04/24/2020
Misc
Corrective Action Required
04/24/2020
- PROVIDE (4) # 4 VERT BARS PER PLAN - (1) 24 X 36 (1) 24 x 48
Piers/Caissons Inspection - Residential Failed 5/8/2020 5/8/2020 05/08/2020
Misc
Corrective Action Required
04/24/2020
- PROVIDE (4) # 4 VERT BARS PER PLAN - (1) 24 X 36 (1) 24 x 48
Misc
Corrective Action Required
05/08/2020
REMOVE MUD AND WATER FROM EAST PIER (1) 36 X 53 (1) FULL OF MUD & WATER
Piers/Caissons Inspection - Residential Passed 5/11/2020 (11:00) 5/11/2020 05/11/2020
Misc
Resolved
05/11/2020
- PROVIDE (4) # 4 VERT BARS PER PLAN - (1) 24 X 36 (1) 24 x 48
Misc
Resolved
05/11/2020
REMOVE MUD AND WATER FROM EAST PIER (1) 36 X 53 (1) 30 X 36 W/ (4) # 4 VERT BARS EACH ON SITE
Gas Piping Inspection - Residential Passed 6/1/2020 6/1/2020 06/01/2020
Electrical Service Inspection Failed 6/1/2020 6/1/2020 06/01/2020
Misc
Corrective Action Required
06/01/2020
- Color code ufer ground
Gas Service Inspection - Residential Failed 6/1/2020 6/1/2020 06/01/2020
Misc
Corrective Action Required
06/01/2020
- Gas pressure at 5 psi, minimum 10 psi hold for 15 minutes
All Rough Inspection - Residential Failed 6/1/2020 6/1/2020 06/01/2020
Misc
Corrective Action Required
06/01/2020
- Seal all penetrations at top and bottom plates, penetrations for plumbing and electrical through floor - address stud with termite damage in garage - Tighten all anchor bolts in garage - PFH garage per plans - EC#2 hold downs per plans - Protect and secure pex at showers - Seal around gaps of Fireblock, NM electrical, and DWV at chase next to master shower - Protect and secure pex at laundry - Nail corner and framing intersections per code and plans - Fireblock all tub and shower traps - Truss bracing and hangers per plans - Fireblock above fireplace - Color code ufer ground - Fireblock between stud and foundation wall vertical every 10’ per code in finished basement - Fireblock gap at horizontal between top plate and foundation in finished basement per code - Install and secure pex through master bath floor and seal penetrations - Protection plates at DWV basement
All Rough Inspection - Residential Failed - Stop Work 6/15/2020 6/15/2020 06/15/2020
Misc
Corrective Action Required
06/01/2020
6/15/20 - NO INSPECTION PERFORMED, STOP WORK ISSUED, HOUSE HAS BEEN INSULATED AND SHEETROCK HAS BEEN INSTALLED WITHOUT APPROVAL. REMOVE ALL SHEETROCK AND INSULATION FOR INSPECTION. - Seal all penetrations at top and bottom plates, penetrations for plumbing and electrical through floor - address stud with termite damage in garage - Tighten all anchor bolts in garage - PFH garage per plans - EC#2 hold downs per plans - Protect and secure pex at showers - Seal around gaps of Fireblock, NM electrical, and DWV at chase next to master shower - Protect and secure pex at laundry - Nail corner and framing intersections per code and plans - Fireblock all tub and shower traps - Truss bracing and hangers per plans - Fireblock above fireplace - Color code ufer ground - Fireblock between stud and foundation wall vertical every 10’ per code in finished basement - Fireblock gap at horizontal between top plate and foundation in finished basement per code - Install and secure pex through master bath floor and seal penetrations - Protection plates at DWV basement
All Rough Inspection - Residential Failed - Stop Work 6/17/2020 06/17/2020
Misc
Corrective Action Required
06/15/2020
6/15/20 - NO INSPECTION PERFORMED, STOP WORK ISSUED, HOUSE HAS BEEN INSULATED AND SHEETROCK HAS BEEN INSTALLED WITHOUT APPROVAL. REMOVE ALL SHEETROCK AND INSULATION FOR INSPECTION. - Seal all penetrations at top and bottom plates, penetrations for plumbing and electrical through floor - Protect and secure pex at showers - Nail corner and framing intersections per code and plans - Truss bracing and hangers per plans - Fireblock between stud and foundation wall vertical every 10’ per code in finished basement - Fireblock gap at horizontal between top plate and foundation in finished basement per code -REAR WALL OF BASEMENT WE CANT SEE.
Misc
Corrective Action Required
06/17/2020
Fee due- REMOVE AL SHEETROCK FROM CEILINGS FOR INSPECTION. CONTACT MARK HARDING FOR RE-INSPECTION
All Rough Inspection - Residential Failed 6/23/2020 06/23/2020
Misc
Resolved
06/23/2020
6/15/20 - NO INSPECTION PERFORMED, STOP WORK ISSUED, HOUSE HAS BEEN INSULATED AND SHEETROCK HAS BEEN INSTALLED WITHOUT APPROVAL. REMOVE ALL SHEETROCK AND INSULATION FOR INSPECTION. - Seal all penetrations at top and bottom plates, penetrations for plumbing and electrical through floor - Protect and secure pex at showers - Nail corner and framing intersections per code and plans - Truss bracing and hangers per plans - Fireblock between stud and foundation wall vertical every 10’ per code in finished basement - Fireblock gap at horizontal between top plate and foundation in finished basement per code -REAR WALL OF BASEMENT WE CANT SEE.
Misc
Resolved
06/23/2020
Fee due- REMOVE AL SHEETROCK FROM CEILINGS FOR INSPECTION. CONTACT MARK HARDING FOR RE-INSPECTION
Misc
Corrective Action Required
06/23/2020
- Nail all double trusses per plans
All Rough Inspection - Residential Passed 6/24/2020 6/24/2020 06/24/2020
Misc
Resolved
06/24/2020
Driveway Inspection Passed 7/2/2020 (Ready Now) 7/2/2020 07/02/2020
Misc
Informational
07/02/2020
On Thursday, July 2, 2020. A driveway and sidewalk inspection was performed. Found subgrade and forms ready for concrete. Inspection passed!
Gas Service Inspection - Residential Failed 8/13/2020 8/13/2020 08/13/2020
Misc
Corrective Action Required
06/01/2020
- Gas pressure at 5 psi, minimum 10 psi hold for 15 minutes - 8/13 no gauge present for pressure test
Electrical Service Inspection Passed 8/13/2020 8/13/2020 08/13/2020
Misc
Resolved
08/13/2020
Gas Service Inspection - Residential Passed 8/20/2020 8/20/2020 08/20/2020
Misc
Resolved
08/20/2020
Occupancy Inspection - Codes Residential Failed 9/16/2020 9/16/2020 09/16/2020
Misc
Corrective Action Required
09/16/2020
- GFCI protection required at laundry receptacle - Adjust garage door to allow latching - Size rock used for attic access door to fit properly for opening - Handrail required at basement stairs - Living room floor receptacle to be flush with surface, no setback allowed with combustible surface - Basement stairs - 1/2 gypsum required at under side of stairs for protection R302.7 - Complete final grade and sod - Splash blocks at all downspout and sump pump discharge locations, minimum distance 36” from foundation - Final Sidewalk Inspection
Occupancy Inspection - Codes Residential Failed 9/25/2020 9/25/2020 09/25/2020
Misc
Corrective Action Required
09/16/2020
- Adjust garage door to allow latching - Living room floor receptacle to be flush with surface, no setback allowed with combustible surface - Complete final grade and sod - Splash blocks at all downspout and sump pump discharge locations, minimum distance 36” from foundation - Final Sidewalk Inspection
Sidewalk Inspection Passed 7/2/2020 (Ready Now) 9/29/2020 09/29/2020
Misc
Informational
09/28/2020
On July, 2 2020 and sidewalk inspection was performed and passed inspection.
Misc
Informational
09/28/2020
On July, 2 2020 and sidewalk inspection was performed and passed inspection.
Occupancy Inspection - Codes Residential Failed 10/7/2020 10/7/2020 10/07/2020
Misc
Corrective Action Required
09/25/2020
- Living room floor receptacle to be flush with surface, no setback allowed with combustible surface - Complete final grade and sod
Occupancy Inspection - Codes Residential Temporary C of O 10/9/2020 10/9/2020 10/09/2020
Misc
Corrective Action Required
10/07/2020
- Complete final grade and sod OK FOR TCO
Plot Plan Inspection Passed 11/09/2020
Occupancy Inspection - Codes Residential Full C of O 11/9/2020 11/9/2020 11/09/2020
Misc
Resolved
11/09/2020
Documents & Images
Date Uploaded File Type Document Name
12/11/2019 Receipt Receipt for transaction: 2019-007683
12/11/2019 Letter DS Building Permit
12/12/2019 Plot Plan DOC121219-12122019095412
01/07/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/11/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter Stop Work Order
06/17/2020 Letter Stop Work Order
06/18/2020 Receipt Receipt for transaction:2020-003289
06/23/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter Codes Temporary Certificate of Occupancy
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter Field Certificate of Occupancy
11/09/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home