PRRES20193370
Building Permit - Residential
Certificate of Occupancy
WOOD BROTHERS CONSTRUCTION INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
11/15/2019
12/05/2019
08/18/2022
Locations
Contacts
WOOD BROTHERS CONSTRUCTION INC, Address:PO BOX 553  
WOOD BROTHERS CONSTRUCTION INC, Address:PO BOX 553, Phone:(816) 564-5024  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
DAVE'S ELECTRIC, Address:1601 SW JEFFERSON ST, Phone:(816) 525-0409  
PREFERRED PLUMBING INC, Address:1664 NW 415TH RD, Phone:(816) 828-1680  
WOODBROTHERSINC@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/19/2019 11/20/2019
Kim Brennan
Basement elevation
Corrective Action Required
11/15/2019

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) Plot plan is showing a daylight and the Master Drainige Plan is calling for a full basement. Please change according to the Master Drainage Plan.
Residential Plan Review Rejected 11/19/2019 11/15/2019
Kim Brennan
09 Identify furnace and water heater locations
Corrective Action Required
11/15/2019

Identify furnace and water heater location(s). (IRC Section G2406)
Misc
Corrective Action Required
11/15/2019

Address on the plans show 217 NE Bluestone Dr and it should be 2017 NE Bluestone Dr
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,703.92 $1,703.92 Paid Not payable online 12/05/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid Not payable online 12/05/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid Not payable online 12/05/2019
8331507-Sewer Connection Fee $570.00 $570.00 Paid Not payable online 12/05/2019
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid Not payable online 12/05/2019
8350015-Water Meter Fee $425.02 $425.02 Paid Not payable online 12/05/2019
9110078-Valuation Fee New Single Family $62.77 $62.77 Paid 01/06/2021
$1,766.69
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/27/2019 (1:30) 12/27/2019 at 1:15 PM 12/27/2019
Erosion Control Inspection Residential Failed 2/20/2020 02/20/2020
DCM5 ESC INSP DENIED
Corrective Action Required
02/20/2020
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. INSTALL EROSION CONTROL ALONG STREET AND REAR. CLEAN STREET CURBS
Underslab Plumbing Inspection - Residential Failed 2/20/2020 2/20/2020 at 9:30 AM 02/20/2020
Misc
Corrective Action Required
02/20/2020
INSPECTION DENIED DUE TO LACK OF EROSION CONTROL
Piers/Caissons Inspection - Residential Passed 3/26/2020 at 1:00 PM 03/26/2020
Underslab Plumbing Inspection - Residential Passed 3/26/2020 03/26/2020
Misc
Resolved
03/26/2020
INSPECTION DENIED DUE TO LACK OF EROSION CONTROL
Sewer Service Inspection - R Passed 4/23/2020 (1:00) 4/23/2020 at 1:15 PM 04/23/2020
Water Service Inspection - R Passed 4/30/2020 at 9:05 AM 04/30/2020
All Rough Inspection - Residential Failed 5/12/2020 5/12/2020 at 10:40 AM 05/12/2020
Misc
Corrective Action Required
05/12/2020
FRAMING: -Remove the roof underlay from roof ventilation opening -The double joists under the great room is too far out from foundation wall. Sister another joist to this to triple -Nail triple stud shoe at kitchen/laundry wall. Have the engineer ok this bored triple stud reinforced with the stud shoe. Framer-install double joist under this point load ELECTRICAL: -Protect wiring at mud wall plate; stud near end of kitchen countertop -Protect wiring within six ft of attic access above master bedroom -Bond gas piping -Protect wiring running across bottom of joists near panel -Protect SE conductor connections to power bus bars at panel PLUMBING: -Nail triple stud shoe at kitchen/laundry wall. Have the engineer ok this bored triple stud reinforced with the stud shoe. Framer-install double joist under this point load **OK TO INSULATE
Electrical Service Inspection Passed 5/12/2020 5/12/2020 05/12/2020
Gas Service Inspection - Residential Passed 5/12/2020 5/12/2020 05/12/2020
All Rough Inspection - Residential Passed 5/26/2020 5/26/2020 05/26/2020
Misc
Resolved
05/26/2020
-Protect SE conductor connections to power bus bars at panel **OK TO ROCK
Driveway Inspection Partial 6/10/2020 6/10/2020 06/10/2020
Misc
Informational
06/10/2020
Driveway- forms and materials passed pre-inspection.
Sidewalk Inspection Partial 6/10/2020 6/10/2020 06/10/2020
Misc
Informational
06/10/2020
Sidewalk- forms and materials passed pre-inspection.
Sidewalk Inspection Passed 6/12/2020 6/12/2020 06/17/2020
Misc
Informational
06/10/2020
Sidewalk- forms and materials passed pre-inspection.
Misc
Informational
06/17/2020
Sidewalk - passed inspection.
Driveway Inspection Passed 6/12/2020 6/12/2020 06/22/2020
Misc
Informational
06/10/2020
Driveway- forms and materials passed pre-inspection.
Misc
Informational
06/22/2020
Driveway- passed final inspection.
Erosion Control Inspection Residential Failed 9/30/2020 09/30/2020
DCM5 ESC INSP DENIED
Corrective Action Required
02/20/2020
Spoke with Jud and he will have the side walk cleaned and install straw waddles
All Rough Inspection - Residential Passed 1/7/2021 1/7/2021 01/07/2021
Occupancy Inspection - Codes Residential Not Ready 3/11/2021 3/11/2021 03/11/2021
Misc
Corrective Action Required
03/11/2021
***3-11-21 Not ready*** -Multiple contractors on site working at time of inspection, reschedule when all work is complete and ready for inspection -Maintain erosion control until final sod is installed
Erosion Control Inspection Residential Passed 03/12/2021
DCM5 ESC INSP DENIED
Resolved
03/12/2021
Spoke with Jud and he will have the side walk cleaned and install straw waddles
Occupancy Inspection - Codes Residential Temporary C of O 3/12/2021 03/12/2021
Misc
Corrective Action Required
03/11/2021
-Lower water meter down to grade level -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Garage door not self closing -Garage receptacles shall be gfci-protected -Remove all foundation wall ties -TV receptacle above basement wet sink must be gfci -Label all breakers
Occupancy Inspection - Codes Residential Temporary C of O 3/15/2021 3/15/2021 03/15/2021
Misc
Corrective Action Required
03/12/2021
-Lower water meter down to grade level -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc
Occupancy Inspection - Codes Residential Full C of O 8/18/2022 08/18/2022
Misc
Resolved
08/18/2022
-Lower water meter down to grade level -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc
Documents & Images
Date Uploaded File Type Document Name
11/15/2019 Letter Codes Residential Plan Review
12/05/2019 Receipt Receipt for transaction: 2019-007598
12/05/2019 Letter DS Building Permit
12/05/2019 Engineer Report/Study DOC120519-006
12/05/2019 Plot Plan DOC120519-014
12/27/2019 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
03/26/2020 Letter INSPECTION SUMMARY
03/26/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
01/06/2021 Plans APPROVED BASEMENT FINISH
01/06/2021 Receipt Receipt for transaction:2021-000071
01/07/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter Codes Temporary Certificate of Occupancy
03/15/2021 Letter Codes Temporary Certificate of Occupancy
08/18/2022 Letter Codes Final Certificate of Occupancy
08/18/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home