Permit Application Status

PRRES20193135


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20193135
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED LANAI CLOSED WITH OPEN VIOLATIONS OR EXCEEDED PERMIT LIMITS
10/24/2019
11/05/2019
02/27/2024
Locations
Contacts
SIGNATURE BUILDERS KC LLC, Address:1516 SW HOOK RD, Phone:(816) 215-0891  
bill@sb-kc.net  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 10/28/2019 11/01/2019
Development Center
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
10/25/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) DID NOT PROVIDE UNFINISHED BASEMENT SQUARE FOOTAGE ON DRAWINGS.
07 Identify emergency escape openings from bedrooms
Corrective Action Required
10/25/2019

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) NEED CLARIFICATION ON HOME OFFICE. THERE IS A SMOKE DETECTOR BUT EGRESS IS NOT LABELED.
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
10/25/2019

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) COMBO DETECTOR IS LOCATED TO FAR FROM BEDROOM #2 and #3
10 Combustion air
Corrective Action Required
10/25/2019

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407) NEED COMBUSTION AIR CALCULATIONS OR NOTE SHOWING THE APPLIANCE IS DIRECT VENTED.
11 Designate R-value(s) for floors, walls, ceilings, roof/ceilings.
Corrective Action Required
10/25/2019

Designate R-value(s) for floors, walls, ceilings, roof/ceilings. (LSCO 7-802)
Miscellaneous Correction
Corrective Action Required
10/25/2019

SHEET A-104 INDICATES SUSPENED SLAB HOWEVER APPLICATION DID NOT INDICATE SUSPENDED SLAB. PLEASE CLARIFY.
Plot Plan Review Approved 10/28/2019 10/25/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,814.09 $1,814.09 Paid 11/05/2019
8331507-Sewer Connection Fee $690.00 $690.00 Paid 11/05/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 11/05/2019
Water Meter Fee $425.02 $425.02 Paid 11/05/2019
Right of Way Permit Fee $80.00 $80.00 Paid 11/05/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/05/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 08/10/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 11/15/2019 11/15/2019
DCM5 ESC INSP DENIED
Corrective Action Required
11/15/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. INSTALL EROSION CONTROL ALONG THE STREET
Footing Inspection - Residential Not Ready 11/15/2019 11/15/2019 at 4:30 PM 11/15/2019
Misc
Corrective Action Required
11/15/2019
NOT EVEN CLOSE TO BEING READY FOR INSPECTION. EROSION CONTROL NOT INSTALLED. INSPECTION DENIED. NOT-READY FEE ASSESSED
Footing Inspection - Residential Passed 11/18/2019 (9:00) 11/18/2019 11/18/2019
Misc
Corrective Action Required
11/15/2019
Install erosion control, ok to pour
Water Service Inspection - R Partial 12/26/2019 (1:00) 12/26/2019 12/26/2019
Sewer Service Inspection - R Passed 12/26/2019 (1:00) 12/26/2019 12/26/2019
Water Service Inspection - R Passed 12/27/2019 (10:00) 12/27/2019 12/27/2019
Underslab Plumbing Inspection - Residential Passed 12/30/2019 12/30/2019 12/30/2019
Piers/Caissons Inspection - Residential Passed 2/28/2020 2/28/2020 02/28/2020
Misc
Informational
02/28/2020
Deck piers approved per attached engineers letter
Gas Piping Inspection - Residential Passed 4/22/2020 04/22/2020
Gas Service Inspection - Residential Passed 4/22/2020 4/22/2020 04/22/2020
Electrical Service Inspection Passed 4/22/2020 4/22/2020 04/22/2020
All Rough Inspection - Residential Failed 4/22/2020 4/22/2020 04/22/2020
Misc
Corrective Action Required
04/22/2020
- SCH 40 COLUMNS BASEMENT 4.5 NOT PER PLAN - (2) 4.5 COLUMNS ONE ACROSS FROM STAIRWAY STILL 3"
All Rough Inspection - Residential Failed 4/24/2020 4/24/2020 04/24/2020
Misc
Corrective Action Required
04/24/2020
- (2) SCH 40 COLUMNS 4.5 PER PLAN (1) REPLACED THE OTHER STILL 3"
All Rough Inspection - Residential Passed 4/29/2020 04/29/2020
Misc
Resolved
04/29/2020
Sidewalk Inspection Partial 5/19/2020 5/19/2020 05/19/2020
Misc
Informational
05/19/2020
Forms were placed and aggregate was present and compacted. I informed Wilson about broom finish on all sidewalks. Also need a solid coat of white cure. He is using KCMMB mix. RP 5-19-20
Driveway Inspection Partial 5/19/2020 5/19/2020 05/19/2020
Misc
Informational
05/19/2020
Forms were placed and aggregate was present and compacted. RP 5-19-20
Driveway Inspection Passed 5/29/2020 05/29/2020
Misc
Informational
05/29/2020
Finished driveway meets LS and ADA specs. RP 5-29-20
Sidewalk Inspection Passed 5/29/2020 05/29/2020
Misc
Informational
05/29/2020
Finished sidewalk meets LS and ADA specs. RP 5-29-20
Occupancy Inspection - Codes Residential Failed 8/10/2020 8/10/2020 08/10/2020
Informational
11/15/2019
NOTE: NOT-READY FEE ASSESSED AT FOOTING INSPECTION -11/15/19
Misc
Corrective Action Required
08/10/2020
- 4" SPHERE SHALL NOT PASS THROUGH DECK RAIL NEAR GFCI - - PROVIDE LAWN IRRIGATION PERMIT SUBMIT BACKFLOW CERTIFICATION -
Occupancy Inspection - Codes Residential Temporary C of O 8/13/2020 8/13/2020 08/13/2020
Misc
Corrective Action Required
08/13/2020
- 4" SPHERE SHALL NOT PASS THROUGH DECK RAIL NEAR GFCI - - PROVIDE LAWN IRRIGATION PERMIT SUBMIT BACKFLOW CERTIFICATION -
Plot Plan Inspection Passed 8/6/2020 08/13/2020
Documents & Images
Date Uploaded File Type Document Name
10/30/2019 Letter Codes Residential Plan Review
11/05/2019 Receipt Receipt for transaction: 2019-007193
11/05/2019 Letter DS Building Permit
11/14/2019 Plot Plan DOC111419-11142019085415
11/15/2019 Letter INSPECTION SUMMARY
11/15/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
12/30/2019 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/24/2020 Notched LVLs & Bolted Steel Engineer Letter For Inspection
04/24/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
08/10/2020 Receipt Receipt for transaction:2020-005068
08/10/2020 Letter INSPECTION SUMMARY
08/11/2020 Retaining Wall Engineer Report
08/13/2020 Letter Codes Temporary Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home