Summary
PRRES20192061
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED PATIO
07/31/2019
08/07/2019
07/28/2020
Locations
Contacts
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
DANDDBUILDING@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION LLC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 08/02/2019 08/07/2019
Dylan Eppert
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
07/31/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) COVERED PATIO SQUARE FOOTAGE MUST BE DOCUMENTED ON THE CONSTRUCTION DRAWINGS.
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
07/31/2019

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) CARBON MONOXIDE DETECTOR MUST BE DOCUMENTED IN THE BASMENT AREA BETWEEN BEDROOM #3 AND BEDROOM #4
12 Detail required separation between garage and living area including door
Corrective Action Required
07/31/2019

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) DOOR MUST BE SELF-CLOSING AND IS NOT DOCUMENTED AS SUCH ON SHEET 7.
Plot Plan Review Approved 08/02/2019 08/06/2019
Steve Conrick
Legal description
Corrective Action Required
08/01/2019

The legal description, including plat or phase number and lot number, and street address must be provided on the plot plan. *Street name in front of lot is incorrect
Miscellaneous Correction
Corrective Action Required
08/01/2019

Check attached adjacent plot plan. There will be a 4' difference in basement elevations whereas the MDP shows the lots falling straight back toward the swale. This could cause issues on lot 98. Adjust as necessary.
City infrustructure
Corrective Action Required
08/01/2019

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Show storm structure in swale in rear yard
Drainage swales
Corrective Action Required
08/01/2019

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provided *Call out swale in rear yard with swale data and section from As-graded MDP.
As-graded plot plan
Corrective Action Required
08/01/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. *add "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING." in a bubble.
Basement egress
Corrective Action Required
08/01/2019

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan. *Show all egress wells on plot plan and walk out elevtion/egress well elevations may need to be adjusted based off of adjacent plot plan.
Spot elevations
Corrective Action Required
08/01/2019

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. *Add contours or provide spot elevations along north and south lines.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $922.80 $922.80 Paid 08/07/2019
8331507-Sewer Connection Fee $450.00 $450.00 Paid 08/07/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 08/07/2019
Water Meter Fee $425.02 $425.02 Paid 08/07/2019
Right of Way Permit Fee $80.00 $80.00 Paid 08/07/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/07/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/15/2019 8/15/2019 at 9:50 AM 08/15/2019
Underslab Plumbing Inspection - Residential Passed 8/30/2019 8/29/2019 at 3:20 PM 08/29/2019
Sewer Service Inspection - R Passed 8/30/2019 8/30/2019 08/30/2019
Water Service Inspection - R Passed 8/30/2019 8/30/2019 at 2:25 PM 08/30/2019
Erosion Control Inspection Residential Failed 8/30/2019 08/30/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/30/2019
DEFICIENT EROSION CONTROL INSTALLATION. CLEAN STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Erosion Control Inspection Residential Failed 10/22/2019 10/22/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/30/2019
DEFICIENT EROSION CONTROL INSTALLATION. CLEAN STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM5 ESC INSP DENIED
Corrective Action Required
10/22/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. Swale at rear yard needs to be Corrected and silt fence established. silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. Contact Steve Robbins or Mark Harding
Piers/Caissons Inspection - Residential Passed 11/4/2019 (1:45) 11/4/2019 at 2:25 PM 11/04/2019
Gas Service Inspection - Residential Passed 11/21/2019 11/21/2019 11/21/2019
All Rough Inspection - Residential Failed 12/13/2019 12/13/2019 at 8:00 AM 12/13/2019
Misc
Corrective Action Required
12/13/2019
FRAMING: -Fb all floor penetrations -Install door frames per security code -Complete framing at fireplace -Provide full support for stoop roof beam in front bedroom closet -Fb basement wall from joist space and fur-down ceiling space; Fb basement wall vertically at max ten interval -Complete ceiling framing above basement bathroom -Insulate cantilevered joists and solid block cantilevered joists above rear basement bedroom wall ELECTRICAL: -Complete fireplace electrical -Complete electrical above basement bathroom PLUMBING: -Complete plumbing in master bathroom; protect plumbing where required -Slope vent in attic toward drain -Protect plumbing at basement bathroom/storage wall MECHANICAL: -Pan off return air space from ceiling fur-down space at basement bedroom door **OK TO INSULATE
Electrical Service Inspection Failed 12/13/2019 12/13/2019 12/13/2019
Misc
Corrective Action Required
12/13/2019
-Protect SE conductor connections to main breaker
All Rough Inspection - Residential Failed 12/31/2019 12/31/2019 at 8:25 AM 12/31/2019
Misc
Corrective Action Required
12/13/2019
-Install door frames per security code **Install door frame; install security blocking; fill in any gap behind hinges and strike plate side with solid wood -Fb basement wall from joist space and fur-down ceiling space **wall still not fireblocked from ceiling space
All Rough Inspection - Residential Failed 1/6/2020 1/6/2020 01/06/2020
Misc
Corrective Action Required
12/31/2019
-Fb basement wall from joist space and fur-down ceiling space **wall still not fireblocked from ceiling space,, wal and ceiling not fire stopped. Need to block vertical to horizontal at drop ceiling height from wall. north side of basement , dead space at shower needs fire stopped vertical to horizontal also.
Erosion Control Inspection Residential Failed 1/6/2020 01/06/2020
DCM2 ESC DEFICIENT INSTALLATION
Resolved
11/04/2019
DEFICIENT EROSION CONTROL INSTALLATION. CLEAN STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MARK HARDING 01/06/2020 10:02 AM
DCM5 ESC INSP DENIED
Corrective Action Required
10/22/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. Swale at rear yard needs to be Corrected and silt fence established. silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. Contact Steve Robbins or Mark Harding
All Rough Inspection - Residential Passed 1/9/2020 01/09/2020
Misc
Resolved
01/09/2020
-Fb basement wall from joist space and fur-down ceiling space **wall still not fireblocked from ceiling space,, wal and ceiling not fire stopped. Need to block vertical to horizontal at drop ceiling height from wall. north side of basement , dead space at shower needs fire stopped vertical to horizontal also.
Electrical Service Inspection Passed 1/17/2020 1/17/2020 at 9:05 AM 01/17/2020
Misc
Resolved
01/17/2020
-Protect SE conductor connections to main breaker
Driveway Inspection Partial 5/11/2020 03/18/2020
Misc
Informational
03/18/2020
Driveway - forms and materials passed pre-inspection.
Driveway Inspection Passed 3/18/2020 (Ready Now) 3/18/2020 04/22/2020
Misc
Informational
04/22/2020
Driveway- passed final inspection.
Occupancy Inspection - Codes Residential Failed 5/1/2020 5/1/2020 at 9:40 AM 05/01/2020
Misc
Corrective Action Required
05/01/2020
**Swale at rear yard needs to be corrected. Silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. -As-graded plot plan is required -Get OK from the water meter dept for water meter more than 18” below lid -Lawn irrigation permit required -Install downspout splash blocks or extensions -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Secure AC whip within 12” of disconnect -Grounding rod shall be straightened and driven down flush to grade with grounding clamp under grade -Broken window in master bathroom water closet room -City amendment of the NEC requires all dedicated non-gfci receptacles in garage and unfinished basement to be identified (label, marking, etc) -Install box extensions for switch & receptacle boxes recessed more than 1/4” behind kitchen countertop backsplash -Provide gfci protection for 15-20 amp laundry outlet per NEC 210.8(A) -Stair handrail shall extend from top stair riser to bottom stair riser -Receptacle located within 6 ft of the wet bar sink must be gfci-protected -Install breaker lock for out-of-sight water heater -Provide AFCI protection for all outlets required per NEC 210.12 (dish washer/disposal) -Install max 40 amp breaker for AC -Furnace condensate line must be able to be cleaned out -Comply wiring to water heater -Secure lawn irrigation water pex line -Remove all metal foundation wall ties -Smoke alarm in master bedroom not interconnected with other smoke alarms. Check all
Erosion Control Inspection Residential Passed 06/24/2020
DCM5 ESC INSP DENIED
Resolved
06/24/2020
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. Swale at rear yard needs to be Corrected and silt fence established. silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. Contact Steve Robbins or Mark Harding
Occupancy Inspection - Codes Residential Failed 6/24/2020 6/24/2020 at 9:10 AM 06/24/2020
Misc
Corrective Action Required
05/01/2020
**Swale at rear yard needs to be corrected. Silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. -As-graded plot plan is required. Submit the as-graded plot plan to the development technician (Steven Conrick, Kim) -Grounding rod shall be straightened and driven down flush to grade with grounding clamp under grade -Stair handrail shall extend from top stair riser to bottom stair riser -Furnace condensate line must be able to be cleaned out -Secure lawn irrigation water pex line to foundation wall
Occupancy Inspection - Codes Residential Temporary C of O 7/23/2020 7/23/2020 at 9:05 AM 07/23/2020
Misc
Corrective Action Required
06/24/2020
**Swale at rear yard needs to be corrected. Silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. -As-graded plot plan is required. Submit the as-graded plot plan to the development technician (Steven Conrick, Kim)
Plot Plan Inspection Passed 7/28/2020 07/28/2020
Occupancy Inspection - Codes Residential Full C of O 07/28/2020
Misc
Resolved
07/28/2020
**Swale at rear yard needs to be corrected. Silted in swale needs to be cleaned out and approved by Steve Robbins prior to sod. -As-graded plot plan is required. Submit the as-graded plot plan to the development technician (Steven Conrick, Kim)
Documents & Images
Date Uploaded File Type Document Name
07/31/2019 Letter Codes Residential Plan Review
08/01/2019 Letter Codes Residential Plan Review
08/07/2019 Receipt Receipt for transaction: 2019-005401
08/07/2019 Letter DS Building Permit
08/14/2019 Plot Plan DOC081219-08122019141151
08/15/2019 Letter INSPECTION SUMMARY
08/29/2019 Letter INSPECTION SUMMARY
08/30/2019 Letter INSPECTION SUMMARY
08/30/2019 Letter INSPECTION SUMMARY
08/30/2019 Letter INSPECTION SUMMARY
10/22/2019 Letter INSPECTION SUMMARY
11/04/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/17/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter Codes Temporary Certificate of Occupancy
07/28/2020 Plot Plan Plot Plan
07/28/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter Codes Final Certificate of Occupancy
07/28/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home