Summary
PRRES20183233
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE FINSIHED AND UNFINISHED BASEMENT COVERED DECK
09/24/2018
10/02/2018
06/22/2020
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
NZVACEK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/26/2018 09/27/2018
Brandon Kalwei
Plot Plan Review Approved 09/26/2018 09/26/2018
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,306.04 $1,306.04 Paid 10/02/2018
Right of Way Permit Fee $80.00 $80.00 Paid 10/02/2018
8331507-Sewer Connection Fee $510.00 $510.00 Paid 10/02/2018
Water Tap Fee $3,409.00 $3,409.00 Paid 10/02/2018
Water Meter Fee $408.37 $408.37 Paid 10/02/2018
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/22/2018 (3:00) 10/22/2018 at 2:50 PM 10/22/2018
Underslab Plumbing Inspection - Residential Failed 11/26/2018 at 10:55 AM 11/26/2018
Misc
Corrective Action Required
11/26/2018
-PLUMBING COVERED
Sewer Service Inspection - R Partial 11/30/2018 11/30/2018 at 2:35 PM 11/30/2018
Misc
Corrective Action Required
11/30/2018
-PARTIAL ABOUT TEN FT OUT FROM HOUSE
Sewer Service Inspection - R Passed 12/3/2018 (11:30) 12/3/2018 at 12:50 PM 12/03/2018
Misc
Resolved
12/03/2018
-PARTIAL ABOUT TEN FT OUT FROM HOUSE
Water Service Inspection - R Partial 12/3/2018 12/03/2018
Underslab Plumbing Inspection - Residential Passed 12/4/2018 12/3/2018 at 1:00 PM 12/03/2018
Misc
Resolved
12/03/2018
-PLUMBING COVERED
Water Service Inspection - R Passed 12/4/2018 (1:00) 12/4/2018 at 1:05 PM 12/04/2018
Gas Service Inspection - Residential Passed 3/19/2019 3/15/2019 03/15/2019
Electrical Service Inspection Passed 3/19/2019 3/15/2019 03/15/2019
All Rough Inspection - Residential Failed 3/19/2019 3/15/2019 at 8:25 AM 03/15/2019
Misc
Corrective Action Required
03/15/2019
FRAMING: -Provide city approved plan on site (with the red stamp) -Garage portal wall: seam must be within 24” of mid-wall height and must be blocked and nailed w/8d@3” oc; nail the foundation strap with 16d nails; strap interior side per code. Get longer straps please; install 2” washers -Frame door to half bath -Install 3 stud support for lvl at mud -Install joist hanger above pantry -Insulate first, then solidblock all cantilevered joists above exterior walls -Staple insulation used as fireblocking material -Install hangers at I beam connections above front dining rm angled wall; at lvl connection above top stair landing; above middle bedroom -Fb master closet/shower wall from roof -Header off cut joists above furnace ELECTRICAL: -Install wall receptacles in basement room per code -Fasten all wiring in basement ceiling fur-down per code, not just resting on framing -Bond subpanel enclosure **OK TO INSULATE
All Rough Inspection - Residential Failed 4/4/2019 4/4/2019 at 11:00 AM 04/04/2019
Misc
Corrective Action Required
03/15/2019
FRAMING: -Provide city approved plan on site (with the red stamp) **Install double joists above garage per plan -Garage portal wall: seam must be within 24” of mid-wall height and must be blocked and nailed w/8d@3” oc; nail the foundation strap with 16d nails -Install 3 stud support for lvl at mud -Insulate first, then solidblock all cantilevered joists above exterior walls **front dining ELECTRICAL: -Install wall receptacles in basement room per code -Fasten all wiring in basement ceiling fur-down per code, not just resting on framing -Bond subpanel enclosure **OK TO INSULATE
All Rough Inspection - Residential Partial 4/12/2019 4/12/2019 at 8:00 AM 04/12/2019
Misc
Corrective Action Required
04/04/2019
-Garage portal wall: seam must be within 24” of mid-wall height and must be blocked and nailed w/8d@3” oc; nail the foundation strap with 16d nails **THE LARGE ROOM IN THE BASEMENT IS TO BE UNFINSIHED. **ELECTRICIAN-PLEASE ONE NEUTRAL CONDUCTOR PER LUG HOLE. YOU CAN HAVE TWO EQUIPMENT GROUNDING CONDUCTORS (OR 3 DEPENDS ON PANEL) PER LUG, BUT NOT THE NEUTRAL CONDUCTORS **OK TO ROCK
Piers/Caissons Inspection - Residential Passed 4/16/2019 (8:00) 4/16/2019 at 9:40 AM 04/16/2019
Driveway Inspection Partial 4/15/2019 (P.M.) 4/15/2019 04/19/2019
Corrective Action Required
04/18/2019
Not ready
Misc
Informational
04/19/2019
Forms and materials passed pre-inspection.
Driveway Inspection Passed 4/19/2019 4/19/2019 04/25/2019
Informational
04/19/2019
Forms and materials passed pre-inspection.
Misc
Informational
04/25/2019
Final Inspection Passed.
Driveway Inspection Passed 4/26/2019 04/29/2019
Misc
Informational
04/29/2019
Driveway Final Inspection Passed
All Rough Inspection - Residential Passed 5/1/2019 at 11:05 AM 05/01/2019
Misc
Informational
05/01/2019
**THE LARGE ROOM IN THE BASEMENT IS TO BE UNFINSIHED. **ELECTRICIAN-PLEASE ONE NEUTRAL CONDUCTOR PER LUG HOLE. YOU CAN HAVE TWO EQUIPMENT GROUNDING CONDUCTORS (OR 3 DEPENDS ON PANEL) PER LUG, BUT NOT THE NEUTRAL CONDUCTORS **OK TO ROCK
Occupancy Inspection - Codes Residential Failed 12/6/2019 12/6/2019 at 8:00 AM 12/06/2019
Misc
Corrective Action Required
07/15/2019
**THE REAR LANDSCAPE DOES NOT MEET THE REQUIREMENT OF CITY ORDINANCE **SUBSTITUTE BILL NO. 15-118, ORDINANCE NO.7690 10. That builders be required to put in a minimum of three Evergreen trees, two ornamental trees and three shrubs, one each lot adjacent to the Lake Ridge Meadows and Dalton's Ridge subdivisions, acknowledging that the goal is to provide a visual buffer for the property to the north. No final certi?cate of occupancy shall be issued for an individually affected lot until such time as the required number of trees and shrubs are planted on said lot. The required landscaping shall be planted within 20 feet of the rear property line. The required landscaping shall meet the minimum size requirements of the U00 at the time of planting (i.e. 8' for Evergreen trees, 3” caliper for ornamental trees and 2- gallon container for shrubs).
Misc
Corrective Action Required
12/06/2019
-Lawn irrigation permit -Locate sewer tracer wire and install the sewer tracer box -Provide min 3 ft discharge at downspouts and sump pump discharge -Rear steps outside slide door not built -Install roof soffit grill at east side of house -Install tamper-proof caps at AC valves -Seal exterior wall penetration -Raise AC support bed to min 3” above grade -Install secondary lock device for slide door per security code -Install receptacle in garage -Isolate low voltage from normal wire in fireplace switch box -Mount smoke alarm to ceiling of front bedroom -Provide mean to clean out furnace condensate drain
Occupancy Inspection - Codes Residential Temporary C of O 6/16/2020 6/16/2020 at 11:00 AM 06/16/2020
Misc
Resolved
06/16/2020
**THE REAR LANDSCAPE DOES NOT MEET THE REQUIREMENT OF CITY ORDINANCE **SUBSTITUTE BILL NO. 15-118, ORDINANCE NO.7690 10. That builders be required to put in a minimum of three Evergreen trees, two ornamental trees and three shrubs, one each lot adjacent to the Lake Ridge Meadows and Dalton's Ridge subdivisions, acknowledging that the goal is to provide a visual buffer for the property to the north. No final certi?cate of occupancy shall be issued for an individually affected lot until such time as the required number of trees and shrubs are planted on said lot. The required landscaping shall be planted within 20 feet of the rear property line. The required landscaping shall meet the minimum size requirements of the U00 at the time of planting (i.e. 8' for Evergreen trees, 3” caliper for ornamental trees and 2- gallon container for shrubs).
Misc
Corrective Action Required
12/06/2019
-Lawn irrigation permit
Occupancy Inspection - Codes Residential Full C of O 6/22/2020 6/22/2020 06/22/2020
Misc
Resolved
06/22/2020
-Lawn irrigation permit
Documents & Images
Date Uploaded File Type Document Name
10/02/2018 Receipt Receipt for transaction: 2018-006664
10/02/2018 Letter Codes Building Permit
10/02/2018 Plot Plan DOC100218-10022018141822
10/22/2018 Letter Inspection Summary
11/30/2018 Letter INSPECTION SUMMARY
12/03/2018 Letter INSPECTION SUMMARY
12/04/2018 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
04/04/2019 Letter INSPECTION SUMMARY
04/12/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter DE-Daily Inspection Summary
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/25/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
06/16/2020 Letter Codes Temporary Certificate of Occupancy
06/22/2020 Letter Codes Final Certificate of Occupancy
06/22/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home