Permit Application Status

PRRES20181758


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20181758
Building Permit - Residential
Certificate of Occupancy
JFE CONSTRUCTION INC
NEW SINGLE FAMILY
NEW HOUSE UNFINISHED BASEMENT COVERED DECK
06/08/2018
07/17/2018
09/22/2021
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
MOOSE ELECTRICAL CONSTRUCTION LLC, Address:105 HARLEQUIN DR, Phone:(816) 682-2693  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 07/13/2018 07/13/2018
Steve Conrick
Drainage swales
Corrective Action Required
07/12/2018

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provide ***Please provide more information on the swale (spot elevations, detail, etc)***
As-graded plot plan
Corrective Action Required
07/12/2018

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. ***Please put in a bubble "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING"
Residential Plan Review Approved 06/12/2018 06/08/2018
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,091.77 $1,091.77 Paid 07/17/2018
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 07/17/2018
8331507-Sewer Connection Fee $570.00 $570.00 Paid 07/17/2018
8331401-Water Tap Fee $3,343.00 $3,343.00 Paid 07/17/2018
8350015-Water Meter Fee $431.83 $431.83 Paid 07/17/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/19/2018 (8:30) 7/19/2018 07/19/2018
Underslab Plumbing Inspection - Residential Passed 7/31/2018 7/31/2018 at 10:15 AM 07/31/2018
Piers/Caissons Inspection - Residential Passed 8/15/2018 (1:30) 8/15/2018 at 2:30 PM 08/15/2018
Sewer Service Inspection - R Passed 8/22/2018 (2:30) 8/22/2018 at 3:30 PM 08/22/2018
Water Service Inspection - R Passed 8/23/2018 (9:15) 8/23/2018 at 9:45 AM 08/23/2018
All Rough Inspection - Residential Failed 12/5/2018 12/5/2018 at 10:00 AM 12/05/2018
Misc
Corrective Action Required
12/05/2018
• add anchor within 12” at splice sill plate south side garage • Strap garage portal • Add anchor at north sill plate garage where walls transition • Add joist hanger at attic access • Protect water lines in mud room and tie top plate together • Add hanger at I joist to lvl connection in mudroom • Support lvl at west breakfast • Provide engineers report on overnotched lvl at west breakfast • Fir out drop steel beam in garage • Replace stud in front bedroom 2nd fl • egress window in basement not installed • Egress well in basement is damaged • Support stair landing in basement Add ledger locks at deck ledger connection
Electrical Service Inspection Passed 12/5/2018 12/5/2018 12/05/2018
Gas Piping Inspection - Residential Failed 12/5/2018 12/05/2018
Misc
Corrective Action Required
12/05/2018
0 PSI IN GAS LINE
Gas Service Inspection - Residential Passed 12/5/2018 12/5/2018 12/05/2018
Gas Piping Inspection - Residential Passed 12/18/2018 12/18/2018 12/18/2018
Misc
Resolved
12/18/2018
0 PSI IN GAS LINE
All Rough Inspection - Residential Passed 12/18/2018 12/18/2018 12/18/2018
Misc
Resolved
12/18/2018
•add anchor within 12” at splice sill plate south side garage •Strap garage portal •Add anchor at north sill plate garage where walls transition •Add joist hanger at attic access •Protect water lines in mud room and tie top plate together •Add hanger at I joist to lvl connection in mudroom •Support lvl at west breakfast •Provide engineers report on overnotched lvl at west breakfast •Fir out drop steel beam in garage •Replace stud in front bedroom 2nd fl •egress window in basement not installed •Support stair landing in basement Add ledger locks at deck ledger connection
Driveway Inspection Partial 4/16/2019 (P.M.) 4/16/2019 04/16/2019
Misc
Informational
04/16/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 4/18/2019 4/18/2019 04/18/2019
Misc
Corrective Action Required
04/18/2019
-tempered glass above master bath tub -hammer resister for laundry upstairs? -sheet rock underneath stairs in basement -final grade, splash blocks, final grade plot plan required
Driveway Inspection Passed 4/23/2019 04/24/2019
Misc
Informational
04/16/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Plot Plan Inspection Failed 5/30/2019 06/06/2019
Occupancy Inspection - Codes Residential Temporary C of O 7/22/2019 07/22/2019
Misc
Corrective Action Required
04/18/2019
final grade, splash blocks, final grade plot plan required
Occupancy Inspection - Codes Residential Full C of O 09/22/2021
Misc
Resolved
09/22/2021
final grade, splash blocks, final grade plot plan required
Documents & Images
Date Uploaded File Type Document Name
07/12/2018 Letter Codes Residential Plan Review
07/17/2018 Receipt Receipt for transaction: 2018-004923
07/17/2018 Letter Codes Building Permit
07/17/2018 Plot Plan DOC071718-07172018153252
07/19/2018 Letter Inspection Summary
07/31/2018 Letter Inspection Summary
08/15/2018 Letter Inspection Summary
08/22/2018 Letter Inspection Summary
08/23/2018 Letter Inspection Summary
12/05/2018 Letter INSPECTION SUMMARY
12/05/2018 Letter INSPECTION SUMMARY
12/05/2018 Letter INSPECTION SUMMARY
12/05/2018 Letter INSPECTION SUMMARY
12/18/2018 Letter INSPECTION SUMMARY
12/18/2018 Letter INSPECTION SUMMARY
12/19/2018 Engineer Report/Study 2618 SW River Trail Rd_Framing Evaluation Report_12-13-18
04/16/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
07/22/2019 Letter Codes Temporary Certificate of Occupancy
09/22/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home