PRRES20181168
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
04/17/2018
05/22/2018
07/29/2019
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/20/2018 04/20/2018
Development Center
Residential Plan Review Approved 04/20/2018 04/18/2018
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,042.42 $1,042.42 Paid 05/22/2018
Right of Way Permit Fee $75.00 $75.00 Paid 05/22/2018
8331507-Sewer Connection Fee $570.00 $570.00 Paid 05/22/2018
Water Tap Fee $3,343.00 $3,343.00 Paid 05/22/2018
Water Meter Fee $431.83 $431.83 Paid 05/22/2018
Not Ready Inspection Fee $50.00 $50.00 Paid 05/08/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 05/08/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/22/2018 5/22/2018 at 10:15 AM 05/22/2018
Underslab Plumbing Inspection - Residential Passed 6/18/2018 at 8:35 AM 06/18/2018
Erosion Control Inspection Residential Passed 6/18/2018 06/18/2018
Piers/Caissons Inspection - Residential Passed 7/10/2018 7/10/2018 at 9:15 AM 07/10/2018
Misc
Corrective Action Required
07/10/2018
OK TO POUR
Sewer Service Inspection - R Failed 7/24/2018 at 1:25 PM 07/24/2018
Misc
Corrective Action Required
07/24/2018
-PROVIDE CLEANOUT FOR SEWER PIPE WITH 4 ELBOWS EVERY 40 FT
Sewer Service Inspection - R Passed 7/24/2018 at 2:15 PM 07/24/2018
Misc
Resolved
07/24/2018
-PROVIDE CLEANOUT FOR SEWER PIPE WITH 4 ELBOWS EVERY 40 FT
Underslab Plumbing Inspection - Residential Passed 5/10/2019 7/27/2018 at 9:35 AM 07/27/2018
Electrical Service Inspection Passed 8/16/2018 08/16/2018
Gas Service Inspection - Residential Passed 8/16/2018 08/16/2018
All Rough Inspection - Residential Failed 8/16/2018 at 9:50 AM 08/16/2018
Misc
Corrective Action Required
08/16/2018
FRAMING: -Nail garage portal wall sheathing per code. Remove the trims as well for full verification ; install 2” washers for anchor bolts; strap per plan -Shim gap under garage stud and nail stud to sill -Anchor sill plate within 12” of break. Min 2 anchors required for each short sill plate -Shorten garage hip rafter span. Support to beam, not ceiling joist -2x10 @12” oc above garage -Fb duct chase from joist space; insulation used as Fb material must be min 16” from ceiling level down -Install hanger for double joist connection at stair -Nail ceiling joists to wall top plate -Nail wall bottom plate to rim or joist below -Block rear exterior door at hinge side -Toe nail joists to basement sill plates with 3-8d nails -Solidblock all joist ends above basement I beam -Nail joist hanger above bottom stair landing -Solidblock cantilevered joists (under fireplace) -Install joist hangers under half bath -Install full stud support to carry 2nd fl ceiling lvl beam point load all the way to basement I beam -Nail corner studs per code on 2nd fl -Nail wall intersections -Move roof support struts above 2nd fl to bearing wall. NOTE: the lvl below does not extend all the way to garage bearing wall, so it cannot be used to carry roof load PLUMBING: -Protect water lines at master shower MECHANICAL: -Tape dryer duct joint -Secure fireplace to framing -Tape all duct joints in basement ELECTRICAL: -Install floodlight at rear -Protect wiring at wall top plate in front dining room; bottom plate at pantry -Fasten wiring min 1.25” from stud surface at bottom stair landing -Protect SE cable across bottom of joists. FYI: SE cable protection same as NM cable. **DO NOT INSULATE
Driveway Inspection Partial 8/17/2018 8/17/2018 08/20/2018
Legal description
Corrective Action Required
04/18/2018
The legal description, including plat or phase number and lot number, and street address must be provided on the plot plan. **Revise the street name to NE Brandywine Rd in plan view.**
Property boundary
Corrective Action Required
04/18/2018
Property boundary distances and bearings, as shown on the recorded plat, must be provided on the plot plan. **The rear property line distance per plat is 92.71', remove the extra 91.30' dimension.** ***Revise the east property line bearing from S & W to N & E to match the plat.***
Miscellaneous Correction
Corrective Action Required
04/18/2018
**Show the water line that runs through the lot near the east property line.**
Informational
08/20/2018
John Jackson checked on this and it appeared to be formed up and rock was compacted. It is ready to pour.Steve Robbins 08/20/2018 3:45 PM
Sidewalk Inspection Partial 8/17/2018 8/17/2018 08/20/2018
PW-Misc
Informational
08/20/2018
John Jackson did this for me, the sidewalk was formed the rock was installed and compacted and everything appeared to be up to standard.Steve Robbins 08/20/2018 3:55 PM
All Rough Inspection - Residential Failed 8/24/2018 8/24/2018 at 9:45 AM 08/24/2018
Misc
Corrective Action Required
08/16/2018
-2x10 @12” oc above garage per plan -Insulation used as fireblocking material must be min 16” from ceiling level down at master bath shower wall -Install hanger for double joist connection at stair -Toe nail joists to basement sill plates with 3-8d nails -Nail corner studs per code on 2nd fl -Nail wall intersections -Move roof support struts above 2nd fl to bearing wall. NOTE: use the bearing wall at stair **DO NOT INSULATE BASEMENT
Driveway Inspection Passed 8/28/2018 at 11:00 AM 08/28/2018
Legal description
Corrective Action Required
08/20/2018
The legal description, including plat or phase number and lot number, and street address must be provided on the plot plan. **Revise the street name to NE Brandywine Rd in plan view.**
Property boundary
Corrective Action Required
08/20/2018
Property boundary distances and bearings, as shown on the recorded plat, must be provided on the plot plan. **The rear property line distance per plat is 92.71', remove the extra 91.30' dimension.** ***Revise the east property line bearing from S & W to N & E to match the plat.***
Sidewalk Inspection Passed 8/28/2018 at 11:10 AM 08/28/2018
PW-Misc
Informational
08/20/2018
John Jackson did this for me, the sidewalk was formed the rock was installed and compacted and everything appeared to be up to standard.Steve Robbins 08/20/2018 3:55 PM
PW-Misc
Informational
08/28/2018
Meets specification John Jackson 08/28/2018 12:05 PM
PW-Misc
Informational
08/28/2018
Meets spec.John Jackson 08/28/2018 12:11 PM
Corrective Action Required
08/28/2018
All Rough Inspection - Residential Failed 8/30/2018 8/30/2018 at 8:55 AM 08/30/2018
Misc
Corrective Action Required
08/24/2018
-2x10 @12” oc above garage per plan -ADDENUM: fix the framing at attic access above the garage. The joist was cut short (by the garage door guy?) and has no hanger support. -Install hanger for double joist connection at stair. As an alternative, the framer can install Simpson L support brackets on both sides of the double joist -Resecure&support wiring above 2nd fl. The framer removed the wiring when relocate theroof supporting struts to the bearing wall **OK TO INSULATE
All Rough Inspection - Residential Failed 9/5/2018 at 9:45 AM 09/05/2018
Misc
Corrective Action Required
08/30/2018
-Install hanger for double joist connection at stair. As an alternative, the framer can install Simpson L support brackets on both sides of the double joist -Resecure&support wiring above 2nd fl. The framer removed the wiring when relocate theroof supporting struts to the bearing wall -Rewire the circuit to garage ceiling garage opener outlet **OK TO INSULATE
All Rough Inspection - Residential Failed 9/7/2018 9/7/2018 at 1:25 PM 09/07/2018
Misc
Corrective Action Required
09/05/2018
-Install hanger for double joist connection at stair. As an alternative, the framer can install Simpson L support brackets on both sides of the double joist SEPT-7-REINSPECTION FEE ASSESSED **OK TO INSULATE
All Rough Inspection - Residential Passed 9/11/2018 9/11/2018 at 12:50 PM 09/11/2018
Misc
Resolved
09/11/2018
-Install hanger for double joist connection at stair. As an alternative, the framer can install Simpson L support brackets on both sides of the double joist SEPT-7-REINSPECTION FEE ASSESSED **OK TO INSULATE
Erosion Control Inspection Residential Failed 5/2/2019 05/02/2019
DCM5 ESC INSP DENIED
Corrective Action Required
05/02/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Occupancy Inspection - Codes Residential Not Ready 5/2/2019 at 7:30 AM 05/02/2019
Misc
Corrective Action Required
09/07/2018
*SEPT-7 REINSPECTION FEE ASSESSED *MAY-2 NOT-READY FEE ASSESSED. EROSION CONTROL NOT INSTALLED. I MADE A CALL SEVERAL DAYS AGO ABOUT THE LACK OF EROSION CONTROL. EROSION CONTROL SHALL BE INSTALLED PER CITY REQUIREMENT; AND THE STREET&SIDEWALK SHALL BE CLEANED FROM SILT
Occupancy Inspection - Codes Residential Failed 5/9/2019 5/9/2019 at 9:45 AM 05/09/2019
Misc
Corrective Action Required
05/02/2019
-Obtain lawn irrigation permit and submit backflow valve test report to city -Install sewer tracer wire box -Final grade, sod, splash blocks -Seal exterior: penetrations, light, etc -Garage door not self closing -Screw the rear exterior door embedded brace into studs -Install water hammer arrestor for dish washer -Install bedroom window crank -Cannot dump waste into clean out -Secure water heater LFNC raceway per code
Underslab Plumbing Inspection - Residential Passed 5/10/2019 5/10/2019 05/10/2019
Erosion Control Inspection Residential Passed 5/10/2019 05/10/2019
DCM5 ESC INSP DENIED
Resolved
05/09/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Occupancy Inspection - Codes Residential Temporary C of O 5/10/2019 5/10/2019 at 1:05 PM 05/10/2019
Misc
Corrective Action Required
05/09/2019
**MAINTAIN EROSION CONTROL UNTIL SODDING AND KEEP STREET CLEAN -Install sewer tracer wire box -Final grade, sod, splash blocks -Seal exterior: penetrations, light, etc
Occupancy Inspection - Codes Residential Failed 6/10/2019 at 10:30 AM 06/10/2019
Misc
Corrective Action Required
05/10/2019
-Install sewer tracer wire box -Install 3 ft splash blocks or downspout & sump pump extensions
Occupancy Inspection - Codes Residential Failed 6/24/2019 6/24/2019 at 8:35 AM 06/24/2019
Misc
Corrective Action Required
06/10/2019
-Install sewer tracer wire box -Install 3 ft splash blocks or downspout & sump pump extensions
Occupancy Inspection - Codes Residential Full C of O 7/29/2019 at 8:05 AM 07/29/2019
Misc
Resolved
07/29/2019
-Install sewer tracer wire box -Install 3 ft splash blocks or downspout & sump pump extensions
Documents & Images
Date Uploaded File Type Document Name
04/18/2018 Letter Codes Residential Plan Review
05/22/2018 Receipt Receipt for transaction: 2018-002914
05/22/2018 Letter Codes Building Permit
05/22/2018 Letter Inspection Summary
05/22/2018 Plot Plan DOC052218-005
06/18/2018 Letter Inspection Summary
07/10/2018 Letter Inspection Summary
07/24/2018 Letter Inspection Summary
07/24/2018 Letter Inspection Summary
07/27/2018 Letter Inspection Summary
08/16/2018 Letter Inspection Summary
08/20/2018 Letter DE-Daily Inspection Summary
08/20/2018 Letter DE-Daily Inspection Summary
08/24/2018 Letter Inspection Summary
08/28/2018 Letter DE-Daily Inspection Summary
08/28/2018 Letter DE-Daily Inspection Summary
08/30/2018 Letter Inspection Summary
09/05/2018 Letter Inspection Summary
09/07/2018 Letter Re-Inspection Fee
09/07/2018 Letter Inspection Summary
09/11/2018 Letter Inspection Summary
05/02/2019 Letter INSPECTION SUMMARY
05/02/2019 Letter INSPECTION SUMMARY
05/08/2019 Receipt Receipt for transaction: 2019-001828
05/09/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter Codes Temporary Certificate of Occupancy
05/10/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
06/24/2019 Letter INSPECTION SUMMARY
07/29/2019 Letter Field Certificate of Occupancy
07/29/2019 Letter Field Certificate of Occupancy
07/30/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home