Permit Application Status

PRRES20180476


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20180476
Building Permit - Residential
Certificate of Occupancy
BRIAN CHANEY CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE FINISHED AND UNFINISHED BASEMENT COVERED DECK
03/02/2018
03/09/2018
03/22/2019
Locations
Contacts
BRIAN CHANEY CONSTRUCTION LLC, Address:2254 MILAM RD  
BRIAN CHANEY CONSTRUCTION, LLC, Address:PO BOX 646, Phone:(816) 838-0821  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
O'CONNELL ELECTRIC LLC, Address:11017 S ALLEY JACKSON RD, Phone:(816) 547-4706  
LRW PLUMBING LLC, Address:20631 W 319TH ST, Phone:(913) 568-7737  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 03/06/2018 03/08/2018
Brandon Kalwei
Plot Plan Review Approved 03/06/2018 03/02/2018
Troy Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $958.79 $958.79 Paid 03/09/2018
Right of Way Permit Fee $75.00 $75.00 Paid 03/09/2018
8331507-Sewer Connection Fee $450.00 $450.00 Paid 03/09/2018
Water Tap Fee $3,343.00 $3,343.00 Paid 03/09/2018
Water Meter Fee $431.83 $431.83 Paid 03/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/15/2018 at 2:40 PM 03/15/2018
Underslab Plumbing Inspection - Residential Passed 4/19/2018 4/19/2018 at 9:35 AM 04/19/2018
Sewer Service Inspection - R Partial 4/24/2018 4/24/2018 at 1:55 PM 04/24/2018
Misc
Partial Correction
04/24/2018
-PARTIAL FROM THE SEWER CONNECTION TO THE STUB BELOW STREET CURB TO ~40 FT TOWARD HOUSE. OK TO BACKFILL THIS SECTION
Water Service Inspection - R Not Ready 4/24/2018 4/24/2018 04/24/2018
Sewer Service Inspection - R Passed 4/25/2018 at 1:30 PM 04/25/2018
Misc
Resolved
04/25/2018
-PARTIAL FROM THE SEWER CONNECTION TO THE STUB BELOW STREET CURB TO ~40 FT TOWARD HOUSE. OK TO BACKFILL THIS SECTION
Water Service Inspection - R Passed 4/25/2018 04/25/2018
Erosion Control Inspection Residential Failed 5/3/2018 05/03/2018
DCM5 ESC INSP DENIED
Corrective Action Required
05/03/2018
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET.
Piers/Caissons Inspection - Residential Failed 5/3/2018 5/3/2018 at 8:20 AM 05/03/2018
Misc
Corrective Action Required
05/03/2018
INSPECTION DENIED DUE TO LACK OF EROSION CONTROL ALONG THE STREET
Piers/Caissons Inspection - Residential Failed 5/9/2018 at 8:46 AM 05/09/2018
Misc
Corrective Action Required
05/09/2018
MIDDLE HOLE IS FILLED WITH WATER. THE OUTER HOLES HAVE DEBRIS IN THEM
Piers/Caissons Inspection - Residential Passed 5/14/2018 at 10:30 AM 05/14/2018
Misc
Resolved
05/14/2018
MIDDLE HOLE IS FILLED WITH WATER. THE OUTER HOLES HAVE DEBRIS IN THEM
Erosion Control Inspection Residential Failed 6/26/2018 06/26/2018
DCM5 ESC INSP DENIED
Corrective Action Required
05/03/2018
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. INSTALL GRAVEL AT LOT ENTRANCE
All Rough Inspection - Residential Failed 6/26/2018 6/26/2018 at 10:50 AM 06/26/2018
Misc
Corrective Action Required
06/26/2018
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. INSTALL GRAVEL AT LOT ENTRANCE
All Rough Inspection - Residential Failed 6/28/2018 6/28/2018 at 9:25 AM 06/28/2018
Misc
Corrective Action Required
06/26/2018
FRAMING: -Nail garage portal wall sheathing to double studs and studs per code -Brace end of lvl beam above garage -Close roof deck opening -Nail corner stud at rear dining -Nail ceiling double joist hangers above rear dining -Install 14” lvl beam above rear dining per plan -Wall along master bedroom/laundry and foyer/great room is not bearing wall for roof load. See plan -Install double lvl beam below the above wall per plan -Attic access -Fb foyer wall from roof; Fb space at shower from roof; Fb dead space at mud -Non continuous studs at front bed gable wall -Support all hip and valley rafters over-notched roof lvl to front bed bearing wall -Block master bed door to corner -Brace lvl beam above stair from rotation -Toe nail joists to sill plate and top plates Fb basement wall from ceiling furdown space -Support underneath point load of lvl above kitchen (inside return air space). I want to see the blocking to I beam -Complete ceiling furdown at rear bedroom PLUMBING: -Install stud shoe for over bored stud at laundry and basement bath -Protect plumbing at master shower -Install master bath tub -Support gas csst line every 4 ft minimum MECHANICAL: -After master tub is installed, pan off return air space from tub space -Provide combustion air openings sized per code ELECTRICAL: -Install rear flood light -Shall replace damaged cable below switch at front basement bedroom **OK TO INSULATE
Erosion Control Inspection Residential Passed 6/28/2018 06/28/2018
DCM5 ESC INSP DENIED
Resolved
06/28/2018
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. INSTALL GRAVEL AT LOT ENTRANCE
Electrical Service Inspection Failed 6/28/2018 6/28/2018 06/28/2018
Misc
Corrective Action Required
06/28/2018
-Ground service to both ufer and water
Gas Service Inspection - Residential Failed 6/28/2018 6/28/2018 06/28/2018
Misc
Corrective Action Required
06/28/2018
-There's no pressure. Shall install pressure gauge with range no more than 30 psi
All Rough Inspection - Residential Passed 7/9/2018 7/9/2018 at 9:45 AM 07/09/2018
Misc
Corrective Action Required
06/28/2018
FRAMING: -Nail garage portal wall sheathing to double studs and studs per code -Brace end of lvl beam above garage -Close roof deck opening -Nail corner stud at rear dining -Nail ceiling double joist hangers above rear dining -Install 14” lvl beam above rear dining per plan -Wall along master bedroom/laundry and foyer/great room is not bearing wall for roof load. See plan -Install double lvl beam below the above wall per plan -Attic access -Fb foyer wall from roof; Fb space at shower from roof; Fb dead space at mud -Non continuous studs at front bed gable wall -Support all hip and valley rafters over-notched roof lvl to front bed bearing wall -Block master bed door to corner -Brace lvl beam above stair from rotation -Toe nail joists to sill plate and top plates Fb basement wall from ceiling furdown space -Support underneath point load of lvl above kitchen (inside return air space). I want to see the blocking to I beam -Complete ceiling furdown at rear bedroom PLUMBING: -Install stud shoe for over bored stud at laundry and basement bath -Protect plumbing at master shower -Install master bath tub -Support gas csst line every 4 ft minimum MECHANICAL: -After master tub is installed, pan off return air space from tub space -Provide combustion air openings sized per code ELECTRICAL: -Install rear flood light -Shall replace damaged cable below switch at front basement bedroom **OK TO INSULATE
Driveway Inspection Partial 8/6/2018 at 10:00 AM 08/16/2018
Informational
08/16/2018
The pre-pour appeared to be in good order. There was 4" of compacted rock and appeared to room for 6" of concrete.Steve Robbins 08/16/2018 7:24 AM
Sidewalk Inspection Partial 8/6/2018 at 10:30 AM 08/16/2018
PW-Misc
Informational
08/16/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
Driveway Inspection Passed 8/16/2018 at 4:15 PM 08/16/2018
Informational
08/16/2018
Ronald Paynter 08/16/2018 8:01 AM Driveway approach meets spec
Sidewalk Inspection Failed 8/15/2018 at 3:30 PM 08/16/2018
PW-Misc
Informational
08/16/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
08/16/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
Sidewalk Inspection Partial 8/20/2018 at 11:00 AM 08/20/2018
PW-Misc
Informational
08/16/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
08/16/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
PW-Misc
Informational
08/20/2018
Joe Starlin 08/20/2018 1:25 PM Corrections to ADA ramp have been made.
Sidewalk Inspection Failed 9/5/2018 9/5/2018 at 2:30 PM 09/05/2018
PW-Misc
Informational
08/20/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
08/20/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
PW-Misc
Informational
08/20/2018
Joe Starlin 08/20/2018 1:25 PM Corrections to ADA ramp have been made.
PW-Misc
Corrective Action Required
09/05/2018
Ronald Paynter 09/05/2018 3:49 PM forms and slope meet specs, aggregate NEEDS to be compacted
Sidewalk Inspection Failed 9/11/2018 9/11/2018 at 2:00 PM 09/11/2018
PW-Misc
Informational
09/05/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
09/05/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
PW-Misc
Informational
09/05/2018
Joe Starlin 08/20/2018 1:25 PM Corrections to ADA ramp have been made.
PW-Misc
Corrective Action Required
09/05/2018
Ronald Paynter 09/05/2018 3:49 PM forms and slope meet specs, aggregate NEEDS to be compacted
PW-Misc
Corrective Action Required
09/11/2018
Ronald Paynter 09/11/2018 2:53 PM Needs more aggregate in marked section, needs silt fence removed from walk and re compact aggregate
Sidewalk Inspection Partial 9/12/2018 9/12/2018 at 2:00 PM 09/12/2018
PW-Misc
Informational
09/11/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
09/11/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
PW-Misc
Informational
09/11/2018
Joe Starlin 08/20/2018 1:25 PM Corrections to ADA ramp have been made.
PW-Misc
Corrective Action Required
09/11/2018
Ronald Paynter 09/05/2018 3:49 PM forms and slope meet specs, aggregate NEEDS to be compacted
PW-Misc
Corrective Action Required
09/11/2018
Ronald Paynter 09/11/2018 2:48 PM Needs more aggregate, portion of silt fence removed from walk area, and re compacted
PW-Misc
Informational
09/12/2018
Ronald Paynter 09/12/2018 3:46 PM Previous corrections have been made, forms and slope still meet spec
Gas Service Inspection - Residential Passed 9/26/2018 9/26/2018 at 8:45 AM 09/26/2018
Misc
Resolved
09/26/2018
-There's no pressure. Shall install pressure gauge with range no more than 30 psi
Electrical Service Inspection Failed 9/28/2018 9/28/2018 at 10:50 AM 09/28/2018
Misc
Corrective Action Required
06/28/2018
-Ground service to ufer
Sidewalk Inspection Passed 9/28/2018 at 2:00 PM 09/28/2018
PW-Misc
Informational
09/12/2018
The sidewalk was formed and the ADA was formed up. Bob Burns and Matt Munger came out to assist with this inspection. This passed pre-inspection and is ready to pour.Steve Robbins 08/16/2018 7:33 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
09/12/2018
Ronald Paynter 08/16/2018 1545 PM The ADA Ramp does not meet ADA guidelines.
PW-Misc
Informational
09/12/2018
Joe Starlin 08/20/2018 1:25 PM Corrections to ADA ramp have been made.
PW-Misc
Corrective Action Required
09/12/2018
Ronald Paynter 09/05/2018 3:49 PM forms and slope meet specs, aggregate NEEDS to be compacted
PW-Misc
Corrective Action Required
09/12/2018
Ronald Paynter 09/11/2018 2:48 PM Needs more aggregate, portion of silt fence removed from walk area, and re compacted
PW-Misc
Informational
09/12/2018
Ronald Paynter 09/12/2018 3:46 PM Previous corrections have been made, forms and slope still meet spec
Informational
09/28/2018
Ronald Paynter 09/28/2018 3:46 PM Sidewalk meets ADA specs
Electrical Service Inspection Passed 10/2/2018 10/2/2018 at 9:25 AM 10/02/2018
Misc
Resolved
10/02/2018
-Ground service to ufer
Occupancy Inspection - Codes Residential Failed 10/31/2018 at 12:45 PM 10/31/2018
Misc
Corrective Action Required
10/31/2018
-FINAL GRADE, SOD, SPLASHBLOCKS -COMPLETE DECK -SEWER TRACE BOX AND WIRE SHALL BE ACCESSIBLE AT GRADE LEVEL -LOWER WATER METER SO THAT THE METER TOP-LID DISTANCE IS 14"-18" -DO NOT BURY DECK CEDAR POSTS -SEAL EXTERIOR: ABOVE AC DISCONNECT, AT GAS PIPING PENETRATION -INSTALL ADDRESS NEAR LIGHT SOURCE -INSTALL LIGHT AT FRONT ENTRY -ALL EXTERIOR DOORS-SCREW IN THE EMBEDDED METAL BRACE TO STUDS -INSTALL BOX EXTENSION FOR THE FIREPLACE TV OUTLET -INSTALL ANTI-HAMMERING ARRESTORS FOR DISH WASHER AND CLOTHES WASHER WATER SUPPLY -GARAGE DOOR NOT SELF-CLOSING -INSTALL HANDRAIL FOR THE GARAGE STAIR -SECURE THE WATER SERVICE LINE -INSTALL ANTI-BACKFLOW DEVICE FOR THE HOSE BIBB -REMOVE THE UNDER-STAIR INSULATION PAPER FACING -REMOVE ALL FOUNDATION WALL TIES -THE STOOP SUSPENDED SLAB WAS NOT INSPECTED BY CITY. HAVE ENGINEER INSPECT&OK -LOCATE THE UFER GROUNDING CONNECTION -SUPPORT AND SECURE THE EXPANSION TANK. INSTALL THE COPPER WATER PIPE FOR RIGID SUPPORT OF THE TANK -INSTALL THE P/T DISCHARGE PIPE TO WITHIN 6" OF FLOOR -BOND THE GAS PIPING
Occupancy Inspection - Codes Residential Failed 10/31/2018 10/31/2018
Misc
Corrective Action Required
10/31/2018
-FINAL GRADE, SOD, SPLASHBLOCKS -COMPLETE DECK -SEWER TRACE BOX AND WIRE SHALL BE ACCESSIBLE AT GRADE LEVEL -LOWER WATER METER SO THAT THE METER TOP-LID DISTANCE IS 14"-18" -DO NOT BURY DECK CEDAR POSTS -SEAL EXTERIOR: ABOVE AC DISCONNECT, AT GAS PIPING PENETRATION -INSTALL ADDRESS NEAR LIGHT SOURCE -INSTALL LIGHT AT FRONT ENTRY -ALL EXTERIOR DOORS-SCREW IN THE EMBEDDED METAL BRACE TO STUDS -INSTALL BOX EXTENSION FOR THE FIREPLACE TV OUTLET -INSTALL ANTI-HAMMERING ARRESTORS FOR DISH WASHER AND CLOTHES WASHER WATER SUPPLY -GARAGE DOOR NOT SELF-CLOSING -INSTALL HANDRAIL FOR THE GARAGE STAIR -SECURE THE WATER SERVICE LINE -INSTALL ANTI-BACKFLOW DEVICE FOR THE HOSE BIBB -REMOVE THE UNDER-STAIR INSULATION PAPER FACING -REMOVE ALL FOUNDATION WALL TIES -THE STOOP SUSPENDED SLAB WAS NOT INSPECTED BY CITY. HAVE ENGINEER INSPECT&OK -LOCATE THE UFER GROUNDING CONNECTION -SUPPORT AND SECURE THE EXPANSION TANK. INSTALL THE COPPER WATER PIPE FOR RIGID SUPPORT OF THE TANK -INSTALL THE P/T DISCHARGE PIPE TO WITHIN 6" OF FLOOR -BOND THE GAS PIPING
Occupancy Inspection - Codes Residential Failed 11/7/2018 11/7/2018 11/07/2018
Misc
Corrective Action Required
10/31/2018
-FINAL GRADE, SOD, SPLASHBLOCKS -COMPLETE DECK -SEWER TRACE BOX AND WIRE SHALL BE ACCESSIBLE AT GRADE LEVEL -LOWER WATER METER SO THAT THE METER TOP-LID DISTANCE IS 14"-18" DO NOT BURY DECK CEDAR POSTS
Occupancy Inspection - Codes Residential Temporary C of O 11/9/2018 11/9/2018 at 2:30 PM 11/09/2018
Misc
Corrective Action Required
11/07/2018
-FINAL GRADE, SOD, SPLASHBLOCKS -COMPLETE DECK -SEWER TRACE BOX AND WIRE SHALL BE ACCESSIBLE AT GRADE LEVEL -LOWER WATER METER SO THAT THE METER TOP-LID DISTANCE IS 14"-18" DO NOT BURY DECK CEDAR POSTS
Occupancy Inspection - Codes Residential Temporary C of O 11/27/2018 11/27/2018 at 9:15 AM 11/27/2018
Misc
Corrective Action Required
11/07/2018
-COMPLETE DECK . INSTALL HANDRAIL NO WIDER THAN 3.5" -SEWER TRACE BOX AND WIRE SHALL BE ACCESSIBLE AT GRADE LEVEL -THE METER TOP MUST FLUSH WITH FINAL GRADE. MAINTAIN METER-LID DISTANCE OF 14"-18" -DO NOT BURY DECK CEDAR POSTS (SOUTH POSTS)
Occupancy Inspection - Codes Residential Temporary C of O 12/20/2018 12/20/2018 at 9:20 AM 12/20/2018
Misc
Corrective Action Required
11/27/2018
-INSTALL DECK HANDRAIL NO WIDER THAN 3.5" **HANDRAIL MUST BE GRASPABLE. YOU CAN INSTALL A 2X2 LUMBER AS HANDRAIL. RETURN BOTH ENDS OF THE HANDRAIL TO NEWEL POST. -THE METER TOP MUST FLUSH WITH FINAL GRADE. MAINTAIN METER-LID DISTANCE OF 14"-18" **PLEASE GRADE UP TO LID LEVEL.
Occupancy Inspection - Codes Residential Full C of O 3/22/2019 3/22/2019 at 8:10 AM 03/22/2019
Misc
Resolved
03/22/2019
-THE METER TOP MUST FLUSH WITH FINAL GRADE. MAINTAIN METER-LID DISTANCE OF 14"-18" **PLEASE GRADE UP TO LID LEVEL.
Documents & Images
Date Uploaded File Type Document Name
03/02/2018 Letter Codes Residential Plan Review
03/09/2018 Receipt Receipt for transaction: 2018-000871
03/09/2018 Letter Codes Building Permit
03/09/2018 Plot Plan DOC030918-009
03/15/2018 Letter Inspection Summary
04/19/2018 Letter Inspection Summary
04/24/2018 Letter Inspection Summary
04/25/2018 Letter Inspection Summary
05/03/2018 Letter Inspection Summary
05/09/2018 Letter Inspection Summary
05/14/2018 Letter Inspection Summary
06/26/2018 Letter Inspection Summary
06/28/2018 Letter Inspection Summary
07/09/2018 Letter Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/20/2018 Letter DE-Daily Inspection Summary
09/05/2018 Letter DE-Daily Inspection Summary
09/11/2018 Letter DE-Daily Inspection Summary
09/12/2018 Letter DE-Daily Inspection Summary
09/26/2018 Letter Inspection Summary
09/28/2018 Letter Inspection Summary
09/28/2018 Letter DE-Daily Inspection Summary
10/02/2018 Letter Inspection Summary
10/31/2018 Letter Inspection Summary
11/09/2018 Letter Codes Temporary Certificate of Occupancy
11/27/2018 Letter Codes Temporary Certificate of Occupancy
03/22/2019 Letter Field Certificate of Occupancy
04/02/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home