Permit Application Status

PRPWFR20141829


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRPWFR20141829
Public Works Infrastructure Permit - Residential
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
Residences at New Longview
07/03/2014
07/10/2014
07/18/2022
Locations
Contacts
RESIDENCES AT NEW LONGVIEW LLC, Address:5015 NW CANAL ST  
Not shown for privacy reasons.
Not shown for privacy reasons.
CITY OF LEES SUMMIT, Address:220 S MAIN  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $6,582.60 $6,582.60 Paid 07/03/2014
$6,582.60
91100C9-Water Insp Fee $7,992.90 $7,992.90 Paid 07/03/2014
$7,992.90
9110072-Water Test Fee $400.00 $400.00 Paid 07/03/2014
$400.00
9110068-Storm Fee $20,577.75 $20,577.75 Paid 07/03/2014
$20,577.75
9110081-Paved Surface Inspection Fee $21,635.55 $21,635.55 Paid 07/03/2014
$21,635.55
9110071-Site Grading Fee $1,050.00 $1,050.00 Paid 07/03/2014
$1,050.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Passed 7/17/2014 at 12:00 AM 07/18/2014
PW-Misc
Corrective Action Required
07/18/2014
I arrived on site today and found the contractord laid on e sewer stub out of mh A5 to building 2. I told him to stop. I called Mark H and he said if i looked at this one okay to backfill but no more.
Water Line - Coliform Test 1 Passed 10/09/2014
Water Line - Coliform Test 2 Passed 10/09/2014
Proof roll parking lot Passed 10/30/2014
Grading/Excavation/Fill Inspection Passed 11/10/2014
Storm - Rip Rap Passed 11/10/2014
Sanitary Sewer Construction Inspection Passed 7/22/2014 at 12:00 AM 11/10/2014
Storm - Inlets Clean Passed 11/10/2014
Storm - Pipe Passed 11/10/2014
Storm - Outlet Structure Passed 11/10/2014
Water Line - Construction Inspection Passed 11/11/2014
PW-Misc
Corrective Action Required
10/01/2014
PW-Misc
Corrective Action Required
10/01/2014
filled water line
Sanitary Sewer - Air Test Passed 12/2/2014 at 12:00 AM 01/20/2015
ESC - (Vegetation/Ground Cover) Passed 02/06/2015
Site Visit Complete 02/06/2015
Fire Line - Flush Passed 6/10/2015 at 8:30 AM 02/06/2015
ESC Devices Installed Complete 02/06/2015
Storm Sewer Construction Inspection Passed 02/06/2015
Erosion Control Inspection Passed 1/26/2015 at 12:00 AM 02/06/2015
Site Visit Complete 7/25/2014 at 12:00 AM 02/06/2015
PW-Misc
Corrective Action Required
07/28/2014
A water truck is needed to keep dirt and dust from leaving your site. All attempts should be made to keep this from happening.
Erosion Control Inspection Passed 02/06/2015
Sanitary Sewer Construction Inspection Passed 7/11/2014 at 7:45 AM 02/06/2015
PW-Main inspection
Corrective Action Required
07/14/2014
Tied into manhole and laid two sticks out of manhole.
Pavement-Proof Roll Passed 04/06/2016
Fire Line - Flush Passed 8/20/2014 at 12:00 AM 04/06/2016
Corrective Action Required
10/09/2014
Flushed water line for 10 minutes using a 4" fire hose.
Site Visit Complete 04/06/2016
Corrective Action Required
09/26/2014
road around site looks clean, south and west drive approaches done and look good.
Site Visit Complete 9/25/2014 at 12:00 AM 04/06/2016
PW-Misc
Corrective Action Required
09/26/2014
A water truck is needed to keep dirt and dust from leaving your site. All attempts should be made to keep this from happening.
PW-Misc
Corrective Action Required
09/26/2014
Went and looked at domestic water meter vault. 3" water line, told the contractor i would psi test the line and pull bac t samples. But mark would continue to look at construction of the line.
PW-Misc
Corrective Action Required
09/26/2014
Spoke with contractor about testing and water shut down. Went over about the next two weeks plans.
PW-Misc
Corrective Action Required
09/26/2014
Shawn calle dasked about city sidewalk, told wa610 1-4 mix
Erosion Control Inspection Passed 8/26/2014 at 12:00 AM 04/06/2016
PW-Erosion and Sediment Control
Corrective Action Required
08/26/2014
I would suggest having your water truck go out a few more times during the day on the haul roads. Other than that looks pretty good.
Erosion Control Inspection Passed 9/9/2014 at 12:00 AM 04/06/2016
PW-Erosion and Sediment Control
Resolved
01/20/2015
I would suggest having your water truck go out a few more times during the day on the haul roads. Other than that looks pretty good.
Corrective Action Required
01/20/2015
Streets have looked good, still cleaning daily. Interior basin looks good.
Storm Sewer Construction Inspection Passed 8/21/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
08/28/2014
A main inspection has uncovered the following problems.a6-box c1 a12-20' roof drain north a5east 60' roof drain a5 west 60 roof drain e1 west 25 e2 west 25'
Storm Sewer Construction Inspection Passed 04/06/2016
PW-Main inspection
Corrective Action Required
08/28/2014
A main inspection has uncovered the following problems.a6-box c1 a12-20' roof drain north a5east 60' roof drain a5 west 60 roof drain e1 west 25 e2 west 25'
Corrective Action Required
11/11/2014
Laying last line west side of site
Storm Sewer Construction Inspection Passed 8/14/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
08/14/2014
Continuing laying main line.
PW-Main inspection
Corrective Action Required
08/19/2014
Laying storm line, everything looks good
Storm Sewer Construction Inspection Passed 8/14/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
08/14/2014
Continuing laying main line.
Storm Sewer Construction Inspection Passed 8/13/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
08/14/2014
Continuing laying main line.
Storm Sewer Construction Inspection Passed 8/7/2014 at 12:00 AM 04/06/2016
Corrective Action Required
08/08/2014
laid storm pipe to a2 and out of a2
Storm Sewer Construction Inspection Passed 8/6/2014 at 12:00 AM 04/06/2016
Storm Sewer Construction Inspection Passed 8/5/2014 at 12:00 AM 04/06/2016
Storm Sewer Construction Inspection Passed 8/5/2014 at 12:00 AM 04/06/2016
Corrective Action Required
08/05/2014
laying storm poured collars
Site Visit Complete 9/25/2014 at 12:00 AM 04/06/2016
PW-Misc
Corrective Action Required
07/28/2014
A water truck is needed to keep dirt and dust from leaving your site. All attempts should be made to keep this from happening.
PW-Misc
Corrective Action Required
09/08/2014
Went and looked at domestic water meter vault. 3" water line, told the contractor i would psi test the line and pull bac t samples. But mark would continue to look at construction of the line.
PW-Misc
Corrective Action Required
09/26/2014
Spoke with contractor about testing and water shut down. Went over about the next two weeks plans.
Storm Sewer Construction Inspection Passed 7/31/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Carried Forward
08/04/2014
Started strom construction. Set box over existing pipe.
PW-Main inspection
Carried Forward
08/04/2014
contiuning laying storm on a line. Streets look clean water truck on site, with rain yesterday no dust problem
Sanitary Sewer Construction Inspection Passed 7/21/2014 at 3:00 PM 04/06/2016
Sanitary Sewer Construction Inspection Passed 7/16/2014 at 10:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
07/15/2014
Tied into manhole and laid two sticks out of manhole.
PW-Main inspection
Corrective Action Required
07/15/2014
Laid from MH A3 to A4
PW-Main inspection
Corrective Action Required
07/15/2014
MH A4 to MH a5
PW-Main inspection
Corrective Action Required
07/16/2014
MH a5 to mh a6
Sanitary Sewer Construction Inspection Passed 7/14/2014 at 10:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
07/14/2014
Tied into manhole and laid two sticks out of manhole.
PW-Main inspection
Corrective Action Required
07/15/2014
Laid from MH A3 to A4
Sanitary Sewer Construction Inspection Passed 7/15/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
07/15/2014
Tied into manhole and laid two sticks out of manhole.
PW-Main inspection
Corrective Action Required
07/15/2014
Laid from MH A3 to A4
PW-Main inspection
Corrective Action Required
07/15/2014
MH A4 to MH a5
Pavement-Proof Roll Passed 7/20/2015 at 1:00 PM 04/06/2016
Storm Sewer Construction Inspection Passed 7/31/2014 at 12:00 AM 04/06/2016
PW-Main inspection
Corrective Action Required
07/31/2014
Started strom construction. Set box over existing pipe.
Water Line - Construction Inspection Passed 9/30/2014 at 12:00 AM 04/06/2016
PW-Misc
Corrective Action Required
09/09/2014
PW-Misc
Corrective Action Required
10/01/2014
filled water line
Sanitary Sewer - Invert Passed 1/3/2017 01/03/2017
PW-Misc
Corrective Action Required
01/03/2017
All inverts poured and clean of debris
ESC Devices Installed Complete 1/25/2017 01/25/2017
PW-Erosion and Sediment Control
Corrective Action Required
01/25/2017
Please review your ESC
ESC Devices Installed Complete 1/25/2017 01/25/2017
PW-Erosion and Sediment Control
Corrective Action Required
01/25/2017
Your project is in violation of the Erosion and Sediment control policy.
Detention Basin Partial 08/11/2020
Miscellaneous Correction
Corrective Action Required
08/11/2020
See email in documents covering on-site discussions.
Documents & Images
Date Uploaded File Type Document Name
07/10/2014 Letter PW-Permit
07/14/2014 Letter PW-Daily Inspection Summary
07/15/2014 Letter PW-Daily Inspection Summary
07/15/2014 Letter PW-Daily Inspection Summary
07/18/2014 Letter PW-Daily Inspection Summary
07/25/2014 Plans FDP
07/25/2014 Plans Plans
07/28/2014 Letter PW-Daily Inspection Summary
07/31/2014 Letter PW-Daily Inspection Summary
08/04/2014 Letter PW-Daily Inspection Summary
08/05/2014 Letter PW-Daily Inspection Summary
08/07/2014 Letter PW-Daily Inspection Summary
08/07/2014 Letter PW-Daily Inspection Summary
08/08/2014 Letter PW-Daily Inspection Summary
08/19/2014 Letter PW-Daily Inspection Summary
08/26/2014 Letter PW-Daily Inspection Summary
08/28/2014 Letter PW-Daily Inspection Summary
09/08/2014 Letter PW-Daily Inspection Summary
09/26/2014 Letter PW-Daily Inspection Summary
09/26/2014 Letter PW-Site Visit
09/26/2014 Letter PW-Daily Inspection Summary
10/01/2014 Letter PW-Daily Inspection Summary
10/09/2014 Letter PW-Daily Inspection Summary
10/09/2014 Letter PW-Daily Inspection Summary
01/20/2015 Letter PW-Daily Inspection Summary
01/20/2015 Letter PW-Daily Inspection Summary
07/22/2015 Letter PW-Daily Inspection Summary
04/08/2016 Letter PW-Punch List
04/12/2016 Letter PW-Punch List
05/10/2016 Letter PW-Final Acceptance Commercial
05/24/2016 Letter PW-Punch List
05/24/2016 Letter PW-Punch List
05/24/2016 punch list
06/13/2016 RE Residences at New Longview Update
07/19/2016 Letter PW-Certificate of Substantial Completion Multiple Lot
01/03/2017 Letter PW-Daily Inspection Summary
08/11/2020 Email RE Residences of NLV - Projected Work Schedule
09/03/2020 Photograph Basin #1 dry
09/03/2020 Photograph Basin #2 dry
09/03/2020 Photograph Basin #3 dry
09/03/2020 Photograph Basin #15 dry
09/03/2020 Photograph Basin #16 dry
09/03/2020 Photograph 20200831_093956
09/03/2020 Photograph 20200831_093919
09/03/2020 Photograph 20200831_093932
09/03/2020 Photograph 20200831_094411
09/03/2020 Photograph 20200831_094233
09/03/2020 Photograph 20200831_094318
09/03/2020 Photograph 20200831_094236
09/03/2020 Photograph 20200831_094324
09/03/2020 Photograph 20200831_093930
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home