Permit Application Status

PRCOM20254503


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20254503
Building Permit - Commercial
In Plan Review
NEW COMMERCIAL
FIVE FOUR - NEW RESTAURANT WITH SITE PLAN INCLUDING PICKLE BALL COURTS, BAG TOSS AREA, AND PARKING
10/17/2025
04/29/2026
Locations
Contacts
  
  
  
  
  
Shaw Hofstra & Associates, Address:ATTN: Lois Walkenhorst, Phone:( ) -   
Reviews
Review Type Outcome Est. Completion Date Completed
Health Department Review Approved 11/04/2025
Joe Frogge
Fire Plan Review Approved 10/31/2025 10/31/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
10/31/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
10/31/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 10/31/2025 10/30/2025
Joe Frogge
Final Development Plan
Corrective Action Required
10/30/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Health Dept Review
Resolved
11/04/2025

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
10/30/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
10/30/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $41,274.75
Miscellaneous Correction
Corrective Action Required
10/30/2025

2018 IBC 1505.1 General. Roof assemblies shall be divided into the classes defined in this section. Class A, B and C roof assemblies and roof coverings required to be listed by this section shall be tested in accordance with ASTM E108 or UL 790. In addition, fire-retardant-treated wood roof coverings shall be tested in accordance with ASTM D2898. The minimum roof coverings installed on buildings shall comply with Table 1505.1 based on the type of construction of the building. Exception: Skylights and sloped glazing that comply with Chapter 24 or Section 2610. Action required: Provide verification that sail shades are minimum Class C per Table 1501.1. Footnotes a, b, & c have been omitted per Code of Ordinances Sec. 7-224.
IBC 1803.1 General - geotech
Corrective Action Required
10/30/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Coordinate structural designs with structural calculations provided by Bob D. Campbell & Co which specifies 1,500 psf soils. Sheet A011 and sheet S1 reference design load of 2,000.
IMC 506.3.13.3 Grease fan termination location
Corrective Action Required
10/30/2025

2018 IMC 506.3.13.3 Termination location. Exhaust outlets shall be located not less than 10 feet horizontally from parts of the same or contiguous buildings, adjacent buildings and adjacent property lines and shall be located not less than 10 feet above the adjoining grade level. Exhaust outlets shall be located not less than 10 feet horizontally from or not less than 3 feet above air intake openings into any buildings. (see code for exception) Action required: Relocate grease hood exhaust fan such that it is 10' away from parapet.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
10/30/2025

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. The fire-resistance rating of penetrations and fire-resistant joint systems shall be determined in accordance Sections 714 and 715, respectively. 2018 IBC 703.7 Marking and identification. Where there is an accessible concealed floor, floor-ceiling or attic space, fire walls, fire barriers, fire partitions, smoke barriers and smoke partitions or any other wall required to have protected openings or penetrations shall be effectively and permanently identified with signs or stenciling in the concealed space. Such identification shall: 1. Be located within 15 feet of the end of each wall and at intervals not exceeding 30 feet measured horizontally along the wall or partition. 2. Include lettering not less than 3 inches in height with a minimum 3/8 inch stroke in a contrasting color incorporating the suggested working, “FIRE AND/OR SMOKE BARRIER – PROTECT ALL OPENINGS,” or other wording. Action required: Provide nail/screw patterns for rated walls and horizontal assembly.
Licensed Contractors Rejected 10/31/2025 10/30/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
10/30/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/30/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Pending 11/10/2025
Grant White
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
10/17/2025 Application Form APPLICATION
10/17/2025 Plans 1 FIVE FOUR Plans-Arch & Struct-Issue for Permit-Part 1
10/17/2025 Plans 2 FIVE FOUR Plans-MEP & Kitchen Equip-issue for Permit-Part 2
10/17/2025 Specifications 3 FIVE FOUR Architectural Specifications - Issue for Permit
10/17/2025 Engineer Report/Study 4 FIVE FOUR Structural Calculations - Issue for Permit
10/31/2025 Letter License Tax Bill
10/31/2025 Letter DS P/R Corrections Document
11/04/2025 3rd Party Permit/Approval Health Dept
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home