Permit Application Status

PRCOM20252521


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252521
Building Permit - Commercial
Issued
RAINIER SUMMIT WOODS ACQUISITIONS LLC
CHANGE OF TENANT
CARHARTT - Retail, merc250834antile, selling durable work gear and outdoor apparel
06/18/2025
07/29/2025
12/28/2025
Locations
Contacts
RAINIER SUMMIT WOODS ACQUISITIONS LLC, Address:13760 NOEL RD STE 1020  
Commercial Contractors, Inc., Address:16745 Comstock Street  
Paul Kilday - Commercial Contractors, Inc, Phone:(616) 403-9191  
SET POINT MECHANICAL LLC, Address:PO BOX 24011, Phone:(913) 213-9465  
P & L Electric LLC, Address:1109 SE 11th Street, Phone:(573) 220-9498  
Mayes Plumbing Inc, Address:501 South McCleary Road  
RGLA Solutions, Address:5100 River Road, Suite 125, Phone:(847) 671-7452  
Travis Male - Commercial Contractors, Inc., Phone:(616) 403-7158  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/29/2025 07/29/2025
Joe Frogge
LC - General Contractor
Resolved
07/29/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
07/29/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/29/2025 - Acknowledged in letter.
Building Plan Review Approved 07/29/2025 07/29/2025
Joe Frogge
IBC 505.3.3 - platform guards
Resolved
07/29/2025

2018 IBC 505.3.3 Guards. Equipment platforms shall have guards where required by Section 1013.2. Action required: Provide guards at equipment platform.
IBC 1606.2 Design dead load - structural
Resolved
07/29/2025

"2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Fire Plan Review Approved with Conditions 07/29/2025 07/22/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
07/22/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/22/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Fire Plan Review Approved with Conditions 07/01/2025 07/01/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
06/30/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
06/30/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 07/01/2025 06/30/2025
Joe Frogge
IBC 505.3.3 - platform guards
Corrective Action Required
06/30/2025

2018 IBC 505.3.3 Guards. Equipment platforms shall have guards where required by Section 1013.2. Action required: Provide guards at equipment platform.
IBC 1606.2 Design dead load - structural
Corrective Action Required
06/30/2025

"2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Licensed Contractors Rejected 07/01/2025 06/30/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
06/30/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
06/30/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $2,000.00 $2,000.00 Paid 07/29/2025
$20,361.00
Commercial Excise Tax Fee $10,180.50 $10,180.50 Paid 06/18/2025
$10,180.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Electrical Service Inspection Pending
Documents & Images
Date Uploaded File Type Document Name
06/18/2025 Application Form APPLICATION
06/18/2025 Letter License Tax Bill
06/23/2025 Plans 25303_ISSUED FOR BID PERMIT LANDLORDv2
07/01/2025 Letter DS P/R Corrections Document
07/22/2025 Plans 25_0722 PRCOM20252521_Rev 1
07/25/2025 Activity Document 25_0725 ISSUE FOR DEMO PERMIT
07/29/2025 Letter 25_0729 PRCOM20252521_Rev 1
07/29/2025 Plans 25303_REV1_PERMIT REVISIONS
07/29/2025 Approved Plans Approved construction plans
07/29/2025 Receipt Receipt for transaction:2025-005893
07/29/2025 Letter DS Building Permit
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home