PRCOM20243828
Building Permit - Commercial
Certificate of Occupancy
THE CITY OF LEES SUMMIT
ALTERATION OTHER COM
ADDITION TO COVER PARKING AREA AND ADDITION FOR COVERED STORAGE AREA FOR DIRT/ROCK
07/23/2024
09/18/2024
02/26/2025
Locations
Contacts
THE CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
MAR BUILDING SOLUTIONS, Address:1445 SE BROADWAY DR, Phone:(816) 272-5435  
Chad Anderson <chad@marbuildingsolutions.com>  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Zoning Review Approved 08/06/2024 08/06/2024
Shannon McGuire
Building Plan Review Approved 08/06/2024 08/02/2024
Joe Frogge
Fire Plan Review Approved 08/06/2024 07/24/2024
Joe Frogge
Licensed Contractors Approved 08/06/2024 07/24/2024
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Add/Alter Other $816.30 $816.30 Paid 09/10/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 10/1/2024 10/01/2024
Misc
Corrective Action Required
10/01/2024
Footing not ready for inspection
Footing Inspection - Commercial Partial 10/1/2024 10/01/2024
Misc
Corrective Action Required
10/01/2024
Four 14'x14' column pads-OK
Foundation Inspection - Commercial Failed 10/8/2024 10/8/2024 10/08/2024
Misc
Corrective Action Required
10/08/2024
- no contractor on sight - coulmn pads not formed up - no answer to phone # in notes
Foundation Inspection - Commercial Partial 10/10/2024 10/10/2024 10/10/2024
Misc
Resolved
10/10/2024
- no contractor on sight - coulmn pads not formed up - no answer to phone # in notes
Miscellaneous Correction
Informational
10/10/2024
Four foundation forms passed for south side of east building This is a partial pass only
Footing Inspection - Commercial Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Corrective Action Required
10/01/2024
Four 14'x14' column pads-OK **10/14-Footing and foundation wall already poured. Called the contractor and he said footing and foundation were already approved by other inspectors
Footing Inspection - Commercial Passed 2/7/2025 02/07/2025
Misc
Resolved
02/07/2025
Four 14'x14' column pads-OK **10/14-Footing and foundation wall already poured. Called the contractor and he said footing and foundation were already approved by other inspectors
Rough Electrical Inspection - Commercial Failed 2/7/2025 2/7/2025 02/07/2025
Misc
Corrective Action Required
02/07/2025
Expose all covered wiring for inspection -Remove covers, fixtures and devices, open electrical panels etc
Rough Electrical Inspection - Commercial Failed 2/12/2025 2/12/2025 02/12/2025
Misc
Corrective Action Required
02/07/2025
-Bond all metallic boxes at canopy -Install knockout covers at all openings in boxes *Column receptacles and panel approved
Rough Electrical Inspection - Commercial Passed 02/24/2025
Misc
Resolved
02/24/2025
-Bond all metallic boxes at canopy -Install knockout covers at all openings in boxes *Column receptacles and panel approved
Occupancy Inspection - Codes Commercial Full C of O 2/26/2025 02/26/2025
Occupancy Inspection - Planning Passed 2/26/2025 2/26/2025 02/26/2025
Documents & Images
Date Uploaded File Type Document Name
07/23/2024 Application Form APPLICATION
07/23/2024 Plans 01 SS Permit Butler Drawings
07/23/2024 Plans 02 SS Permit Butler Drawings
07/23/2024 Plans 240712_LSMO Water Utilities - Canopies_Overall Permit Set
07/23/2024 Engineer Report/Study 240712_LSMO Water Utilities - Canopies_Structural Calcs
07/23/2024 Engineer Report/Study Geotech Report
07/23/2024 Engineer Report/Study 24-007756-01 SS LOC (1)
07/23/2024 Engineer Report/Study 24-007756-02 SS LOC (1)
07/23/2024 Engineer Report/Study 24-007756-01 SS Calculations Package (1)
07/23/2024 Engineer Report/Study 24-007756-02 SS Calculations Package (1)
07/24/2024 Email FD Approval
08/06/2024 Approved Plans Approved architectural plans
08/06/2024 Plans 01 SS Permit Butler Drawings pdf
08/06/2024 Plans 02 SS Permit Butler Drawings pdf
08/07/2024 Approved Plans Approved PEMB plans
09/10/2024 Receipt Receipt for transaction:2024-007594
09/18/2024 Letter DS Building Permit
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
02/07/2025 Special Inspection Daily Report_2024-10-01_Multiple_1
02/07/2025 Special Inspection Daily Report_2024-10-08_Multiple_2
02/07/2025 Special Inspection Daily Report_2024-10-10_Reinforced Concrete_3
02/07/2025 Special Inspection Daily Report_2024-10-11_Pilasters_5
02/07/2025 Special Inspection Daily Report_2024-10-22_Post-Installed Anchors_7
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/12/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter Codes Final Certificate of Occupancy
02/26/2025 Letter Field Certificate of Occupancy
02/26/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home