Permit Application Status

PRCOM20242644


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20242644
Building Permit - Commercial
Certificate of Occupancy
TI SUMMIT CREST PLAZA LLC
CHANGE OF TENANT
SUMMIT CHIROPRACTIC - OFFICE EXPANSION OF CHIROPRACTOR
05/23/2024
07/01/2024
12/02/2024
10/01/2024
Locations
Contacts
TI SUMMIT CREST PLAZA LLC, Address:7611 STATE LINE RD STE 301  
Shore mechanical LLC, Address:28292 OSAWATOMIE RD, Phone:(913) 909-6694  
Powers Electric and Instrumentation LLC, Address:7317 N Liberty St  
Van Deurzen and Associates, Address:11011 King Street, Suite 130, Phone:(913) 451-6305  
AMANDA LEE INTERIORS LLC, Address:415 W 104TH ST, Phone:(913) 325-9770  
Amanda Lee - Amanda Lee Interiors, Address:415 W 104th St, Phone:(913) 325-9770  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/11/2024
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/11/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Stamped plans received 7/10/2024. Plans are to be submitted electronically to the City Portal at devservices@cityofls.net.
Installation acceptance testing
Corrective Action Required
07/11/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
07/11/2024

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing system shall have documentation of a current annual inspection. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
07/11/2024

Per Mark McKenzie, walls in rooms 109,106, and 107 are not full height.
Alarm Plan Review Rejected 07/03/2024 07/03/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
07/03/2024

No alarm plans have been uploaded.
Fire Plan Review Approved with Conditions 07/03/2024 06/26/2024
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
06/26/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide plans for modification of alram notification aplliances.
Address numbers required
Corrective Action Required
06/26/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). The entire space shall have only one address and it shall be posted on all doors for the space. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
06/26/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide plans for modifications to the sprinkler system to maintain coverage. .
Portable fire extinguishers - general
Corrective Action Required
06/26/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one 2A,10B, C fire extinguisher in the space if not already present. Verified at inspection.
Licensed Contractors Approved 07/03/2024 06/26/2024
Joe Frogge
LC - MEP Subs
Resolved
06/26/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Electrical subs.
Building Plan Review Approved 07/03/2024 06/26/2024
Joe Frogge
NEC Article 517.13 Grounding of receptacles patient care
Resolved
06/26/2024

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Licensed Contractors Rejected 06/05/2024 06/05/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
06/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Fire Plan Review Approved with Conditions 06/05/2024 06/04/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
06/04/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide plans for modification of alram notification aplliances.
Address numbers required
Corrective Action Required
06/04/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). The entire space shall have only one address and it shall be posted on all doors for the space. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
06/04/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide plans for modifications to the sprinkler system to maintain coverage. .
Portable fire extinguishers - general
Corrective Action Required
06/04/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one 2A,10B, C fire extinguisher in the space if not already present. Verified at inspection.
Building Plan Review Rejected 06/05/2024 06/04/2024
Joe Frogge
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
06/04/2024

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Misc
Resolved
06/20/2024

Provide HVAC design or provide detailed scope of work.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $100.00 $100.00 Paid 06/27/2024
7232302-Commercial License Tax Fee $2,862.75 $2,862.75 Paid 05/23/2024
$2,862.75
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 09/30/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 7/17/2024 7/17/2024 07/17/2024
Above Ceiling Inspection Not Ready 8/22/2024 08/22/2024
Miscellaneous Correction
Corrective Action Required
08/22/2024
Some ceiling tiles have already been installed and hampers above ceiling inspection. Contractor was on site during inwall inspection and was told not to install ceiling tiles before above ceiling inspection passed Not ready for inspection 08/22/2024 KBEARD 10:45am
Above Ceiling Inspection Passed 8/26/2024 8/26/2024 08/26/2024
Miscellaneous Correction
Resolved
08/26/2024
Some ceiling tiles have already been installed and hampers above ceiling inspection. Contractor was on site during inwall inspection and was told not to install ceiling tiles before above ceiling inspection passed Not ready for inspection 08/22/2024 KBEARD 10:45am
Occupancy Inspection - Codes Commercial Full C of O 10/1/2024 10/1/2024 10/01/2024
Occupancy Inspection - Fire Passed 10/1/2024 10/1/2024 10/02/2024
Documents & Images
Date Uploaded File Type Document Name
05/23/2024 Application Form APPLICATION
05/23/2024 Drawing Build out plans
05/23/2024 Letter License Tax Bill
06/05/2024 Letter DS P/R Corrections Document
06/20/2024 Letter Mechanical scope_City
06/26/2024 Letter Updated electrical scope
06/26/2024 Drawing Summit Chiropractic FP-1 - Sealed - Signed - Flat
06/26/2024 Approved Plans approved Build out plans
06/27/2024 Receipt Receipt for transaction:2024-005240
07/01/2024 Letter DS Building Permit
07/03/2024 Letter Fire (Alarm) Plan Review Notice
07/11/2024 Letter Fire (Sprinkler) Plan Review
07/11/2024 3548 SW Market APPROVED Sprinkler plans
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter DS Building Permit
08/22/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
09/30/2024 Receipt Receipt for transaction:2024-008022
10/01/2024 Letter Field Certificate of Occupancy
10/01/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home