Permit Application Status

PRCOM20241344


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20241344
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
CHANGE OF TENANT
IMAGE STUDIOS - TENANT FINISH FOR RENTAL SPACES FOR BEAUTY SERVICES
03/21/2024
05/02/2024
10/26/2024
09/04/2024
Locations
Contacts
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Goebel Mitts Construction, Address:6600 College Blvd. Suite 320 , Phone:(913) 787-1738  
KEVIN GOEBEL, Phone:(913) 484-9467  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
ELECTRICAL ASSOCIATES LLC, Address:308 W ELM ST, Phone:(913) 825-2537  
INTEGRITY PLUMBING SERVICES LLC, Address:405 SW Nelson Dr., Phone:(816) 803-9032  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE, Phone:(913) 649-8181  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 07/05/2024 07/03/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
07/03/2024

Provide smoke detector above alarm contro unit and power supply. 907.4.1 Protection of fire alarm control unit. In areas that are not continuously occupied, a single smoke detector shall be provided at the location of each fire alarm control unit, notification appliance circuit power extenders and supervising station transmitting equipment.
Sprinkler Plan Review Released for Construction 05/23/2024 05/17/2024
Craig Hill
Misc
Corrective Action Required
05/17/2024

Sprinkler System-Visual inspection will be done at the time of final inspection.
Building Plan Review Approved 05/08/2024 05/01/2024
Joe Frogge
IMC 602.2.1 Materials within plenums
Resolved
05/01/2024

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Either provide specific plumbing pipe material schedule or remove plastic options from specification sheet MP000. 4/29/24 - It is our interpretation that this situation is indeed a plenum. Amend plans to comply.
Fire Plan Review Approved with Conditions 05/08/2024 05/01/2024
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
05/01/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
05/01/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
05/01/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. All life safety systems shall be tested and operable be calling for a final inspection. Call (816) 969-1300 to schedule alarm and sprinkler tests.
Portable fire extinguishers - general
Corrective Action Required
05/01/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of two, 2A,10B,C foire extinguishers near the front and back doors. Verified at inspection.
Licensed Contractors Approved 05/01/2024 05/01/2024
Joe Frogge
Building Plan Review Rejected 04/26/2024 04/29/2024
Joe Frogge
IPC 403.1.1 Fixture calculations
Resolved
04/29/2024

2018 IPC 403.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Additional water closet required. 90/2=45. 1 required per 25 for each gender.
IPC 403.2 Separate facilities
Resolved
04/24/2024

2018 IPC 403.2 Separate Facilities. (As amended by Lee’s Summit Code of Ordinances Section 7-405) Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate facilities shall not be required for dwelling units and sleeping units. 2. Separate facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. Action required: Proposed use of coed restrooms not allowed under 2018 IBC. Given that it is allowed under subsequent years, we offer the use of our Code Modification Request (CMR) process. Application form attached.
Misc
Resolved
04/29/2024

Lee's Summit Code of Ordinance, Section 28-63. – Massage facility business license required. (See ordinance for A thru C/2) C/3. No massage facility business license shall be approved by the Director of Finance unless the facility complies with each of these minimum requirements: a. The walls shall be clean and painted with washable, mold-resistant paint in all rooms where massage is provided. Floors shall be free from any accumulation of dust, dirt or refuse. All equipment used in the business operation shall be maintained in a clean and sanitary condition. Towels, linens and items for personal use of massage therapists, employees and patrons shall be in sufficient quantity so that none is used for more than one (1) person. Heavy, white paper may be substituted for sheets if such paper is changed for each patron. No cubicle, room, booth or any area within the facility where service is to be provided patrons shall be fitted with a door capable of being locked. b. Toilet facilities shall be provided in convenient locations. When the facility is designed to accommodate any combination of five (5) or more massage therapists, employees and patrons of different sexes on the premises at the same time, separate toilet facilities shall be provided. A single water closet per sex shall be provided for any combination of twenty (20) or more massage therapists, employees or patrons that the establishment is designed to accommodate on the premises at any one time. Urinals may be substituted for water closets after one (1) water closet has been provided. Toilets shall be designated as to the sex accommodated therein. c. Lavatories or wash basins provided with both hot and cold running water shall be installed in either the toilet room or vestibule. Lavatories or wash basins shall be provided with soap in a dispenser and with sanitary towels. (See ordinance for A thru E) Lee's Summit Code of Ordinance, Section 28-65. – Operating Regulations. Operation of a massage facility shall be subject to the following regulations: (See ordinance for A thru E) F. Sanitation of massage therapists and employees. All massage therapists shall be clean and wear clean clothes. Provisions or a separate massage therapist/employee dressing room for each sex must be available on the premises and individual lockers for each massage therapist and employee. Door to such dressing rooms shall open inward. (See ordinance for G thru J) Action required: Modify designs to demonstrate compliance.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
04/29/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Modify/clarify plans to demonstrate compliance. (countertops/sinks to be maximum 34" high at Break Room 146 and Restroom 144)
Misc
Resolved
04/29/2024

Remove reference to Leawood, KS on Sheet S001, General Notes - Structural, #3.
IPC 918.1 Air admittance valve
Resolved
04/29/2024

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Replace air admittance valves with hard piping to exterior. (amend all relevant P drawings)
IMC 602.2.1 Materials within plenums
Corrective Action Required
04/19/2024

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Either provide specific plumbing pipe material schedule or remove plastic options from specification sheet MP000. 4/29/24 - It is our interpretation that this situation is indeed a plenum. Amend plans to comply.
IBC 1606.2 Design dead load - structural
Resolved
04/29/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load at new hvac equipment.
Licensed Contractors Approved 04/26/2024 04/26/2024
Joe Frogge
LC - MEP Subs
Resolved
04/26/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 04/26/2024 04/25/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
04/19/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
04/19/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
04/19/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. All life safety systems shall be tested and operable be calling for a final inspection. Call (816) 969-1300 to schedule alarm and sprinkler tests.
Portable fire extinguishers - general
Corrective Action Required
04/19/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of two, 2A,10B,C foire extinguishers near the front and back doors. Verified at inspection.
Fire Plan Review Approved with Conditions 04/02/2024 04/03/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
04/03/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
04/03/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
04/03/2024

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. All life safety systems shall be tested and operable be calling for a final inspection. Call (816) 969-1300 to schedule alarm and sprinkler tests.
Portable fire extinguishers - general
Corrective Action Required
04/03/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of two, 2A,10B,C foire extinguishers near the front and back doors. Verified at inspection.
Building Plan Review Rejected 04/02/2024 04/01/2024
Joe Frogge
IPC 403.1.1 Fixture calculations
Corrective Action Required
04/01/2024

2018 IPC 403.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Additional water closet required. 90/2=45. 1 required per 25 for each gender.
IPC 403.2 Separate facilities
Corrective Action Required
04/01/2024

2018 IPC 403.2 Separate Facilities. (As amended by Lee’s Summit Code of Ordinances Section 7-405) Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate facilities shall not be required for dwelling units and sleeping units. 2. Separate facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. Action required: Proposed use of coed restrooms not allowed under 2018 IBC. Given that it is allowed under subsequent years, we offer the use of our Code Modification Request (CMR) process. Application form attached.
Misc
Corrective Action Required
04/01/2024

Lee's Summit Code of Ordinance, Section 28-63. – Massage facility business license required. (See ordinance for A thru C/2) C/3. No massage facility business license shall be approved by the Director of Finance unless the facility complies with each of these minimum requirements: a. The walls shall be clean and painted with washable, mold-resistant paint in all rooms where massage is provided. Floors shall be free from any accumulation of dust, dirt or refuse. All equipment used in the business operation shall be maintained in a clean and sanitary condition. Towels, linens and items for personal use of massage therapists, employees and patrons shall be in sufficient quantity so that none is used for more than one (1) person. Heavy, white paper may be substituted for sheets if such paper is changed for each patron. No cubicle, room, booth or any area within the facility where service is to be provided patrons shall be fitted with a door capable of being locked. b. Toilet facilities shall be provided in convenient locations. When the facility is designed to accommodate any combination of five (5) or more massage therapists, employees and patrons of different sexes on the premises at the same time, separate toilet facilities shall be provided. A single water closet per sex shall be provided for any combination of twenty (20) or more massage therapists, employees or patrons that the establishment is designed to accommodate on the premises at any one time. Urinals may be substituted for water closets after one (1) water closet has been provided. Toilets shall be designated as to the sex accommodated therein. c. Lavatories or wash basins provided with both hot and cold running water shall be installed in either the toilet room or vestibule. Lavatories or wash basins shall be provided with soap in a dispenser and with sanitary towels. (See ordinance for A thru E) Lee's Summit Code of Ordinance, Section 28-65. – Operating Regulations. Operation of a massage facility shall be subject to the following regulations: (See ordinance for A thru E) F. Sanitation of massage therapists and employees. All massage therapists shall be clean and wear clean clothes. Provisions or a separate massage therapist/employee dressing room for each sex must be available on the premises and individual lockers for each massage therapist and employee. Door to such dressing rooms shall open inward. (See ordinance for G thru J) Action required: Modify designs to demonstrate compliance.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
04/01/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Modify/clarify plans to demonstrate compliance. (countertops/sinks to be maximum 34" high at Break Room 146 and Restroom 144)
Misc
Corrective Action Required
04/01/2024

Remove reference to Leawood, KS on Sheet S001, General Notes - Structural, #3.
IPC 918.1 Air admittance valve
Corrective Action Required
04/01/2024

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Replace air admittance valves with hard piping to exterior. (amend all relevant P drawings)
IMC 602.2.1 Materials within plenums
Corrective Action Required
04/01/2024

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Either provide specific plumbing pipe material schedule or remove plastic options from specification sheet MP000.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/01/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load at new hvac equipment.
Licensed Contractors Rejected 04/02/2024 03/29/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/29/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $6,000.00 $6,000.00 Paid 05/01/2024
$0.00
7232302-Commercial License Tax Fee $14,883.00 $14,883.00 Paid 04/01/2024
$14,883.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 5/21/2024 5/21/2024 05/21/2024
Misc
Corrective Action Required
05/21/2024
-All dwv west of center column line complete
Underslab Plumbing Inspection - Commercial Passed 5/22/2024 5/22/2024 05/22/2024
Misc
Resolved
05/22/2024
-All dwv west of center column line complete
In-wall Inspection Partial 6/17/2024 6/17/2024 06/17/2024
Misc
Partial Correction
06/17/2024
Rooms 102-108, 117-131, 134-140 **Secure mc within 12" of boxes -Demo conductors at back wall fur out wall OK TO 1 side all locations
All Rough Inspection - Commercial Partial 6/21/2024 06/21/2024
Misc
Corrective Action Required
06/21/2024
Complete except as noted: -110, 111, 113 not complete -145 protect dryer ducts min 2” below plate line
Electrical Service Inspection Passed 6/24/2024 06/24/2024
Misc
Informational
06/24/2024
400 amp electrical service approved
In-wall Inspection Passed 6/26/2024 6/26/2024 06/26/2024
Misc
Resolved
06/26/2024
Rooms 102-108, 117-131, 134-140 **Secure mc within 12" of boxes -Demo conductors at back wall fur out wall OK TO 1 side all locations
Above Ceiling Inspection Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
06/26/2024
-Hard lids at break room 146 and restrooms 144 approved
Above Ceiling Inspection Failed 7/17/2024 7/17/2024 07/17/2024
Misc
Informational
06/26/2024
-Hard lids at break room 146 and restrooms 144 approved *7/17/24 -not ready. Complete MEPs
Above Ceiling Inspection Partial 7/19/2024 7/19/2024 07/19/2024
Misc
Informational
07/17/2024
OK to cover except as noted below: -Mechanical room (open ceiling) PVC piping must comply with sec 602 of 2018 IMC -123, 124-not done -115-Seal penetrations in firewall -Complete electrical and install cover plate at back wall
Above Ceiling Inspection Partial 7/29/2024 07/29/2024
Misc
Informational
07/19/2024
OK to cover except as noted below: -Mechanical room (open ceiling) PVC piping must comply with sec 602 of 2018 IMC
Gas Service Inspection - Commercial Passed 8/1/2024 8/1/2024 08/01/2024
Gas Piping Inspection - Commercial Partial 8/1/2024 08/01/2024
Misc
Corrective Action Required
08/01/2024
Pressure test ok -Paint all exterior metallic gas piping with corrosion resistant paint
Alarm Test Passed 8/28/2024 08/28/2024
Occupancy Inspection - Codes Commercial Failed 9/3/2024 9/3/2024 09/03/2024
Misc
Corrective Action Required
09/03/2024
-Complete corrections for LSFD -Provide min 27" knee clearance at water fountain -Provide min 27" knee clearance at restroom sink -Mirrors to be max 40" aff to reflective surface -Provide GFCI protection at suite 110 -Missing cover plates at 102 -Paint rooftop gas line
Above Ceiling Inspection Passed 9/3/2024 9/3/2024 09/03/2024
Misc
Resolved
09/03/2024
OK to cover except as noted below: -Mechanical room (open ceiling) PVC piping must comply with sec 602 of 2018 IMC
Occupancy Inspection - Fire Failed 9/3/2024 9/3/2024 09/03/2024
Occupancy Inspection - Codes Commercial Full C of O 9/4/2024 9/4/2024 09/04/2024
Misc
Resolved
09/04/2024
-Complete corrections for LSFD -Provide min 27" knee clearance at water fountain -Provide min 27" knee clearance at restroom sink -Mirrors to be max 40" aff to reflective surface -Provide GFCI protection at suite 110 -Missing cover plates at 102 -Paint rooftop gas line
Gas Piping Inspection - Commercial Passed 09/04/2024
Misc
Resolved
09/04/2024
Pressure test ok -Paint all exterior metallic gas piping with corrosion resistant paint
All Rough Inspection - Commercial Passed 09/04/2024
Misc
Resolved
09/04/2024
Complete except as noted: -110, 111, 113 not complete -145 protect dryer ducts min 2” below plate line
Occupancy Inspection - Fire Passed 9/4/2024 09/04/2024
Documents & Images
Date Uploaded File Type Document Name
03/21/2024 Application Form Commercial Permit Application
03/21/2024 Plans _Lee's Summit - Image Studios - Permit Set
03/21/2024 Letter License Tax Bill
04/03/2024 Letter DS P/R Corrections Document
04/19/2024 Letter _Lee's Summit - Image Studios - City Response Letter Rev1
04/19/2024 Letter _Lee's Summit - Image Studios - Change Narrative Rev1
04/19/2024 Letter _Lee's Summit - Image Studios - Code Modification Request COMMERCIAL
04/19/2024 Plans _Lee's Summit - Image Studios - Permit Set Rev1
04/24/2024 Code Mod Request Code Modification Request COMMERCIAL
04/25/2024 Letter Fire Building Plan Review
04/25/2024 Plans _Lee's Summit - Image Studios - Permit Set Rev1
04/29/2024 Letter DS P/R Corrections Document
05/01/2024 Letter 24-0429 City Response Letter Signed
05/01/2024 Plans _Lee's Summit - Image Studios - Permit Set Rev2
05/01/2024 Letter _Lee's Summit - Image Studios - City Response Letter Rev2
05/01/2024 Approved Plans Approved - Image Studios - Permit Set Rev3
05/01/2024 Receipt Receipt for transaction:2024-002815
05/02/2024 Letter DS Building Permit
05/09/2024 Plans Image studios FP 1 (2)
05/17/2024 Letter Fire (Sprinkler) Plan Review
05/17/2024 Approved Plans Image studios FP 1 Approved
05/21/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/21/2024 Sealed - Marmic Fire - Image Studio Summit Far FA-Book rev2_RT Approved as Corrected
06/21/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter Fire Building Plan Review
06/24/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
09/03/2024 Plenum Rating of Knauf Insulation Earthwool 1000 Pipe Insulation Validation
09/03/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter Codes Final Certificate of Occupancy
09/04/2024 Letter Field Certificate of Occupancy
09/04/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home