Permit Application Status

PRCOM20232039


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232039
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
ALTERATION COMMERCIAL
RENOVATE EXISTING SALON
05/05/2023
07/21/2023
11/14/2023
01/17/2024
Locations
Contacts
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Russell Construction CO. KC, LLC, Address:10901 Lowell Ave Suite 100, Phone:(913) 747-7400  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
M & S ELECTRIC, Address:PO BOX 1147, Phone:(816) 427-5913  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit A, Phone:(816) 249-2270  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/05/2023 07/21/2023
Brandon Kalwei
LC - General Contractor
Corrective Action Required
05/26/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 5/30/2023 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
05/26/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/30/2023 - acknowledged in letter
Fire Plan Review Approved with Conditions 06/05/2023 06/06/2023
Tracy Deister
Construction documents - Fire protection systems
Corrective Action Required
06/06/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for fire sprinkler modification. Submit plans to devservice.cityofls.net .
Construction documents for fire alarm systems
Corrective Action Required
06/06/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for fire alarm modification. Submit plans to devservice.cityofls.net .
Fire Plan Review Approved with Conditions 05/30/2023 05/30/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
05/26/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for fire sprinkler modification. Submit plans to devservice.cityofls.net .
Portable fire extinguishers - conspicuous locations
Resolved
05/30/2023

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Provide one 2A:10B:C fire extinguisher in the space. Verified at inspection.
Construction documents for fire alarm systems
Corrective Action Required
05/26/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for fire alarm modification. Submit plans to devservice.cityofls.net .
Building Plan Review Approved 06/05/2023 05/30/2023
Joe Frogge
ICC A117.1 904.3 Sales and Service Counters
Resolved
05/30/2023

ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum. Action required: Provide at least 36 linear inches of counter space that is maximum 36" high.
IMC 801.2 Combustion air required
Resolved
05/30/2023

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Enclosing furnace room in restroom is problematic if furnace is gas fired. Provide verification that unit has adequate combustion and ventilation. 5/30/2023 - not applicable - per architect the furnace is not gas fired
Fire Plan Review Approved with Conditions 05/17/2023 05/18/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
05/18/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for fire sprinkler modification. Submit plans to devservice.cityofls.net .
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/18/2023

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Provide one 2A:10B:C fire extinguisher in the space. Verified at inspection.
Construction documents for fire alarm systems
Corrective Action Required
05/18/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for fire alarm modification. Submit plans to devservice.cityofls.net .
Building Plan Review Rejected 05/17/2023 05/16/2023
Joe Frogge
ICC A117.1 904.3 Sales and Service Counters
Corrective Action Required
05/16/2023

ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum. Action required: Provide at least 36 linear inches of counter space that is maximum 36" high.
IMC 801.2 Combustion air required
Corrective Action Required
05/16/2023

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Enclosing furnace room in restroom is problematic if furnace is gas fired. Provide verification that unit has adequate combustion and ventilation.
Licensed Contractors Rejected 05/17/2023 05/16/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
05/16/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
05/16/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $720.00 $720.00 Paid 07/21/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 9/7/2023 9/7/2023 09/07/2023
Misc
Informational
09/07/2023
Inspected P201 D 6-2
Footing Inspection - Commercial Passed 9/11/2023 (10:15) 9/11/2023 09/11/2023
Above Ceiling Inspection Partial 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
10/31/2023
Hard lids ok to cover
In-wall Inspection Failed 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
10/31/2023
-Provide protection plates at all dwv within 1.25" to face of framing
In-wall Inspection Passed 11/1/2023 11/1/2023 11/01/2023
Above Ceiling Inspection Failed 11/01/2023
Misc
Corrective Action Required
10/31/2023
Hard lids ok to cover -Route salon exhaust through second floor and roof per plan
Above Ceiling Inspection Failed 12/15/2023 12/15/2023 12/15/2023
Misc
Corrective Action Required
11/01/2023
Hard lids ok to cover -MC not allowed above drop ceiling per NEC 334.12
Above Ceiling Inspection Passed 12/21/2023 12/21/2023 12/21/2023
Misc
Resolved
12/21/2023
Hard lids ok to cover -MC not allowed above drop ceiling per NEC 334.12
Underslab Plumbing Inspection - Commercial Passed 01/11/2024
Misc
Resolved
01/11/2024
Inspected P201 D 6-2
Occupancy Inspection - Codes Commercial Failed 1/11/2024 1/11/2024 01/11/2024
Misc
Corrective Action Required
01/11/2024
-Complete corrections for LSFD -Install missing sprinkler escucheons -Cover open electrical at mechanical closet -Install air capture ducts at separate stations -Clarify specs for installed exaust fan EF-1 (plans call for min 371 cfm), submittal shows 334 cfms -Provide hammer arrestors at pedicure station
Occupancy Inspection - Codes Commercial Full C of O 1/17/2024 1/17/2024 01/17/2024
Misc
Resolved
01/17/2024
-Complete corrections for LSFD -Install missing sprinkler escucheons -Cover open electrical at mechanical closet -Install air capture ducts at separate stations -Clarify specs for installed exaust fan EF-1 (plans call for min 371 cfm), submittal shows 334 cfms -Provide hammer arrestors at pedicure station
Occupancy Inspection - Fire Passed 1/11/2024 1/17/2024 01/17/2024
Documents & Images
Date Uploaded File Type Document Name
05/05/2023 Application Form APPLICATION
05/08/2023 Plans 22118_JKV Salon Redesign_Permit Set_230503
05/18/2023 Letter DS P/R Corrections Document
05/26/2023 Plans 22118_JKV Salon Redesign_Permit Set_Delta1_230526
05/26/2023 Letter 22118_R20_JKV Salon Redesign_Delta1_City Comments_Narrative_230526
05/26/2023 Letter 22118_R20_JKV Salon Redesign_Delta1_City Comments_Responses_230526
06/08/2023 Plans 22118_JKV Salon Redesign_Permit Set_Combined_230608
06/08/2023 Approved Plans approved - 22118_JKV Salon Redesign_Permit Set_Combined_230608
06/08/2023 Approved Plans APPROVED SUMMIT ORCHARD LOT 4E2 INLINE ELEVATIONS
07/21/2023 Receipt Receipt for transaction: 2023-005662
07/21/2023 Letter DS Building Permit
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter Fire Building Plan Review
09/11/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/01/2023 Letter INSPECTION SUMMARY
11/01/2023 Letter INSPECTION SUMMARY
11/01/2023 Letter INSPECTION SUMMARY
11/02/2023 Drawing 22118_JKV Salon Redesign_Delta2_M201 - MECHANICAL FLOOR PLAN_231102
11/02/2023 Letter 22118_JKV Salon Redesign_Delta2_Responses_231102
11/03/2023 Approved Plans approved m201
12/15/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/17/2024 Letter Codes Final Certificate of Occupancy
01/17/2024 Letter Field Certificate of Occupancy
01/17/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home