Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved with Conditions
|
06/15/2023
|
06/14/2023
|
|
Joe Frogge
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
|
|
|
Engineering Review
|
Approved
|
06/15/2023
|
06/09/2023
|
|
Sue Pyles, P.E.
|
|
s
|
Zoning Review
|
Approved
|
06/15/2023
|
06/09/2023
|
|
Hector Soto Jr.
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
06/01/2023
|
06/05/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Stamped plans received.
|
|
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed.
The existing system shall have documentation of a current annual inspection. Verified at inspection.
|
|
Misc
Corrective Action Required
Modifications will be confirmed at the occupancy inspection. No additional testing or inspections needed.
|
|
|
Building Plan Review
|
Approved with Conditions
|
03/14/2023
|
05/02/2023
|
|
Joe Frogge
|
|
Project cost
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is informational.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
|
|
|
Health Department Review
|
Approved
|
|
05/02/2023
|
|
Joe Frogge
|
|
|
Licensed Contractors
|
Approved
|
03/14/2023
|
04/28/2023
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Final Development Plan Review
|
Approved
|
04/24/2023
|
04/24/2023
|
|
Scott Ready
|
|
Summer Moon Coffee Drive-Thru and Interior Remodel.
|
Fire Plan Review
|
Approved with Conditions
|
03/14/2023
|
03/14/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide as built plans for any modification to the fire sprinkler system.
|
|
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed.
The existing sprinkler system shall have proof of a current annual inspection.
|
|
|