Permit Application Status

PRCOM20220897


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220897
Building Permit - Commercial
Certificate of Occupancy
NEW MULTI-FAMILY
NEW 5 UNIT TOWNHOMES **Approved plans are in PRCOM20214607
03/10/2022
04/29/2022
05/11/2022
07/27/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
nwintjen@brinkmannconstructors.com, Address:nwintjen@brinkmannconstructors.com  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 04/29/2022
Joe Frogge
Licensed Contractors Approved 11/19/2021 03/10/2022
Joe Frogge
LC - MEP Subs
Resolved
03/10/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/1/21 - acknowledged in letter
LC - General Contractor
Resolved
03/10/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/1/21 - acknowledged in letter
Building Plan Review Rejected 02/24/2022 02/18/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/12/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Resolved
03/10/2022

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building. 10/1/21 - acknowledged in letter
Engineered truss package
Corrective Action Required
11/12/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 10/1/21 - deferred per request
IBC 706.1 Fire and Smoke Protection - General
Resolved
11/15/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field) 10/1/21 - construction details are in Appendix 1 of project manual
Miscellaneous Correction
Corrective Action Required
11/12/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Building Plan Review Rejected 10/05/2021 10/01/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/28/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Corrective Action Required
09/28/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building. 10/1/21 - acknowledged in letter
Misc
Resolved
10/01/2021

Designs appear to be designed per IRC but code analysis suggests IBC. Action required: Update code analysis code references including type of construction.
Engineered truss package
Corrective Action Required
09/28/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 10/1/21 - deferred per request
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
09/28/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field) 10/1/21 - construction details are in Appendix 1 of project manual
Misc
Resolved
10/01/2021

2018 IRC R310 - emergency escape openings. Action required: Bedroom windows must meet all emergency egress requirements. To be field verified.
Misc
Resolved
10/01/2021

2018 IRC 302.5 Dwelling-garage opening and penetration protection. Action required: Specify self-closing device at doors between dwelling units and garages. Applies to man-door and door leading to under stair storage.
Misc
Resolved
10/01/2021

2018 IRC 302.7 Under-stair protection. Action required: Specify 1/2" gyp board at walls, under-stair, ceiling, etc. under stairs where access is provided.
Misc
Resolved
10/01/2021

2018 IRC 301.2.1 Wind design criteria. Action required: Provide verification that garage doors are designed and will be installed for minimum 90mph wind design zone.
IBC 1803.1 General - geotech
Resolved
10/01/2021

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Structural design criteria conflicts with report. Clarify.
Misc
Resolved
10/01/2021

2018 IRC 302.12 & 502.12 Draftstopping. Action required: Specify draftstopping at floor and roof assemblies.
Misc
Resolved
10/01/2021

HVAC condensing units shown on ground and roof. Action required: Clarify. Also, if on roof, electric outlets are required within 25' of each unit per 2018 IRC R3901.12.
Misc
Resolved
10/01/2021

2018 IRC R2903.3.1 Maximum pressure. Action required: Provide pressure reducing valve at each service.
Miscellaneous Correction
Resolved
10/01/2021

2018 IRC 2903.5 Water Hammer. Action required: Provide water hammer device(s) at all appropriate locations. Remove references to air chambers as they are no longer allowed.
Miscellaneous Correction
Corrective Action Required
09/28/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Licensed Contractors Rejected 10/05/2021 10/01/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/28/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/1/21 - acknowledged in letter
LC - General Contractor
Corrective Action Required
09/28/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/1/21 - acknowledged in letter
Building Plan Review Rejected 09/20/2021 09/15/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/14/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Corrective Action Required
09/14/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building.
Misc
Corrective Action Required
09/14/2021

Designs appear to be designed per IRC but code analysis suggests IBC. Action required: Update code analysis code references including type of construction.
Engineered truss package
Corrective Action Required
09/15/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
09/15/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field)
Misc
Corrective Action Required
09/15/2021

2018 IRC R310 - emergency escape openings. Action required: Bedroom windows must meet all emergency egress requirements. To be field verified.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.5 Dwelling-garage opening and penetration protection. Action required: Specify self-closing device at doors between dwelling units and garages. Applies to man-door and door leading to under stair storage.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.7 Under-stair protection. Action required: Specify 1/2" gyp board at walls, under-stair, ceiling, etc. under stairs where access is provided.
Misc
Corrective Action Required
09/15/2021

2018 IRC 301.2.1 Wind design criteria. Action required: Provide verification that garage doors are designed and will be installed for minimum 90mph wind design zone.
IBC 1803.1 General - geotech
Corrective Action Required
09/15/2021

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Structural design criteria conflicts with report. Clarify.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.12 & 502.12 Draftstopping. Action required: Specify draftstopping at floor and roof assemblies.
Misc
Corrective Action Required
09/15/2021

HVAC condensing units shown on ground and roof. Action required: Clarify. Also, if on roof, electric outlets are required within 25' of each unit per 2018 IRC R3901.12.
Misc
Corrective Action Required
09/15/2021

2018 IRC R2903.3.1 Maximum pressure. Action required: Provide pressure reducing valve at each service.
Miscellaneous Correction
Corrective Action Required
09/15/2021

2018 IRC 2903.5 Water Hammer. Action required: Provide water hammer device(s) at all appropriate locations. Remove references to air chambers as they are no longer allowed.
Miscellaneous Correction
Corrective Action Required
09/15/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Licensed Contractors Rejected 09/17/2021 09/14/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/14/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
09/14/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $6,871.07 $6,871.07 Paid 04/19/2022
8331507-Sewer Connection Fee $1,650.00 $1,650.00 Paid 04/19/2022
7232302-Residential License Tax Fee $3,046.40 $3,046.40 Paid 04/19/2022
8331401-Water Tap Fee $18,275.00 $18,275.00 Paid 04/19/2022
8350015-Water Meter Fee $2,396.20 $2,396.20 Paid 04/19/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/03/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/03/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/15/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/14/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 5/18/2022 (9:00) 5/18/2022 05/18/2022
Misc
Informational
05/18/2022
PERIMETER FOOTING OK TO POUR UFER LOCATED SOUTH WALL ABOUT 8' FROM REAR (WEST)
Underslab Plumbing Inspection - Commercial Failed 5/27/2022 5/27/2022 05/27/2022
Misc
Corrective Action Required
05/27/2022
main line: gravel and bed the PVC as per code and support. recall when ready
Underslab Plumbing Inspection - Commercial Passed 6/2/2022 6/2/2022 06/02/2022
Misc
Corrective Action Required
05/27/2022
main line: gravel and bed the PVC as per code and support. recall when ready
Underslab Electrical Inspection - Commercial Failed 6/6/2022 6/6/2022 06/06/2022
Miscellaneous Correction
Corrective Action Required
06/06/2022
6-6-22 No electrical installed
Footing Inspection - Commercial Passed 6/10/2022 6/10/2022 06/10/2022
Misc
Informational
05/18/2022
PERIMETER FOOTING OK TO POUR UFER LOCATED SOUTH WALL ABOUT 8' FROM REAR (WEST) -FOOTINGS FOR PORCHES ALL BUILDINGS
Sewer Service Inspection Partial 8/29/2022 08/29/2022
Misc
Informational
08/29/2022
Miller plumbing was working on sanitary service on NW side of building. 8/29/22 ES
Water Service Inspection Passed 8/30/2022 08/30/2022
Misc
Informational
08/30/2022
Water service connections made 6/3/22 ES
All Rough Inspection - Commercial Failed 11/10/2022 11/10/2022
Miscellaneous Correction
Corrective Action Required
11/10/2022
1000 Nail joist hanger under landing Fire blocking master closet 1002 Nail joist hangers garage Seal fire block behind pre rock closet behind laundry 1004 Screw clip rear corner garage Fire block behind pre rock closet behind 1006 OK 1008 Ok
All Rough Inspection - Commercial Passed 11/11/2022 11/11/2022
Miscellaneous Correction
Corrective Action Required
11/10/2022
1000 Ok 1002 Ok 1004 Ok 1006 OK 1008 Ok
Electrical Service Inspection Failed 12/16/2022 12/16/2022 12/16/2022
Misc
Corrective Action Required
12/16/2022
-LAND GROUNDING CONDUCTORS ON NEUTRAL BAR
Electrical Service Inspection Passed 12/21/2022 12/21/2022 12/21/2022
Misc
Resolved
12/21/2022
-LAND GROUNDING CONDUCTORS ON NEUTRAL BAR
Sewer Service Inspection Passed 3/10/2023 03/10/2023
Misc
Informational
08/29/2022
Miller plumbing was working on sanitary service on NW side of building. 8/29/22 ES ok per steve Kyle Beard 03/10/2023 7:46 AM
Occupancy Inspection - Engineering Temporary C of O 3/10/2023 3/10/2023 03/10/2023
Misc
Corrective Action Required
03/10/2023
We are good to go on TCO. Punch list items- 1. Two SW panels in front of 1000 at the bend are out of compliance 2. Two water meters i believe for 1002 and 1004 (currently the 2 behind the porta potties) are very shallow. 14-18" from top of meter to bottom of lid is what they should be set at 3. Finish pouring SW that isn't in yet 4. Vegetation
Occupancy Inspection - Codes Commercial Failed 3/10/2023 3/10/2023 03/10/2023
Misc
Corrective Action Required
03/10/2023
1000, 1002, 1004, 1006 and 1008 -Lower handrail does not have proper clearance, between wall and handrail. -island electrical outlet is to low and needs to be reinstalled no lower than 12 inches below counter if over the island plate edge. -Water hammer arrestor needs to be installed under kitchen sink
Rated Assembly Inspection Passed 03/30/2023
Rated Assembly Inspection Passed 03/30/2023
Miscellaneous Inspection Passed 3/30/2023 3/30/2023 03/30/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/30/2023 3/30/2023 03/30/2023
Misc
Corrective Action Required
03/10/2023
1000, 1002, 1004, 1006 and 1008 -Lower handrail does not have proper clearance, between wall and handrail. -island electrical outlet is to low and needs to be reinstalled no lower than 12 inches below counter if over the island plate edge. -Water hammer arrestor needs to be installed under kitchen sink
Occupancy Inspection - Codes Commercial Ready for Temp CO 05/02/2023
Misc
Corrective Action Required
03/30/2023
1000, 1002, 1004, 1006 and 1008 -Lower handrail does not have proper clearance, between wall and handrail. -island electrical outlet is to low and needs to be reinstalled no lower than 12 inches below counter if over the island plate edge. -Water hammer arrestor needs to be installed under kitchen sink
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/3/2023 05/03/2023
Misc
Corrective Action Required
05/02/2023
1000, 1002, 1004, 1006 and 1008 -Lower handrail does not have proper clearance, between wall and handrail. -island electrical outlet is to low and needs to be reinstalled no lower than 12 inches below counter if over the island plate edge. -Water hammer arrestor needs to be installed under kitchen sink
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/14/2023 06/14/2023
Misc
Corrective Action Required
05/03/2023
Complete final grade, sod, foundation drainage
Occupancy Inspection - Codes Commercial Ready for Temp CO 7/14/2023 07/14/2023
Misc
Corrective Action Required
06/14/2023
Complete final grade, sod, foundation drainage
Occupancy Inspection - Codes Commercial Full C of O 07/27/2023
Documents & Images
Date Uploaded File Type Document Name
04/19/2022 Receipt Receipt for transaction:2022-002185
04/29/2022 Letter DS Building Permit
05/18/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
06/02/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
08/30/2022 Letter INSPECTION SUMMARY
11/10/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
12/16/2022 Letter INSPECTION SUMMARY
12/21/2022 Letter INSPECTION SUMMARY
03/10/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
04/03/2023 Certificate/License Codes Temporary Certificate of Occupancy
04/03/2023 Receipt Receipt for transaction:2023-001823
05/01/2023 Substantial Completion and TCO Extension Request_prcom20220897_5_1_23
05/03/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/03/2023 Receipt Receipt for transaction:2023-002749
05/15/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/15/2023 Receipt Receipt for transaction:2023-003305
06/14/2023 Substantial Completion and TCO Extension Request_prcom20220897_6_14_23
06/14/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/14/2023 Receipt Receipt for transaction:2023-004397
07/27/2023 Letter Codes Final Certificate of Occupancy
01/03/2024 Codes Temporary Certificate of Occupancy166
01/03/2024 Codes Temporary Certificate of Occupancy197
01/03/2024 Codes Temporary Certificate of Occupancy236
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home