Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved with Conditions
|
03/25/2022
|
03/18/2022
|
|
Joe Frogge
|
|
Misc
Inadequate information to complete review.
Provide the following:
- Complete HVAC and Plumbing designs
3/17/22 - provide the following:
- Plumbing plan submitted insufficient; provide pipe material schedule and fixture specs.
- HVAC design still required. Description provided doesn't match arch. design.
3/18/22 - Still need hvac plan. All rooms need supplya and return air. Restroom needs exhaust fan. PVC piping shown but might not be allowed. Plenum return? ducted? Told on phone that walls don't reach ceiling but that conflicts with architect's design.
|
|
IPC 403.1 Minimum number of fixtures
Corrective Action Required
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Provide mop sink and drinking fountain (or approved equivalent).
3/14/21 - mop sink omitted due to occ load <15 & they will use a water cooler.
3/17/21 - presence of water cooler to be field verified during inspections
|
|
|
Licensed Contractors
|
Approved
|
03/18/2022
|
03/18/2022
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/25/2022
|
03/18/2022
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
All other existing conditions verified for compliance at time of inspection.
|
|
|
Building Plan Review
|
Rejected
|
03/25/2022
|
03/18/2022
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
Inadequate information to complete review.
Provide the following:
- Complete HVAC and Plumbing designs
3/17/22 - provide the following:
- Plumbing plan submitted insufficient; provide pipe material schedule and fixture specs.
- HVAC design still required. Description provided doesn't match arch. design.
3/18/22 - Still need hvac plan. All rooms need supplya and return air. Restroom needs exhaust fan. PVC piping shown but might not be allowed. Plenum return? ducted? Told on phone that walls don't reach ceiling but that conflicts with architect's design.
|
|
IPC 403.1 Minimum number of fixtures
Corrective Action Required
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Provide mop sink and drinking fountain (or approved equivalent).
3/14/21 - mop sink omitted due to occ load <15 & they will use a water cooler.
3/17/21 - presence of water cooler to be field verified during inspections
|
|
IBC 1209.2 Finish materials
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Specify compliant materials at restroom and mop sink. If paint is used it must be epoxy based.
|
|
|
Licensed Contractors
|
Approved
|
03/18/2022
|
03/18/2022
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/25/2022
|
03/18/2022
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
All other existing conditions verified for compliance at time of inspection.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/17/2022
|
03/17/2022
|
|
Jim Eden
|
|
Misc
Corrective Action Required
All other existing conditions verified for compliance at time of inspection.
|
|
|
Building Plan Review
|
Rejected
|
03/17/2022
|
03/11/2022
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
Inadequate information to complete review.
Provide the following:
- Complete HVAC and Plumbing designs
3/17/21 - provide the following:
- Plumbing plan submitted insufficient; provide pipe material schedule and fixture specs.
- HVAC design still required. Description provided doesn't match arch. design.
|
|
IPC 403.1 Minimum number of fixtures
Corrective Action Required
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Provide mop sink and drinking fountain (or approved equivalent).
3/14/21 - mop sink omitted due to occ load <15 & they will use a water cooler.
3/17/21 - presence of water cooler to be field verified during inspections
|
|
IBC 1209.2 Finish materials
Corrective Action Required
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Specify compliant materials at restroom and mop sink. If paint is used it must be epoxy based.
|
|
|
Licensed Contractors
|
Approved
|
03/07/2022
|
03/07/2022
|
|
Joe Frogge
|
|
|