Permit Application Status

PRCOM20220740


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220740
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
CHANGE OF TENANT
TENANT FINISH FOR FURNITURE STORE
03/01/2022
06/15/2022
10/10/2022
12/13/2022
Locations
Contacts
Furniture Mall of Missouri, Address:1901 SW Wanamaker Rd  
Jamie Winter, Address:JamieW@FurnitureMallOfKansas.com  
CEI ELECTRICAL AND MECHANICAL, Address:2900 E. 13th Street, Phone:(816) 221-0006  
CURRENT ELECTRIC, Address:10310 W 73RD TERR, Phone:(913) 486-9804  
PRYOR MECHANICAL , Address:221 NW 180TH ST, Phone:(816) 532-1161  
The Hive Design Collaborative, Address:1617 Walnut St, Phone:(816) 581-6363  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 07/01/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
07/01/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Received June 2, 2022.
Installation acceptance testing
Corrective Action Required
07/01/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Cal (816) 969-1300 to schedule an alarm test.
Miscellaneous Correction
Corrective Action Required
07/01/2022

Fire Alarm Matrix- Silent mode shall silence the audibles and stop the strobes.
Misc
Corrective Action Required
07/01/2022

The manual pull station near the south door may be moved to a constantly attended location (service desk) if preferred.
Licensed Contractors Approved 04/26/2022 06/15/2022
Development Center
LC - MEP Subs
Corrective Action Required
04/19/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/5/22 - acknowledged in letter
LC - General Contractor
Corrective Action Required
04/19/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 4/5/22 - acknowledged in letter
Fire Plan Review Approved with Conditions 04/26/2022 04/25/2022
Jim Eden
Construction documents for fire alarm systems
Informational
04/25/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide plans for modification to the alarm system to maintain coverage.
Construction documents - Fire protection systems
Informational
04/25/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide plans for modification to the sprinkler system to maintain coverage. Confirm the hazard classification for the existing system is appropriate for the commodity on display and stored in the warehouse area.
Miscellaneous Correction
Corrective Action Required
04/19/2022

How will materials be stored in the warehouse? Provide a storage plan. 4/ 25/2022- Action required- Provide a storage plan. Sheet A-111 is the Site Plan .
Miscellaneous Correction
Corrective Action Required
04/19/2022

3201.3 Construction documents. At the time of building permit application for new permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. What is the hazard classification for the existing system and is suitable for the commodity being added? 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. 4/25/2022- Action required- Provide complete information on storage in the warehouse area.
Building Plan Review Approved with Conditions 04/26/2022 04/21/2022
Joe Frogge
Final Development Plan
Resolved
04/21/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 4/5/22 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
04/19/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 4/5/22 - acknowledged in letter
Fire Plan Review Rejected 04/06/2022 04/12/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/30/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide plans for modification to the alarm system to maintain coverage.
Construction documents - Fire protection systems
Corrective Action Required
03/30/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide plans for modification to the sprinkler system to maintain coverage. Confirm the hazard classification for the existing system is appropriate for the commodity on display and stored in the warehouse area.
Miscellaneous Correction
Corrective Action Required
03/30/2022

How will materials be stored in the warehouse? Provide a storage plan. Action required- Provide a storage plan
Miscellaneous Correction
Corrective Action Required
03/30/2022

3201.3 Construction documents. At the time of building permit application for new permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and longitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide information on storage in the warehouse area including commodity classification.
Health Department Review Approved 04/05/2022
Joe Frogge
Building Plan Review Rejected 04/06/2022 04/05/2022
Joe Frogge
Final Development Plan
Corrective Action Required
03/30/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 4/5/22 - acknowledged in letter
Health Dept Review
Resolved
04/05/2022

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 4/5/22 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
03/30/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 4/5/22 - acknowledged in letter
IBC 1013.1 Where required - exit sign
Resolved
04/05/2022

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Actions required: - Modify plans to demonstrate how you will comply with 1016.2 Item #5, Exception #2. Ref: exit sign directing into Warehouse 108. - Provide exit signage that leads out through hall between Sprinkler Room and Maintenance/Engineer Room. - Modify plans to show how all exits will have emergency lighting at exterior side of landing per 1008.3.2, item #5.
Misc
Resolved
04/05/2022

Wall Type Detail sheets incomplete. Actions required: - remove notes that indicate "not for construction" - Provide complete details for wall construction.
IPC 604.9 Water hammer
Resolved
04/05/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Remove reference in notes. Ref: P1.0, General Note #14.
NEC Article 210.8 (B) Other than dwelling units GFCI
Resolved
04/05/2022

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in cafe will by GFCI protected.
IBC 502.1 - Address Identification
Resolved
04/05/2022

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Address for this building is 900 NW Blue Pkwy. Please inform your client and update your records.
Licensed Contractors Rejected 04/06/2022 04/05/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/30/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/5/22 - acknowledged in letter
LC - General Contractor
Corrective Action Required
03/30/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 4/5/22 - acknowledged in letter
Fire Plan Review Rejected 03/11/2022 03/13/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/13/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide plans for modification to the sprinkler system to maintain coverage. Confirm the hazard classification for the existing system is appropriate for the commodity on display and stored in the warehouse area.
Address numbers required
Corrective Action Required
03/13/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Shall be posted on all doors. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
03/13/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide plans for modification to the sprinkler system to maintain coverage. Confirm the hazard classification for the existing system is appropriate for the commodity on display and stored in the warehouse area.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/13/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action required- Move fire extinguishers next to the exits and along common travel pathways.
Miscellaneous Correction
Corrective Action Required
03/13/2022

How will materials be stored in the warehouse? Provide a storage plan.
Misc
Corrective Action Required
03/13/2022

[BE] 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. Exceptions: 2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of the following are met: 2.1. The stock is of the same hazard classification as that found in the main retail area. 2.2. Not more than 50 percent of the exit access is through the stockroom. 2.3. The stockroom is not subject to locking from the egress side. 2.4. There is a demarcated, minimum 44- inch-wide (1118 mm) aisle defined by full- or partial-height fixed walls or similar construction that will maintain the required width and lead directly from the retail area to the exit without obstructions. Action required- Indicate how this requirement will be met.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
03/13/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. Action required- The existing fire protection systems shall be operable and have documentation of current inspections. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
03/13/2022

3201.3 Construction documents. At the time of building permit application for new permit application for new structures designed to accommodate high-piled storage or for requesting a change of occupancy/use, and at the time of application for a storage permit, plans and specifications shall be submitted for review and approval. In addition to the information required by the International Building Code, the storage permit submittal shall include the information specified in this section. The construction documents shall include all of the following: 1. Floor plan of the building showing locations and dimensions of high-piled storage areas. 2. Usable storage height for each storage area. 3. Number of tiers within each rack, if applicable. 4. Commodity clearance between top of storage and the sprinkler deflector for each storage arrangement. 5. Aisle dimensions between each storage array. 6. Maximum pile volume for each storage array. 7. Location and classification of commodities in accordance with Section 3203. 8. Location of commodities that are banded or encapsulated. 9. Location of required fire department access doors. 10. Type of fire suppression and fire detection systems. 11. Location of valves controlling the water supply of ceiling and in-rack sprinklers. 12. Type, location and specifications of smoke removal and curtain board systems. 13. Dimension and location of transverse and ongitudinal flue spaces. 14. Additional information regarding required design features, commodities, storage arrangement and fire protection features within the high-piled storage area shall be provided at the time of permit, where required by the fire code official. Action required- Provide information on storage in the warehouse area.
Miscellaneous Correction
Corrective Action Required
03/13/2022

2018 IFC- Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Actions required: - Modify plans to demonstrate how you will comply with 1016.2 Item #5, Exception #2. Ref: exit sign directing into Warehouse 108. - Provide exit signage that leads out through hall between Sprinkler Room and Maintenance/Engineer Room. - Modify plans to show how all exits will have emergency lighting at exterior side of landing per 1008.3.2, item #5.
Building Plan Review Rejected 03/09/2022
Joe Frogge
Final Development Plan
Corrective Action Required
03/09/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
03/09/2022

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
03/09/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
IBC 1013.1 Where required - exit sign
Corrective Action Required
03/09/2022

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Actions required: - Modify plans to demonstrate how you will comply with 1016.2 Item #5, Exception #2. Ref: exit sign directing into Warehouse 108. - Provide exit signage that leads out through hall between Sprinkler Room and Maintenance/Engineer Room. - Modify plans to show how all exits will have emergency lighting at exterior side of landing per 1008.3.2, item #5.
Misc
Corrective Action Required
03/09/2022

Wall Type Detail sheets incomplete. Actions required: - remove nots that indicate "not for construction" - Provide complete details for wall construction.
IPC 604.9 Water hammer
Corrective Action Required
03/09/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Remove reference in notes. Ref: P1.0, General Note #14.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
03/09/2022

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in cafe will by GFCI protected.
IBC 502.1 - Address Identification
Corrective Action Required
03/09/2022

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Address for this building is 900 NW Blue Pkwy. Please inform your client and update your records.
Licensed Contractors Rejected 03/09/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/09/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
03/09/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $9,340.00 $9,340.00 Paid 05/06/2022
$454,845.00
8331507-Sewer Connection Fee $90.00 $90.00 Paid 05/06/2022
7232302-Commercial Excise Tax Fee $227,422.50 $227,422.50 Paid 03/09/2022
$227,422.50
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/08/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 10/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Passed 6/28/2022 6/28/2022 06/28/2022
Underground Plumbing Inspection - Commercial Passed 7/1/2022 7/1/2022 07/01/2022
In-wall Inspection Partial 7/26/2022 7/26/2022 07/26/2022
Misc
Corrective Action Required
07/26/2022
-Northeast corner furout wall ok -Complete electrical at cafe, 128,126 *OK to 1 side
In-wall Inspection Partial 8/4/2022 8/4/2022 08/04/2022
Misc
Corrective Action Required
07/26/2022
-Northeast, northwest, southeast corner fur out walls ok, -Design center ok -Framing above south door ok -Complete electrical at cafe, 128,126
In-wall Inspection Partial 8/15/2022 8/15/2022 08/15/2022
Misc
Corrective Action Required
08/04/2022
-Northeast, northwest, southeast and southwest corner fur out walls ok, -Design center ok -Framing above south door ok -Cafe ok
In-wall Inspection Partial 8/22/2022 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/15/2022
-Northeast, northwest, southeast and southwest corner fur out walls ok, -Design center ok -Framing above south door ok -Cafe ok -Mattress center tower and knee walls ok
Above Ceiling Inspection Partial 8/22/2022 8/22/2022 08/22/2022
Miscellaneous Correction
Informational
08/22/2022
-Cafe hard lids
In-wall Inspection Partial 8/30/2022 08/30/2022
Misc
Corrective Action Required
08/22/2022
-Northeast, northwest, southeast and southwest corner fur out walls ok, -Design center ok -Framing above south door ok -Cafe ok -Mattress center tower and knee walls ok -Divider wall at rug market
Above Ceiling Inspection Partial 08/30/2022
Miscellaneous Correction
Informational
08/22/2022
-Cafe and bathroo hard lids -OK for borders at pantry- provide cover plates at 2 open J boxes
Alarm Test Passed 9/6/2022 09/06/2022
Corrective Action Required
09/06/2022
Strobes need to terminate on silence. Alarm waterflow did not report appropriately. Have alarm company make appropriate changes before final.
Occupancy Inspection - Codes Commercial Failed 9/7/2022 9/7/2022 09/07/2022
Miscellaneous Correction
Corrective Action Required
09/07/2022
LABEL CIRCUIT BREAKERS IN SERVICE PANELS PROVIDE APPROVED COVERS FLOOR RECEPTACLES COMPLETE ALL REQUIRED GFCI RECEPTACLES COMPLETE RECEPTACLES THROUGHOUT LAND ALL CONDUCTORS IN A BOX OR LISTED FIXTURE PROVIDE COVER PLATES FOR SWITCHES & RECEPTACLES
Occupancy Inspection - Fire Temporary C of O 9/7/2022 9/7/2022 09/07/2022
Corrective Action Required
09/07/2022
Alarm system has not been corrected. Okay for TCO with approval from codes.
Above Ceiling Inspection Passed 9/8/2022 09/08/2022
Miscellaneous Correction
Informational
08/30/2022
-Cafe and bathroo hard lids -OK for borders at pantry- provide cover plates at 2 open J boxes
In-wall Inspection Passed 9/8/2022 09/08/2022
Misc
Corrective Action Required
08/30/2022
-Northeast, northwest, southeast and southwest corner fur out walls ok, -Design center ok -Framing above south door ok -Cafe ok -Mattress center tower and knee walls ok -Divider wall at rug market
Occupancy Inspection - Codes Commercial Ready for Temp CO 9/8/2022 9/8/2022 09/08/2022
Miscellaneous Correction
Corrective Action Required
09/07/2022
OK TO STOCK AND TRAIN EMPLOYEES & CONTRACTORS ONLY OBTAIN FULL C of O BEFORE OPENING FOR BUSINESS INSTALL BACKORDERED DOOR AT COFFEE BAR COMPLETE GFCI RECEPTACLES AT COFFEE BAR COUNTERTOP INSTALL WINDOW NEAR LOADING DOCK COMPLETE EXTERIOR NON STRUCTURAL MODIFICATIONS
Occupancy Inspection - Codes Commercial Temporary C of O 9/8/2022 09/08/2022
Miscellaneous Correction
Corrective Action Required
09/08/2022
OK TO STOCK AND TRAIN EMPLOYEES & CONTRACTORS ONLY OBTAIN FULL C of O BEFORE OPENING FOR BUSINESS INSTALL BACKORDERED DOOR AT COFFEE BAR COMPLETE GFCI RECEPTACLES AT COFFEE BAR COUNTERTOP INSTALL WINDOW NEAR LOADING DOCK COMPLETE EXTERIOR NON STRUCTURAL MODIFICATIONS
Occupancy Inspection - Codes Commercial Ready for Temp CO 10/17/2022 10/17/2022
Miscellaneous Correction
Corrective Action Required
09/08/2022
OK TO STOCK AND TRAIN EMPLOYEES & CONTRACTORS ONLY OBTAIN FULL C of O BEFORE OPENING FOR BUSINESS INSTALL BACKORDERED DOOR AT COFFEE BAR INSTALL DISPLAY WINDOW SOUTH OF COFFEE BAR INSTALL WINDOW NEAR LOADING DOCK COMPLETE EXTERIOR NON STRUCTURAL MODIFICATIONS PROVIDE HEALTH DEPT INSPECTION OF CAFE
Occupancy Inspection - Codes Commercial Temporary C of O 11/2/2022 11/03/2022
Miscellaneous Correction
Corrective Action Required
10/17/2022
INSTALL GLASS IN DOOR & WINDOWS AT CAFE INSTALL WINDOW NEAR LOADING DOCK
Occupancy Inspection - Codes Commercial Temporary C of O 11/7/2022 11/07/2022
Miscellaneous Correction
Corrective Action Required
11/03/2022
ADDRESS ALARM SYSTEM WITH FIRE FOR C OF O Alarm system has not been corrected. Okay for TCO with approval from codes. INSTALL BACKORDERED GLASS AT DOORS & WINDOW CAFE INSTALL WINDOW NEAR LOADING DOCK TCO EXPIRES 12/14/2022
Occupancy Inspection - Fire Passed 12/13/2022 12/13/2022 12/13/2022
Occupancy Inspection - Codes Commercial Full C of O 12/13/2022 12/13/2022 12/13/2022
Miscellaneous Correction
Resolved
12/13/2022
ADDRESS ALARM SYSTEM WITH FIRE FOR C OF O Alarm system has not been corrected. Okay for TCO with approval from codes. INSTALL BACKORDERED GLASS AT DOORS & WINDOW CAFE INSTALL WINDOW NEAR LOADING DOCK TCO EXPIRES 12/14/2022
Documents & Images
Date Uploaded File Type Document Name
03/01/2022 Plans 220222 FMOM Combined_signed
03/01/2022 Application Form Permit and License Application 20220223
03/14/2022 Letter DS P/R Corrections Document
03/30/2022 Letter 220314 HIVE City Comment Response
03/30/2022 Plans 220328 FMOM Set_Combined
03/30/2022 Letter 220328 FMOM Narrative
04/05/2022 Email Howdy come in Cafe - jxn cty approval
04/13/2022 Letter DS P/R Corrections Document
04/18/2022 Letter 220418 FMOM Narrative
04/18/2022 Plans 220418 FMOM Set_Combined
04/18/2022 Letter 220418 HIVE City Comment Response
04/25/2022 Approved Plans approved - FMOM Set_Combined
04/27/2022 Letter Fire Building Plan Review
04/27/2022 Letter Fire Building Plan Review
05/06/2022 Receipt Receipt for transaction: 2022-002988
06/15/2022 Letter DS Building Permit
07/01/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter Fire (Alarm) Plan Review Notice
07/21/2022 Letter Fire (Alarm) Plan Review Notice
07/26/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/30/2022 Letter INSPECTION SUMMARY
08/30/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter Fire Loss Reduction Form
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter Fire Loss Reduction Form
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Receipt Receipt for transaction:2022-007395
09/08/2022 Letter Codes Temporary Certificate of Occupancy
10/11/2022 Application Form Temp CO Extension Request Form
10/17/2022 Letter Extension Request Form (004) 900 Blue Pkwy
10/17/2022 Certificate/License Codes Temporary Certificate of Occupancy
10/17/2022 Receipt Receipt for transaction:2022-008305
11/03/2022 Certificate/License Codes Temporary Certificate of Occupancy
11/04/2022 Health Inspection Approval
11/07/2022 Certificate/License Codes Temporary Certificate of Occupancy
12/13/2022 Letter Codes Final Certificate of Occupancy
12/13/2022 Letter Field Certificate of Occupancy
01/02/2024 Codes Temporary Certificate of Occupancy5
01/02/2024 Codes Temporary Certificate of Occupancy112
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home