Permit Application Status

PRCOM20215502


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215502
Building Permit - Commercial
Certificate of Occupancy
CP DEER BROOK PLAZA LLC
CHANGE OF TENANT
TENANT FINISH FOR GARDEN SUPPLY RETAIL
10/20/2021
10/25/2021
04/19/2022
11/03/2021
Locations
Contacts
D.L. Kirby & Company, Address:517 SE 2ND ST STE A, Phone:(816) 365-0605  
LRW PLUMBING LLC, Address:20631 W 319TH ST, Phone:(913) 568-7737  
WESTCO ELECTRICAL SERVICES, Address:P O BOX 93, Phone:(816) 343-8779  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
CL ARCHITECTURE (CRAIG LUEBBERT), Address:396 SW WINTERGARDEN, Phone:(816) 536-3472  
DEAN KIRBY, Address:DKIRBY@DLKIRBY.COM, Phone:(816) 365-0605  
CP DEER BROOK PLAZA LLC, Address:3400 COLLEGE BLVD STE 195  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/29/2021 10/25/2021
Joe Frogge
LC - MEP Subs
Resolved
10/25/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/25/21 - acknowledged in letter
Building Plan Review Approved 10/29/2021 10/25/2021
Joe Frogge
Misc
Resolved
10/25/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/25/21 - acknowledged in letter
IBC 602.1 Type of Construction - general
Resolved
10/25/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is a type 5B. Update Project Code Data.
IPC 403.1 Minimum number of fixtures
Resolved
10/25/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent.
IBC 1209.2 Finish materials
Resolved
10/25/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at water closets. If paint is used it must be epoxy based.
Fire Plan Review Approved with Conditions 10/29/2021 10/22/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/22/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
10/22/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exit doors.
Construction documents - Fire protection systems
Corrective Action Required
10/22/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/22/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 11/01/2021 10/21/2021
Joe Frogge
Misc
Corrective Action Required
10/21/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 602.1 Type of Construction - general
Corrective Action Required
10/21/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is a type 5B. Update Project Code Data.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
10/21/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent.
IBC 1209.2 Finish materials
Corrective Action Required
10/21/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at water closets. If paint is used it must be epoxy based.
Licensed Contractors Rejected 11/01/2021 10/21/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
10/21/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/01/2021 10/20/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/20/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
10/20/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exit doors.
Construction documents - Fire protection systems
Corrective Action Required
10/20/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/20/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $80.00 $80.00 Paid 10/25/2021
7232302-Commercial Excise Tax Fee $6,907.50 $6,907.50 Paid 10/21/2021
$6,907.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 10/26/2021 10/26/2021 10/26/2021
Occupancy Inspection - Codes Commercial Temporary C of O 11/1/2021 11/1/2021 11/01/2021
Misc
Corrective Action Required
11/01/2021
-INSTALL ACCESSIBILITY-COMPLIANT DOOR LOCK FOR RESTROOM THAT DOES NOT REQUIRE TWISTING OF THE WRIST TO LOCK/UNLOCK THE DOOR -PROVIDE GFCI PROTECTION FOR RECEPTACLE LOCATED WITHIN SIX FT OF THE SINK
Occupancy Inspection - Fire Passed 11/1/2021 11/1/2021 11/01/2021
Occupancy Inspection - Codes Commercial Full C of O 11/3/2021 11/3/2021 11/03/2021
Misc
Resolved
11/03/2021
-INSTALL ACCESSIBILITY-COMPLIANT DOOR LOCK FOR RESTROOM THAT DOES NOT REQUIRE TWISTING OF THE WRIST TO LOCK/UNLOCK THE DOOR -PROVIDE GFCI PROTECTION FOR RECEPTACLE LOCATED WITHIN SIX FT OF THE SINK
Documents & Images
Date Uploaded File Type Document Name
10/20/2021 Application Form Commercial Permit Application
10/20/2021 Plans Year-Round Garden [PERMIT SET]
10/20/2021 Letter Fire Building Plan Review
10/21/2021 Letter License Tax Bill
10/21/2021 Letter DS P/R Corrections Document
10/22/2021 Letter City Responses
10/22/2021 Plans Year-Round Garden [PERMIT SET]
10/22/2021 Letter Fire Building Plan Review
10/25/2021 Approved Plans approved - Year-Round Garden [PERMIT SET]0
10/25/2021 Application Form Craig Lubbert-Commercial Permit Application
10/25/2021 Application Form Craig Lubbert-License_Tax_Application
10/25/2021 Receipt Receipt for transaction:2021-008211
10/25/2021 Letter DS Building Permit
10/26/2021 Letter INSPECTION SUMMARY
11/01/2021 Letter Codes Temporary Certificate of Occupancy
11/01/2021 Letter Fire Loss Reduction Form
11/03/2021 Letter Codes Final Certificate of Occupancy
11/11/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home