Permit Application Status

PRCOM20215409


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215409
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
TENANT FINISH FOR NEW RESTAURANT
10/18/2021
01/26/2022
04/19/2022
08/12/2022
Locations
Contacts
SALES@WEDOTHATKC.COM  
DIVERSIFIED INC, Address:22052 W 66TH ST SUITE 205, Phone:(913) 735-3776  
J & S PLUMBING PROS LLC, Address:116 S WESTGLEN DR, Phone:(816) 215-5306  
SULLIVAN PALMER ARCHITECTS, Address:8849 LONG, Phone:(913) 888-8540  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
ASAP ELECTRIC INC, Address:P O BOX 860225, Phone:(913) 745-5558  
ROGELIO MENDIOLA, Address:6205 E 137TH ST, Phone:(816) 830-0575  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 07/19/2022 07/19/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
07/19/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Received 7/18./2022.
Installation acceptance testing
Corrective Action Required
07/19/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call 916.969.1300 to schedule a test.
Miscellaneous Correction
Corrective Action Required
07/19/2022

Remove the pull station in the corner behind the the table and switch the horn/strobe in the bathroom to a strobe only.
Licensed Contractors Approved 10/29/2021 01/26/2022
Joe Frogge
LC - General Contractor
Resolved
01/26/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/22/21 - acknowledged in letter
LC - MEP Subs
Resolved
01/26/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/22/21 - acknowledged in letter
Sprinkler Plan Review Released for Construction 01/11/2022 01/11/2022
Jim Eden
Installation acceptance testing
Corrective Action Required
01/11/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the alarm test.
Building Plan Review Approved with Conditions 10/29/2021 10/22/2021
Joe Frogge
Miscellaneous Correction
Resolved
10/22/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/22/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 10/22/21 - acknowledged in letter
IBC 602.1 Type of Construction - general
Resolved
10/22/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This portion of the building is 5A. Update Code Items.
IBC 1013.1 Where required - exit sign
Resolved
10/22/2021

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide additional exit signage in dining area to lead occupants to 2nd exit.
Fire Plan Review Approved with Conditions 10/29/2021 10/22/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
10/22/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 62.
Construction documents for fire alarm systems
Corrective Action Required
10/22/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
10/22/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/22/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm and hood testing.
Health Department Review Approved 10/22/2021
Joe Frogge
Building Plan Review Rejected 10/28/2021 10/21/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/21/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Health Dept Review
Resolved
10/22/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/21/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
IBC 602.1 Type of Construction - general
Corrective Action Required
10/21/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This portion of the building is 5A. Update Code Items.
IBC 1013.1 Where required - exit sign
Corrective Action Required
10/21/2021

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide additional exit signage in dining area to lead occupants to 2nd exit.
Licensed Contractors Rejected 10/28/2021 10/21/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
10/21/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/21/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/28/2021 10/19/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
10/19/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 62.
Construction documents for fire alarm systems
Corrective Action Required
10/19/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
10/19/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/19/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm and hood testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,188.00 $1,188.00 Paid 01/26/2022
8331507-Sewer Connection Fee $300.00 $300.00 Paid 01/26/2022
7232302-Commercial License Tax Fee $10,185.00 $10,185.00 Paid 01/26/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/26/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/26/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/02/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $150.00 $150.00 Paid 08/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 1/27/2022 1/27/2022 01/27/2022
Misc
Corrective Action Required
01/27/2022
-Provide city approved, stamped plans for inspection -Seal all through floor penetrations with appropriate fire stopping matearial -Repair all fireproofing to structural members -Provide bocca plates at bottom track at dwv -Midpoint strap at 2" dwv in bathroom -Install missing track at bathroom -Have engineer address holes in structural slab
In-wall Inspection Not Ready 2/4/2022 2/4/2022 02/04/2022
Misc
Corrective Action Required
01/27/2022
-Provide city approved, stamped plans for inspection -Seal all through floor penetrations with appropriate fire stopping matearial -Repair all fireproofing to structural members -Provide bocca plates at bottom track at dwv -Midpoint strap at 2" dwv in bathroom -Install missing track at bathroom -Have engineer address holes in structural slab - Provide access panel gas shutoff south wall
In-wall Inspection Not Ready 2/10/2022 2/10/2022 02/10/2022
Misc
Corrective Action Required
02/04/2022
-Provide city approved, stamped plans for inspection -Seal all through floor penetrations with approved material -Repair all fireproofing to structural members ( chase at restroom) -Provide bocca plates at bottom track at dwv ( 2" above bottom plate ) -Midpoint strap at 2" & smaller vertical dwv in bathroom -Have engineer address holes in structural slab ( upload report to permit ) - Provide access panel gas shutoff south wall
In-wall Inspection Partial 2/15/2022 2/15/2022 02/15/2022
Misc
Corrective Action Required
02/10/2022
-Seal all through floor penetrations ( floor sinks & floor drains ) with approved material - Provide access panel gas shutoff south wall near floor sink : OK TO SHEETROCK :
Hood/Duct Inspection Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/13/2022
WELDS APPROVED FOR 1ST LAYER WRAP
Hood/Duct Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/13/2022
WELDS APPROVED FOR 1ST LAYER WRAP 1ST LAYER APPROVED
Above Ceiling Inspection Failed 7/8/2022 7/8/2022 07/08/2022
Miscellaneous Correction
Corrective Action Required
07/08/2022
-ADDRESS IN WALL INSPECTION ITEMS NOT COMPLETED -ADDRESS HOOD INSPECTION NOT COMPLETED -COMPLETE ELECTRICAL AT DINING -REMOVE SHEET ROCK AT HARD LIDS-NO INSPECTION WAS PERFORMED ON CEILINGS -REMOVE ALL CEILING TILE FOR INSPECTION- NO TILE IS APPROVED
Above Ceiling Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Miscellaneous Correction
Corrective Action Required
07/08/2022
Vent bath fans Connect heat ducts over bathroom Support all mc over bath rooms Hood missing wrap-Provide detail for hood, wrap and banding Provide plans Product installed in space prior to approval. Missing heat ducts over kitchen area. Repair all damaged fireproofing at structural steel Missing knock out in 4x4 box right of 3 compartment sink above ceiling. Support all low voltage above ceiling throughout. Cut drains above floor sinks. Provide gas test. And gas piping inspection. Provide access to gas valve behind soda machine south wall. Provide Identification (stencil) at fire walls per code Support and secure all electrical and low votage at dining hard lid Missing knock out in j box at kitchen and dining hard lid Provide screening at CO2 tank at exterior
Gas Service Inspection - Commercial Passed 7/14/2022 07/14/2022
Above Ceiling Inspection Failed 7/15/2022 7/15/2022 07/15/2022
Miscellaneous Correction
Corrective Action Required
07/12/2022
-Hood-Provide detail for hood, wrap and banding -Provide plans -Product installed in space prior to approval. -Missing heat ducts over kitchen area. -Repair all damaged fireproofing at structural steel-missing above hood, -Provide certification that fireproofing is installed to proper thickness -Open j boxes at hood -Remove tape from sprinkler head at back hall -Cut drains above floor sinks. -Provide access to gas valve behind soda machine south wall. -Provide Identification (stencil) at fire walls per code -Missing knock out in j box at dining hard lid -Provide screening at CO2 tank at exterior
Above Ceiling Inspection Partial 7/18/2022 7/18/2022 07/18/2022
Miscellaneous Correction
Corrective Action Required
07/15/2022
ok to install ceiling tiles. below can be chaed at final. -Provide certification that fireproofing is installed to proper thickness , pending letter . -Provide Identification (stencil) at fire walls per code -Provide screening at CO2 tank at exterior
In-wall Inspection Passed 07/27/2022
Misc
Resolved
07/27/2022
-Seal all through floor penetrations ( floor sinks & floor drains ) with approved material - Provide access panel gas shutoff south wall near floor sink
Above Ceiling Inspection Passed 07/27/2022
Miscellaneous Correction
Resolved
07/27/2022
ok to install ceiling tiles. below can be chaed at final. -Provide certification that fireproofing is installed to proper thickness , pending letter . -Provide Identification (stencil) at fire walls per code -Provide screening at CO2 tank at exterior
Occupancy Inspection - Codes Commercial Failed 7/27/2022 7/27/2022 07/27/2022
Miscellaneous Correction
Corrective Action Required
07/27/2022
-Upload Health Department report to portal -Provide certification that fireproofing is installed to proper thickness-obtain letter and upload to portal -Provide screening at CO2 tank at exterior to conceal tank -Seal all through floor penetrations ( floor sinks & floor drains ) with approved material-per UL1479 and ASTM E84 -Cut drain pipes to 1” above flood level rim -Label panel, complete panel schedule -Secure water line feeding ice machine -Provide backflow device for carbonated beverage dispenser use ASSE 1022 -Provide plumbing protection at sink per IPC 404.3 -Provide GFCI Protection at all kitchen receptacles -Accessible toilets to be max 16-18” to center from side wall
Occupancy Inspection - Planning Temporary C of O 7/27/2022 07/27/2022
Corrective Action Required
07/27/2022
EXTERIOR EQUIPMENT SCREENING. To meet the requirements of the Unified Development Ordinance, the CO2 container housed on the exterior of the building shall be fully screened from view up the height of said container using either of the following screening options: 1) masonry walls (of a color compatible to the building); or 2) evergreen shrubs.
Occupancy Inspection - Codes Commercial Failed 7/29/2022 7/29/2022 07/29/2022
Miscellaneous Correction
Corrective Action Required
07/27/2022
-Upload Health Department report to portal -Provide certification that fireproofing is installed to proper thickness-obtain letter and upload to portal -Provide screening at CO2 tank at exterior to conceal tank -Seal all through floor penetrations ( floor sinks & floor drains ) with approved material-per UL1479 and ASTM E84 -Cut drain pipes to 1” above flood level rim -Label panel, complete panel schedule -Secure water line feeding ice machine -Provide backflow device for carbonated beverage dispenser use ASSE 1022 -Provide plumbing protection at sink per IPC 404.3 -Provide GFCI Protection at all kitchen receptacles -Accessible toilets to be max 16-18” to center from side wall
Misc
Corrective Action Required
07/29/2022
locked no answer and no lock box code
Occupancy Inspection - Codes Commercial Failed 8/1/2022 8/1/2022 08/01/2022
Miscellaneous Correction
Corrective Action Required
07/29/2022
-Upload Health Department report to portal -Provide certification that fireproofing is installed per instructions and to proper thickness-obtain letter and upload to portal -Provide screening at CO2 tank at exterior to conceal tank -Seal all through floor penetrations ( floor sinks & floor drains ) with approved material-per UL1479 and ASTM E84 -Label panel, complete panel schedule -Provide plumbing protection at sink per IPC 404.3
Misc
Informational
08/01/2022
EXTERIOR EQUIPMENT SCREENING. To meet the requirements of the Unified Development Ordinance, the CO2 container housed on the exterior of the building shall be fully screened from view up the height of said container using either of the following screening options: 1) masonry walls (of a color compatible to the building); or 2) evergreen shrubs.
Occupancy Inspection - Codes Commercial Ready for Temp CO 8/2/2022 8/2/2022 08/02/2022
Miscellaneous Correction
Corrective Action Required
08/01/2022
OK For TCO -Upload Health Department report to portal -Provide certification that fireproofing is installed per instructions and to proper thickness-obtain letter and upload to portal
Misc
Resolved
08/02/2022
EXTERIOR EQUIPMENT SCREENING. To meet the requirements of the Unified Development Ordinance, the CO2 container housed on the exterior of the building shall be fully screened from view up the height of said container using either of the following screening options: 1) masonry walls (of a color compatible to the building); or 2) evergreen shrubs.
Occupancy Inspection - Codes Commercial Temporary C of O 08/02/2022
Miscellaneous Correction
Corrective Action Required
08/02/2022
OK For TCO -Provide certification that fireproofing is installed per instructions and to proper thickness-obtain letter and upload to portal
Occupancy Inspection - Codes Commercial Full C of O 08/12/2022
Miscellaneous Correction
Resolved
08/12/2022
OK For TCO -Provide certification that fireproofing is installed per instructions and to proper thickness-obtain letter and upload to portal
Documents & Images
Date Uploaded File Type Document Name
10/18/2021 Application Form Lee's Summit_Comm Permit Application
10/18/2021 Plans Twisted Fresh_10-18-21
10/18/2021 Plans CaptiveAire_DSIZE-Master-TwistedFresh-SummitAtPryor_10-11-21
10/19/2021 Letter Fire Building Plan Review
10/21/2021 Letter DS P/R Corrections Document
10/22/2021 Email New Food Establishment Plan Review - Approved FTG_0001834
10/22/2021 Letter Re-Submittal_Twisted Fresh_10-22-21
10/22/2021 Plans Twisted Fresh_10-22-21
10/22/2021 Letter Fire Building Plan Review
10/22/2021 Application Form License Tax Application_1
10/22/2021 Application Form License Tax Application_2
10/22/2021 Application Form License Tax Application_3
10/22/2021 Approved Plans approved - Twisted Fresh_10-22-21
01/11/2022 Letter Fire (Sprinkler) Plan Review
01/24/2022 Application Form app from builder
01/26/2022 Receipt Receipt for transaction: 2022-000468
01/26/2022 Letter DS Building Permit
01/26/2022 Letter License Tax Bill
01/27/2022 Letter INSPECTION SUMMARY
02/04/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/10/2022 TRI1806-L020422AR1
02/15/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
07/08/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/13/2022 Approved Plans approved - CaptiveAire_DSIZE-Master-TwistedFresh-SummitAtPryor_10-11-21
07/14/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/19/2022 Twisted Fresh FA 7 14 22 PE Stamp
07/19/2022 Twisted Fresh FA Calc PE Stamp
07/19/2022 Letter Fire (Alarm) Plan Review Notice
07/26/2022 Receipt Receipt for transaction:2022-006112
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
07/29/2022 UL Patching Guidelines for CAFCO SFRMs - 2015
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 39177
08/02/2022 39175 (1)
08/02/2022 3RD Party Insp Report Health Department 39173
08/02/2022 Receipt Receipt for transaction:2022-006323
08/02/2022 Letter Codes Temporary Certificate of Occupancy
08/10/2022 Installtec - Twisted Fresh FP Patching - 05AUG2022 (1)
08/12/2022 Receipt Receipt for transaction:2022-006644
08/12/2022 Letter Codes Final Certificate of Occupancy
08/12/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home