Summary
PRCOM20210580
Building Permit - Commercial
Certificate of Occupancy
QUARTER KING LLC
CHANGE OF TENANT
TENANT FINISH FOR FULL SERVICE LAUNDROMAT
02/11/2021
03/17/2021
08/18/2021
04/14/2022
Locations
Contacts
HEATING AND COOLING SERVICE CO, Address:231 SOUTH HUDSON STREET, Phone:(816) 650-3691  
BRENT STONE, Address:613 SW CROSS, Phone:(816) 456-9502  
ALL ABOUT PLUMBING LLC , Address:504 SE DOUGLAS ST , Phone:(816) 877-3949  
Van Deurzen and Associates, Address:11011 King Street, Suite 130, Phone:(913) 451-6305  
QUARTER KING LLC, Address:410 SW 7 HWY  
ed@qkigroup.com, Address:ed@qkigroup.com  
WAHL CONSTRUCTION CO LLC, Address:103 W 26TH AVE STE 240, Phone:(816) 918-2376  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/19/2021 03/17/2021
Joe Frogge
LC - General Contractor
Resolved
03/15/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Resolved
03/17/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/17/21 - The Heating and Cooling Company does not have a LS license
Building Plan Review Approved with Conditions 03/19/2021 03/17/2021
Joe Frogge
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
03/15/2021

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" at latch side of door 107 out of Change Room. (persons with disabilities must be able to approach, enter, and leave all areas not exempted by IBC 1103.2)
Planning - Screening of ground mounted equipment
Corrective Action Required
03/12/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (this applies to all 3 new RTU equipment - unable to locate information for "new screening fence" at the 2 under the new roof) 3/17/21 - HVAC equipment must be installed per manufacturer's written instructions and this screening very likely conflicts with minimum operating and maintenance clearances. Planning Department’s approval is for a structure extending 7' north of building. To be field verified.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
03/15/2021

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience outlets near new mechanical equipment.
IMC 606.2.1 Duct detector
Resolved
03/15/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide duct mounted smoke detectors at new RTU equipment.
Misc
Resolved
03/17/2021

Comments from Planning Department. • The trash enclosure doors shown on Sheet A1 indicate that they are wood. To comply with City ordinance, the doors shall be solid steel opaque gates painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. • No detail is provided on the proposed mechanical unit fencing type. Is the intent to simply secure the area or to both secure and screen the mechanical equipment from view? If visual screening is one of the intents, the City does not allow chain link with slats as a means of screening. Acceptable visual screening includes evergreen landscaping (which isn’t feasible in this instance), masonry walls and vinyl fencing. • Is the asphalt replacement off the southwest building corner a surface course repair or is it a full depth removal and replacement due to pavement failure? If the latter, the reconstruction of the parking lot asphalt must comply with the pavement design standard outlined under UDO Section 8.620.F.1. Action required: Modify designs to address all 3 bullet points. (Contact Hector Soto with Planning Dept with any questions. 816.969.1600)
Misc
Resolved
03/15/2021

Comment from Public Works. - As far as the new sewer connection is concerned, a new cut-in wye connection is required, and must meet the standards set forth by our standard drawing. Tees are not allowed, only wyes. Tracer wire and a box must also be installed for this new service from the main to the tracer wire box, in accordance with City standards. I have attached a copy of the standard drawing for the new connection. The tracer wire box should be shown just beyond the property line, within one (1) foot of same. Action required: Modify designs to address sewer main connection requirements. (contact Gene Williams with Public Works at 816.969.1800 with any questions)
Misc
Resolved
03/16/2021

Comment from Public Works. - Sewer piping & stubs not allowed to be abandoned in place. Action required: Modify design to indicate proper removal of sewer piping. Coordinate with Water Department as they oversee service removals. 816.969.1900.
Fire Plan Review Approved with Conditions 03/19/2021 03/15/2021
Michael Weissenbach
Address numbers required
Corrective Action Required
03/12/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Building Plan Review Rejected 02/24/2021 02/19/2021
Joe Frogge
Miscellaneous Correction
Resolved
03/10/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 2902.3 Employee and public toilet facilities - access to public toilet
Resolved
02/22/2021

2018 IBC 2902.3 Employee and public toilet facilities. For structures and tenant spaces intended for public utilization, customers, patrons and visitors shall be provided with public toilet facilities. Employees associated with structures and tenant spaces shall be provided with toilet facilities. The number of plumbing fixtures located within the required toilet facilities shall be provided in accordance with Section 2902 for all users. Employee toilet facilities shall be either separate or combined employee and public toilet facilities. Exception: Public toilet facilities shall not be required for: 1. Parking garages where operated without parking attendants. 2. Structures and tenant spaces intended for quick transactions, including takeout, pickup and drop-off, having a public access area less than or equal to 300 square feet. Action required: Public must have access to all of the minimum number of plumbing fixtures. (note from commentary: "If the toilet facilities are located in restricted areas, public toilet facilities must be provided outside of those business-imposed restricted areas.")
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
02/17/2021

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" at latch side of door 107 out of Change Room. (persons with disabilities must be able to approach, enter, and leave all areas not exempted by IBC 1103.2)
Planning - Screening of ground mounted equipment
Corrective Action Required
02/17/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (this applies to all 3 new RTU equipment - unable to locate information for "new screening fence" at the 2 under the new roof)
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
02/17/2021

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience outlets near new mechanical equipment.
IMC 606.2.1 Duct detector
Corrective Action Required
02/17/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide duct mounted smoke detectors at new RTU equipment.
Misc
Corrective Action Required
02/19/2021

Comments from Planning Department. • The trash enclosure doors shown on Sheet A1 indicate that they are wood. To comply with City ordinance, the doors shall be solid steel opaque gates painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. • No detail is provided on the proposed mechanical unit fencing type. Is the intent to simply secure the area or to both secure and screen the mechanical equipment from view? If visual screening is one of the intents, the City does not allow chain link with slats as a means of screening. Acceptable visual screening includes evergreen landscaping (which isn’t feasible in this instance), masonry walls and vinyl fencing. • Is the asphalt replacement off the southwest building corner a surface course repair or is it a full depth removal and replacement due to pavement failure? If the latter, the reconstruction of the parking lot asphalt must comply with the pavement design standard outlined under UDO Section 8.620.F.1. Action required: Modify designs to address all 3 bullet points. (Contact Hector Soto with Planning Dept with any questions. 816.969.1600)
Misc
Corrective Action Required
02/19/2021

Comment from Public Works. - As far as the new sewer connection is concerned, a new cut-in wye connection is required, and must meet the standards set forth by our standard drawing. Tees are not allowed, only wyes. Tracer wire and a box must also be installed for this new service from the main to the tracer wire box, in accordance with City standards. I have attached a copy of the standard drawing for the new connection. The tracer wire box should be shown just beyond the property line, within one (1) foot of same. Action required: Modify designs to address sewer main connection requirements. (contact Gene Williams with Public Works at 816.969.1800 with any questions)
Misc
Corrective Action Required
02/19/2021

Comment from Public Works. - Sewer piping & stubs not allowed to be abandoned in place. Action required: Modify design to indicate proper removal of sewer piping. Coordinate with Water Department as they oversee service removals. 816.969.1900.
Licensed Contractors Rejected 02/24/2021 02/17/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
02/17/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
02/17/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 02/24/2021 02/12/2021
Michael Weissenbach
Address numbers required
Corrective Action Required
02/12/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $800.00 $800.00 Paid 03/17/2021
$0.00
8331507-Sewer Connection Fee $1,500.00 $1,500.00 Paid 03/17/2021
Commercial Excise Tax Fee $26,332.50 $26,332.50 Paid 02/17/2021
$26,332.50
Right of Way Permit Fee $80.00 $80.00 Paid 03/17/2021
Water Tap Fee $11,936.00 $11,936.00 Paid 04/27/2021
Water Meter Fee $2,401.70 $2,401.70 Paid 04/27/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Failed 3/25/2021 (8:00) 3/25/2021 03/25/2021
Miscellaneous Correction
Corrective Action Required
03/25/2021
-Provide approved, city stamped plans on site -Pads to be 4'x1' per plans -Provide proper clearance for rebar mats -Clean loose debris from pads
Piers/Caissons Inspection - Commercial Partial 3/26/2021 (8:00) 3/26/2021 03/26/2021
Miscellaneous Correction
Resolved
03/26/2021
-Provide approved, city stamped plans on site -Pads to be 4'x1' per plans -Provide proper clearance for rebar mats -Clean loose debris from pads
Electrical Service Inspection Failed 4/30/2021 4/30/2021 04/30/2021
Miscellaneous Correction
Corrective Action Required
04/30/2021
-Provide inter system bonding terminal -Connect third ground rod and land 3/0 gec at disconnect
Electrical Service Inspection Passed 5/3/2021 5/3/2021 05/03/2021
Miscellaneous Correction
Resolved
05/03/2021
-Provide inter system bonding terminal -Connect third ground rod and land 3/0 gec at disconnect
Water Service Inspection Partial 5/14/2021 05/14/2021
Misc
Corrective Action Required
05/14/2021
5-14-21 2:15pm The contractor has installed the copper water line from the meter under the road and switched over to Polly. They repaired the exisiting water line that was damaged while digging.
Underslab Plumbing Inspection - Commercial Partial 5/17/2021 5/17/2021 05/17/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/17/2021
OK TO COVER -Washer tubs, restrooms, drop off area
Underslab Electrical Inspection - Commercial Partial 5/19/2021 5/19/2021 05/18/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/18/2021
-underslab conduit complete except for site lighting entering west side of building to house panel
Underslab Plumbing Inspection - Commercial Passed 5/18/2021 5/18/2021 05/18/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/17/2021
OK TO COVER -Washer tubs, restrooms, drop off area, janitor's closet
Footing Inspection - Commercial Partial 6/3/2021 (8:00) 6/3/2021 06/03/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
06/03/2021
ISO PADS FOR COLUMNS AT EXTERIOR
Site Visit Partial 6/4/2021 06/04/2021
Misc
Informational
06/04/2021
6-4-21 9:16am There is no work taking place at this time.
Site Visit Partial 6/7/2021 06/07/2021
Misc
Informational
06/04/2021
6-4-21 9:16am There is no work taking place at this time. 6-7-21 1:57pm I spoke with the contractor and he is planning on starting the sanitary service line next week.
Site Visit Partial 6/16/2021 6/16/2021 06/16/2021
Misc
Informational
06/07/2021
6-4-21 9:16am There is no work taking place at this time. 6-7-21 1:57pm I spoke with the contractor and he is planning on starting the sanitary service line next week. 6-16-21 9:40am 85 degrees. They have not started any work on the sanitary.
Sewer Service Inspection Partial 6/24/2021 6/24/2021 06/24/2021
Misc
Informational
06/24/2021
6-24-21 3:07pm They have installed approximately 80’ of service line. It will be pulled out to get proper grade.
Sewer Service Inspection Partial 7/2/2021 07/02/2021
Misc
Informational
06/24/2021
6-24-21 3:07pm They have installed approximately 80’ of service line. It will be pulled out to get proper grade. 6-25-21 4pm They have installed the service line and made the tie-in to the main with a wye. They have tracer wire and backfilled with plenty of rock. They are going to pour a trench check on Saturday. 7-2-21 9:30am The trench for the sanitary line is full of water. I can not inspect the trench check at this time.
Site Visit Partial 7/8/2021 7/8/2021 07/08/2021
Misc
Informational
06/16/2021
6-4-21 9:16am There is no work taking place at this time. 6-7-21 1:57pm I spoke with the contractor and he is planning on starting the sanitary service line next week. 6-16-21 9:40am 85 degrees. They have not started any work on the sanitary. 7-8-21 2:54pm They have the sanitary service line compete. There are no inspections needed today.
In-wall Inspection Partial 7/22/2021 7/22/2021 07/22/2021
Misc
Corrective Action Required
07/22/2021
-7-22-21 Met with owner to discuss gameplan going forward. He is changing his plans and adding spray foam inuslation to roof and re roofing entire structure. Recommended that he submit changes for foam insulation and possible fire resistance rrequirements for approval
Above Ceiling Inspection Failed 8/13/2021 8/13/2021 08/13/2021
Misc
Corrective Action Required
04/30/2021
-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Complete DWV -Complete mechanical -Provide draftstopping at max 3000 square feet
In-wall Inspection Partial 9/8/2021 8/13/2021 08/13/2021
Misc
Informational
08/13/2021
OK to rock exterior walls only
Misc
Corrective Action Required
08/13/2021
-Complete bathroom framing and in wall
Above Ceiling Inspection Partial 8/20/2021 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/13/2021
-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -OK to rock trusses
In-wall Inspection Failed 9/10/2021 9/10/2021 09/10/2021
Misc
Informational
08/13/2021
OK to rock exterior walls Ok to rock storage walls
Misc
Corrective Action Required
08/13/2021
-Provide bocca plate at dwv in bathroom bottom track -Protection plate at electrical in bathroom bottom track -Provide grommets at pex lines through studs
In-wall Inspection Passed 9/14/2021 9/14/2021 09/14/2021
Misc
Resolved
09/14/2021
OK to rock exterior walls Ok to rock storage walls
Misc
Resolved
09/14/2021
-Provide bocca plate at dwv in bathroom bottom track -Protection plate at electrical in bathroom bottom track -Provide grommets at pex lines through studs
Sidewalk Inspection Passed 9/16/2021 09/24/2021
Misc
Informational
09/24/2021
9/24/21 Friday Sidewalks passed final inspection.
Pavement-Surface Passed 9/24/2021 09/24/2021
Misc
Informational
09/24/2021
9/24/21 Friday Newland Asphalt Contractor paved with a commercial surface asphalt Product: 219, Mix Code 219 P.O. from J.M. Fahey. Approximately 550 ton of asphalt was installed.
Above Ceiling Inspection Failed 11/30/2021 11/30/2021
Misc
Corrective Action Required
08/20/2021
-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Install (2) tie wires at opposite corners on all light fixtures-south row and bathroom -Sheet rock and seal gaps between HVAC in mechanical room -Perform gas pressure test
Underslab Electrical Inspection - Commercial Passed 11/30/2021 11/30/2021
THE FOLLOWING AREAS ARE APPROVED
Resolved
11/30/2021
-underslab conduit complete except for site lighting entering west side of building to house panel
Footing Inspection - Commercial Passed 11/30/2021 11/30/2021
THE FOLLOWING AREAS ARE APPROVED
Resolved
11/30/2021
ISO PADS FOR COLUMNS AT EXTERIOR
Above Ceiling Inspection Partial 12/3/2021 12/3/2021 12/03/2021
Misc
Corrective Action Required
11/30/2021
-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Seal gaps between HVAC in mechanical room sheet rock *OK FOR TILE
Gas Piping Inspection - Commercial Passed 12/7/2021 12/7/2021 12/07/2021
Occupancy Inspection - Water Utilities Passed 12/28/2021 12/28/2021
Occupancy Inspection - Planning Temporary C of O 12/29/2021 12/29/2021
Misc
Corrective Action Required
12/29/2021
All three ADA parking spaces require that signs be posted at the head of each space. The signs shall be mounted a minimum 5’ above grade, measured to the bottom of the signs.
Misc
Corrective Action Required
12/29/2021
The trash enclosure gate frames are installed but are not finished. The gates shall have an opaque solid steel exterior, painted to be compatible with the building, to shield the dumpster from view.
Water Service Inspection Passed 12/29/2021 12/29/2021
Misc
Corrective Action Required
05/14/2021
5-14-21 2:15pm The contractor has installed the copper water line from the meter under the road and switched over to Polly. They repaired the exisiting water line that was damaged while digging.
Sewer Service Inspection Passed 12/29/2021 12/29/2021
Misc
Informational
07/02/2021
6-24-21 3:07pm They have installed approximately 80’ of service line. It will be pulled out to get proper grade. 6-25-21 4pm They have installed the service line and made the tie-in to the main with a wye. They have tracer wire and backfilled with plenty of rock. They are going to pour a trench check on Saturday. 7-2-21 9:30am The trench for the sanitary line is full of water. I can not inspect the trench check at this time.
Pavement-Surface Passed 12/29/2021 12/29/2021
Misc
Informational
09/24/2021
9/24/21 Friday Newland Asphalt Contractor paved with a commercial surface asphalt Product: 219, Mix Code 219 P.O. from J.M. Fahey
Occupancy Inspection - Codes Commercial Temporary C of O 12/29/2021 12/29/2021 12/29/2021
Misc
Corrective Action Required
12/29/2021
-Approval required from Planning -Above-ceiling not inspected -Provide ADA compliant grab bars in restroom. Mirror, if installed, must be within 40” of floor -Install signage for all restrooms -Label all breakers at MDP. Make sure outdoor mechanical unit breakers are sized per labels -Ground the electrical service to water (3/0 copper); install bonding jumper (3/0 copper) across the backflow valve. If the underground copper water service line is less than ten ft, bonding of the building copper water line is still required
Occupancy Inspection - Engineering Passed 12/29/2021 12/29/2021
Occupancy Inspection - Fire Temporary C of O 12/29/2021 12/29/2021 12/29/2021
Occupancy Inspection - Codes Commercial Temporary C of O 1/20/2022 01/20/2022
Misc
Corrective Action Required
12/29/2021
-Approval required from Planning -Above-ceiling not inspected -Provide ADA compliant grab bars in restroom. Mirror, if installed, must be within 40” of floor -Install signage for all restrooms -Label all breakers at MDP. Make sure outdoor mechanical unit breakers are sized per labels -Ground the electrical service to water (3/0 copper); install bonding jumper (3/0 copper) across the backflow valve. If the underground copper water service line is less than ten ft, bonding of the building copper water line is still required
Occupancy Inspection - Codes Commercial Temporary C of O 2/23/2022 02/23/2022
Misc
Corrective Action Required
01/20/2022
-Approval required from Planning -Above-ceiling not inspected -Provide ADA compliant grab bars in restroom. Mirror, if installed, must be within 40” of floor -Install signage for all restrooms -Label all breakers at MDP. Make sure outdoor mechanical unit breakers are sized per labels -Ground the electrical service to water (3/0 copper); install bonding jumper (3/0 copper) across the backflow valve. If the underground copper water service line is less than ten ft, bonding of the building copper water line is still required
Occupancy Inspection - Codes Commercial Temporary C of O 2/23/2022 02/24/2022
Misc
Corrective Action Required
02/23/2022
-Approval required from Planning -Above-ceiling not inspected -Provide ADA compliant grab bars in restroom. Mirror, if installed, must be within 40” of floor -Install signage for all restrooms -Label all breakers at MDP. Make sure outdoor mechanical unit breakers are sized per labels -Ground the electrical service to water (3/0 copper); install bonding jumper (3/0 copper) across the backflow valve. If the underground copper water service line is less than ten ft, bonding of the building copper water line is still required
Misc
Corrective Action Required
02/24/2022
NOTE FROM ABOVE CEILING MOVED TO FINAL-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Seal gaps between HVAC in mechanical room sheet rock *OK FOR TILE
Above Ceiling Inspection Passed 2/24/2022 02/24/2022
Misc
Resolved
02/24/2022
-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Seal gaps between HVAC in mechanical room sheet rock *OK FOR TILE
Occupancy Inspection - Planning Passed 03/21/2022
Misc
Corrective Action Required
12/29/2021
All three ADA parking spaces require that signs be posted at the head of each space. The signs shall be mounted a minimum 5’ above grade, measured to the bottom of the signs.
Misc
Corrective Action Required
12/29/2021
The trash enclosure gate frames are installed but are not finished. The gates shall have an opaque solid steel exterior, painted to be compatible with the building, to shield the dumpster from view.
Occupancy Inspection - Codes Commercial Temporary C of O 3/21/2022 3/21/2022 03/21/2022
Misc
Corrective Action Required
02/24/2022
-Label all breakers at MDP, label all panels and equipment.
Misc
Resolved
03/21/2022
NOTE FROM ABOVE CEILING MOVED TO FINAL-Provide fire proof shield or proper 3' clearance to ceiling at MDP per manufacturer -Seal gaps between HVAC in mechanical room sheet rock *OK FOR TILE
Occupancy Inspection - Fire Passed 3/21/2022 03/21/2022
Occupancy Inspection - Codes Commercial Full C of O 4/14/2022 4/14/2022 04/14/2022
Misc
Resolved
04/14/2022
-Label all breakers at MDP, label all panels and equipment.
Documents & Images
Date Uploaded File Type Document Name
02/11/2021 Application Form Wash House Laundry_Completed Permit Application_2-11-21
02/11/2021 Plans 711 SE 291 HWY_PERMIT_2-11-21
02/12/2021 Letter Fire Building Plan Review
02/17/2021 Email lt info
02/19/2021 Email no FDP
02/19/2021 Letter DS P/R Corrections Document
03/10/2021 Application Form lt form
03/12/2021 Plans 711 SE 291 HWY_REVISED_3-12-21
03/15/2021 Letter Fire Building Plan Review
03/17/2021 Email RE more on screening - PRCOM20210580
03/17/2021 Email RE more on screening - PRCOM20210580
03/17/2021 Receipt Receipt for transaction:2021-001346
03/17/2021 Letter DS Building Permit
03/22/2021 Approved Plans approved - 711 SE 291 HWY_REVISED_3-12-21
03/25/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
04/27/2021 Receipt Receipt for transaction:2021-002277
04/30/2021 Letter INSPECTION SUMMARY
05/03/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter Inspection Summary
05/17/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter License Tax Bill
06/07/2021 Letter INSPECTION SUMMARY
06/16/2021 Letter INSPECTION SUMMARY
06/24/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
07/08/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter INSPECTION SUMMARY
08/13/2021 Letter INSPECTION SUMMARY
08/13/2021 Letter INSPECTION SUMMARY
08/13/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/24/2021 image.jpg
09/24/2021 image.jpg0
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 image.jpg1
09/24/2021 image.jpg2
09/24/2021 image.jpg3
09/24/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/29/2021 Letter INSPECTION SUMMARY
12/29/2021 Letter INSPECTION SUMMARY
12/29/2021 Letter Codes Temporary Certificate of Occupancy
12/29/2021 Letter Fire Loss Reduction Form
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter Codes Temporary Certificate of Occupancy
02/23/2022 Letter Codes Temporary Certificate of Occupancy
02/24/2022 Letter Codes Temporary Certificate of Occupancy
02/24/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter Codes Temporary Certificate of Occupancy
03/21/2022 Letter Fire Loss Reduction Form
04/14/2022 Letter Codes Final Certificate of Occupancy
04/14/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: