Summary
PRCOM20201993
Building Permit - Commercial
Certificate of Occupancy
OWE LLC
CHANGE OF TENANT
TENANT FINISH FOR BANK OFFICES
07/17/2020
02/26/2021
04/21/2021
04/20/2022
Locations
Contacts
United Construction Services Inc, Address:11380 Strang Line Road, Phone:(913) 317-5700  
PERRY HANES CONSTRUCTION LLC, Address:906 BUCKEYE LN, Phone:(816) 661-3196  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
STINE-NICHOLS PLUMBING INC, Address:318 E 16TH AVE, Phone:(816) 348-3481  
DEGASPERI & ASSOCIATES ARCHITECTURE, Address:6240 WEST 135TH STREET STE 200, Phone:(913) 647-5300  
jmonte@nebelcsi.com, Address:jmonte@nebelcsi.com  
OWE LLC, Address:725 NW EAGLE RIDGE CIR  
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/28/2020 02/22/2021
Joe Frogge
LC - General Contractor
Resolved
02/02/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 10/23/20 - acknowledged in letter.
LC - MEP Subs
Resolved
02/02/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/23/20 - acknowledged in letter.
Building Plan Review Approved with Conditions 10/28/2020 02/22/2021
Joe Frogge
Miscellaneous Correction
Resolved
10/23/2020

Incomplete submittal. Action required: Provide complete MEP designs. "Design Build" is acceptable but must be submitted at the same time. We will not review separately as the trades can and do affect each other.
Misc
Resolved
02/22/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/23/20 - acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
10/21/2020

This tenant finish permit is associated with an incomplete shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit. 10/23/20 - acknowledged in letter.
Code analysis required
Resolved
10/23/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to show type IIIB construction. (separate types only allowable when separated by fire walls)
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
10/23/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door out of Mother's Room 117.
Misc
Corrective Action Required
10/21/2020

As a result of CPTED security review our Police Department has suggested that it would be better to switch the office on the north side of the vestibule and the lobby where the vestibule would open and customers would enter straight through, on the north side so everyone in the building could see who was coming in. Action required: Comment is for informational purposes. Change is not required. 10/29/20 - acknowledged in letter
Planning - Screening of rooftop equipment
Resolved
10/29/2020

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 10/29/20 - this work is to be performed under permit PRCOM20201911
IBC 1606.2 Design dead load - structural
Resolved
10/29/2020

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load or design to compensate. 10/29/20 - this work is to be performed under permit PRCOM20201911
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
10/29/2020

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience receptacle within 25' of new roof mounted equipment. 10/29/20 - this work is to be performed under permit PRCOM20201911
Fire Plan Review Approved with Conditions 10/28/2020 10/21/2020
Michael Weissenbach
Address numbers required
Corrective Action Required
10/21/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Miscellaneous Correction
Resolved
10/21/2020

Illumination required
Corrective Action Required
10/21/2020

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide exterior emergency lighting at exit doors.
CPTED Plan Review Approved 07/29/2020 07/27/2020
Joe Frogge
Fire Plan Review Rejected 07/29/2020 07/20/2020
Michael Weissenbach
Address numbers required
Corrective Action Required
07/20/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Miscellaneous Correction
Corrective Action Required
07/20/2020

(Action Required) 1.Provide complete MEP plans to be reviewed. 2. Exterior emergency lighting including exit signage at front entrance. 3. Exit signage for rear exit.
Building Plan Review Rejected 07/29/2020 07/20/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
07/20/2020

Incomplete submittal. Action required: Provide complete MEP designs. "Design Build" is acceptable but must be submitted at the same time. We will not review separately as the trades can and do affect each other.
Misc
Corrective Action Required
07/20/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
07/20/2020

This tenant finish permit is associated with an incomplete shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit.
Code analysis required
Corrective Action Required
07/20/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis to show type IIIB construction. (separate types only allowable when separated by fire walls)
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
07/20/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of door out of Mother's Room 117.
Misc
Corrective Action Required
07/27/2020

As a result of CPTED security review our Police Department has suggested that it would be better to switch the office on the north side of the vestibule and the lobby where the vestibule would open and customers would enter straight through, on the north side so everyone in the building could see who was coming in. Action required: Comment is for informational purposes. Change is not required.
Zoning Review Approved 07/29/2020 07/20/2020
Joe Frogge
Licensed Contractors Rejected 07/29/2020 07/20/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
07/20/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
07/20/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $480.00 $480.00 Paid 02/25/2021
$0.00
8331507-Sewer Connection Fee $90.00 $90.00 Paid 02/26/2021
Commercial Excise Tax Fee $17,460.00 $17,460.00 Paid 04/26/2021
$4,515.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 3/10/2021 3/10/2021 03/10/2021
Above Ceiling Inspection Passed 4/9/2021 4/9/2021 04/09/2021
Occupancy Inspection - Codes Commercial Temporary C of O 4/30/2021 4/30/2021 04/30/2021
Misc
Corrective Action Required
04/30/2021
COMPLETE ATM INSTALL COMPLETE CPTED PROVISIONS FLOOR PLAN A-10 BELOW ITEMS FIRE FAILED UPDATE FIRE EXTINGUISHERS PROVIDE EXIT LIGHTING TO BACK DOOR PROVIDE EMERGENCY LIGHTING EXTERIOR AT FRONT DOOR PER PLAN
Occupancy Inspection - Fire Temporary C of O 05/04/2021
Miscellaneous Inspection Passed 4/20/2022 4/20/2022 04/20/2022
Misc
Corrective Action Required
04/20/2022
Final re inspection scheduled for 4/20/22
Occupancy Inspection - Codes Commercial Full C of O 4/20/2022 4/20/2022 04/20/2022
Misc
Resolved
04/20/2022
BELOW ITEMS FIRE FAILED UPDATE FIRE EXTINGUISHERS PROVIDE EXIT LIGHTING TO BACK DOOR PROVIDE EMERGENCY LIGHTING EXTERIOR AT FRONT DOOR PER PLAN
Occupancy Inspection - Fire Passed 4/20/2022 4/20/2022 04/22/2022
Documents & Images
Date Uploaded File Type Document Name
07/17/2020 Application Form CCB 3rd-Permit App
07/19/2020 Plans CCB-LS, 7_19_20
07/20/2020 Email use clarification for LT
07/20/2020 Letter Fire Building Plan Review
07/27/2020 Letter DS P/R Corrections Document
07/27/2020 Email RE CPTED - Country Club Bank - PRCOM20201993 - 32 SE 3rd St
10/20/2020 Plans CCB-LS, 10_20_20
10/21/2020 Letter CCB-City Resp 1
10/21/2020 Letter Fire Building Plan Review
10/23/2020 Letter DS P/R Corrections Document
10/29/2020 Letter CCB-City Resp 2
11/03/2020 Letter License Tax Bill
11/03/2020 Email LT billing info
02/02/2021 Approved Plans approved - CCB-LS, 10_20_20
02/22/2021 Application Form Scanned from a Xerox Multifunction Printer
02/25/2021 Receipt Receipt for transaction:2021-000928
02/26/2021 Receipt Receipt for transaction:2021-000943
02/26/2021 Letter DS Building Permit
03/10/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/26/2021 Receipt Receipt for transaction: 2021-002225
04/30/2021 Letter Codes Temporary Certificate of Occupancy
05/03/2021 _cover-CCB 3rd, 5_3_21
04/20/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter Codes Final Certificate of Occupancy
04/20/2022 Letter Field Certificate of Occupancy
04/22/2022 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home