Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
|
07/15/2020
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
|
06/30/2020
|
|
Michael Weissenbach
|
|
Misc
Corrective Action Required
(Informational Purposes)
Update records showing NFPA 13 2016 Edition
|
|
|
Building Plan Review
|
Approved with Conditions
|
05/13/2020
|
05/29/2020
|
|
Joe Frogge
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is for informational purposes.
5/7/20 - acknowledged in letter.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
5/7/20 - acknowledged in letter.
|
|
CORRIDORS
Corrective Action Required
Inadequate information to complete review.
Action required: Provide complete MEP design.
5/7/20 - Provide the following:
- Emergency lighting at exterior side of exits to be field verified.
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Update code analysis to show 1:15 in seating area and 1:60 in mercantile.
5/7/20 - 1:30 still used at mercantile but elevated occ load will not affect plan review.
|
|
|
Health Department Review
|
Approved
|
|
05/29/2020
|
|
Joe Frogge
|
|
|
Licensed Contractors
|
Approved
|
05/13/2020
|
05/07/2020
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (BGS Constr. not licensed)
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Mechanical contractor required)
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/13/2020
|
05/06/2020
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load at 139
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the fire alarm, provide three sets of PE stamped shop drawings.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Note: Walk in cooler will need to be sprinklered. Also, overhead door will need coverage underneath.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|
Building Plan Review
|
Rejected
|
03/27/2020
|
03/19/2020
|
|
Joe Frogge
|
|
Health Dept Review
Corrective Action Required
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
CORRIDORS
Corrective Action Required
Inadequate information to complete review.
Action required: Provide complete MEP design.
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Update code analysis to show 1:15 in seating area and 1:60 in mercantile.
|
|
|
Licensed Contractors
|
Rejected
|
03/27/2020
|
03/19/2020
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (BGS Constr. not licensed)
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Mechanical contractor required)
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/27/2020
|
03/18/2020
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load at 139
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the fire alarm, provide three sets of PE stamped shop drawings.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Note: Walk in cooler will need to be sprinklered. Also, overhead door will need coverage underneath.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|