Permit Application Status

PRCOM20192084


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192084
Building Permit - Commercial
Final Completion
PHAM MAI & TRAN JOSEPH
ALTERATION COMMERCIAL
WHITE BOX RENOVATION FOR POSSIBLE FUTURE DISPENSARY INCLUDING EXTERIOR RENOVATIONS
08/02/2019
08/14/2019
02/09/2020
03/24/2020
Locations
Contacts
PHAM MAI & TRAN JOSEPH, Address:510 SW 3RD ST  
THOMPSON BUILDERS LLC, Address:4559 GROVE ST, Phone:(913) 915-2836  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
TODCO, Address:1260 SE CENTURY DR, Phone:(816) 875-1941  
C H ELECTRIC & TECHNOLOGY, Address:PO BOX 1984, Phone:(816) 365-7650  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/14/2019 08/14/2019
Development Center
LC - General Contractor
Resolved
08/14/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
08/14/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 08/21/2019 08/14/2019
Development Center
Miscellaneous Correction
Corrective Action Required
08/14/2019

Plan review is for white box only and does not cover egress, accessibility, occupancy, etc. Action required: Comment is for informational purposes. 8/14/19 - Acknowledged in letter
Miscellaneous Correction
Resolved
08/14/2019

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is currently typed as a 5B. If it is your intention to reclassify as a 2B provide verification that existing construction is non-combustible. (we recommend leaving as 5b for flexibility at future projects)
Screening - Rooftop equipment
Corrective Action Required
08/14/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how new condensing will be screened from all 4 sides per referenced UDO section. 8/14/19 - Condensing unit to be relocated - architect has been made aware that new location, which has been deferred to construction, must be screened per ordinance.
Miscellaneous Correction
Resolved
08/14/2019

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional load at new condensing unit. 8/14/19 - Per architect, loads were used in calculations for design submitted
Fire Plan Review Approved with Conditions 08/21/2019 08/14/2019
Development Center
Address numbers required
Corrective Action Required
08/14/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Door operations
Corrective Action Required
08/14/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 08/16/2019 08/13/2019
Joe Frogge
License Tax Application
Resolved
08/13/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
08/13/2019

Plan review is for white box only and does not cover egress, accessibility, occupancy, etc. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
08/13/2019

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: This building is currently typed as a 5B. If it is your intention to reclassify as a 2B provide verification that existing construction is non-combustible. (we recommend leaving as 5b for flexibility at future projects)
Screening - Rooftop equipment
Corrective Action Required
08/13/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how new condensing will be screened from all 4 sides per referenced UDO section.
Miscellaneous Correction
Corrective Action Required
08/13/2019

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional load at new condensing unit.
Fire Plan Review Approved with Conditions 08/14/2019 08/13/2019
Joe Frogge
Address numbers required
Corrective Action Required
08/13/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Door operations
Corrective Action Required
08/13/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Licensed Contractors Rejected 08/16/2019 08/12/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
08/13/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/13/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 08/14/2019 08/12/2019
Michael Weissenbach
Address numbers required
Corrective Action Required
08/12/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Door operations
Corrective Action Required
08/12/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $3,202.50 $3,202.50 Paid 03/24/2020
$3,202.50
9110078-Valuation Fee for Change of Tenant $360.00 $360.00 Paid 08/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 10/18/2019 10/18/2019 at 9:35 AM 10/18/2019
Misc
Partial Correction
03/05/2020
OK TO COVER WHEN READY LIGHT-GUAGE STEEL FRAMING AT PARAPET WALL.
Final Inspection - Commercial Failed 3/5/2020 at 3:10 PM 03/05/2020
Misc
Corrective Action Required
03/05/2020
BUILDING SHELL WORK SCOPE TO DATE INCLUDES INTERIOR DEMO, EXTERIOR IMPROVEMENTS, NEW STRUCTURAL STEEL WORK INSPECTED BY VAN DURZIEN, SCREEN WALL, RTU WITH SCREENING* ABOVE RETAIL AREA 102, NEW GAS PIPING TO RTU, AND OTHER. - EXPOSED STEEL GAS PIPE MUST BE PAINTED. - GAS PIPE PRESSURE TEST REQUIRED. - IN-USE COVER REQUIRED AT RTU RECEPTACLE - *RTU SCREENING SUBJECT TO PLANNING APPROVAL
Rough Framing Inspection - Commercial Passed 03/05/2020
Misc
Resolved
03/05/2020
OK TO COVER WHEN READY LIGHT-GUAGE STEEL FRAMING AT PARAPET WALL.
Gas Service Inspection - Commercial Passed 3/22/2020 03/23/2020
Final Inspection - Commercial Passed 3/23/2020 3/23/2020 03/23/2020
Misc
Corrective Action Required
03/05/2020
BUILDING SHELL WORK SCOPE TO DATE INCLUDES INTERIOR DEMO, EXTERIOR IMPROVEMENTS, NEW STRUCTURAL STEEL WORK INSPECTED BY VAN DURZIEN, SCREEN WALL, RTU WITH SCREENING* ABOVE RETAIL AREA 102, NEW GAS PIPING TO RTU, AND OTHER. - EXPOSED STEEL GAS PIPE MUST BE PAINTED. - GAS PIPE PRESSURE TEST REQUIRED. - IN-USE COVER REQUIRED AT RTU RECEPTACLE - *RTU SCREENING SUBJECT TO PLANNING APPROVAL
Documents & Images
Date Uploaded File Type Document Name
08/12/2019 Letter Fire Building Plan Review
08/13/2019 Letter DS P/R Corrections Document
08/14/2019 Receipt Receipt for transaction: 2019-005586
08/14/2019 Letter DS Building Permit
10/18/2019 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/06/2020 Engineer Report/Study DOC030620-03062020150737
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home