Permit Application Status

PRCOM20183479


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20183479
Building Permit - Commercial
Certificate of Occupancy
CHOYCE LLC
NEW COMMERCIAL
WAREHOUSE WITH OFFICE
10/09/2018
12/20/2018
06/11/2019
09/04/2020
Locations
Contacts
CHOYCE LLC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
LUCAS ELECTRIC , Address:517 MARGARET LN, Phone:(816) 807-4432  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
MD2 DESIGNS, Address:2307 NW OUTER BELT RD, Phone:(816) 372-4384  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 12/19/2018 08/21/2019
Michael Weissenbach
Address numbers required
Corrective Action Required
08/21/2019

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address shall be readable from the roadway (Broadway)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/21/2019

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (verified at inspection) Provide one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. To be located on normal paths of travel close to an exit.
Misc
Corrective Action Required
08/21/2019

Egress lighting ACTION REQUIRED:(Verified At Inspection)Emergency lighting needs to be added in the following areas (1) On the exterior of all egress doors.
Fire Plan Review Approved with Conditions 12/19/2018 12/17/2018
Joe Dir
Access roads required for building and facilities
Resolved
12/17/2018

2012 IFC 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45,720 mm) where: 1.The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. 3. There are not more than two Group R-3 or Group U occupancies. ACTION REQUIRED: Provide a civil plans showing roadway access to the structure.
Address numbers required
Corrective Action Required
12/17/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address shall be readable from the roadway (Broadway)
Hydrant required
Resolved
12/17/2018

2012 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ACTION REQUIRED: Provide a civil paln showing fire hydrants in proximity to the building.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
12/17/2018

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (verified at inspection) Provide one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. To be located on normal paths of travel close to an exit.
Misc
Resolved
12/17/2018

Storage ACTION REQUIRED: Provide information on the height of the pallet storage and ground storage will be stacked. If the top of the pallet storage or ground storege exceeds 12 feet in height, draft curtains, smoke removal system, fire alarm system and or a fire sprinkler system may be required.
Misc
Resolved
12/17/2018

Storage type ACTION REQUIRED: Provide information on what ground storage means. What is going to be stored in the ground storage area.
Misc
Resolved
12/17/2018

Storage plan ACTION REQUIRED: Provide a floor plan with the layout of the storage positioning in the warehouse and ground stroage areas.
Misc
Corrective Action Required
12/17/2018

Egress lighting ACTION REQUIRED:Emergency lighting needs to be added in the following areas (1) On the exterior of all egress doors.
Fire Plan Review Rejected 12/18/2018 12/12/2018
Joe Dir
Construction documents for fire alarm systems
Resolved
12/12/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(Information purposes) (alarm system may be required by table 3206.2) Have the fire alarm system contractor provide PE stamped shop drawings of the fire alarm system to be installed
Access roads required for building and facilities
Corrective Action Required
12/11/2018

2012 IFC 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45,720 mm) where: 1.The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. 3. There are not more than two Group R-3 or Group U occupancies. ACTION REQUIRED: Provide a civil plans showing roadway access to the structure.
Address numbers required
Corrective Action Required
12/11/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) Address shall be readable from the roadway (Broadway)
Hydrant required
Corrective Action Required
12/11/2018

2012 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ACTION REQUIRED: Provide a civil paln showing fire hydrants in proximity to the building.
Construction documents - Fire protection systems
Resolved
12/12/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Reference Table 3206.2 for extent and type of protection required. Fire sprinkler system may be required
Installation acceptance testing
Resolved
12/12/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of the fire alarm system and or the fire sprinkler system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
12/11/2018

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (verified at inspection) Provide one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. To be located on normal paths of travel close to an exit.
Misc
Corrective Action Required
12/11/2018

Storage ACTION REQUIRED: Provide information on the height of the pallet storage and ground storage will be stacked. If the top of the pallet storage or ground storege exceeds 12 feet in height, draft curtains, smoke removal system, fire alarm system and or a fire sprinkler system may be required.
Misc
Corrective Action Required
12/11/2018

Storage type ACTION REQUIRED: Provide information on what ground storage means. What is going to be stored in the ground storage area.
Misc
Corrective Action Required
12/11/2018

Storage plan ACTION REQUIRED: Provide a floor plan with the layout of the storage positioning in the warehouse and ground stroage areas.
Misc
Corrective Action Required
12/11/2018

Egress lighting ACTION REQUIRED: plans need to indicate location of emergency lighting in the following areas (1) exterior of all egress doors [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied
Building Plan Review Rejected 12/18/2018 12/12/2018
Joe Frogge
Engineered truss package
Resolved
12/12/2018

Copies of the engineered building package was not provided at the time of permit application. Action required: Provide pre-engineered building package or request deferral. 11/21/18 - not addressed
Misc
Resolved
12/18/2018

Not enough information provided to complete review. Action required: Complete MEP designs. (given scarcity of design information we withhold the right to add plan review comments in the future) 11/21/18 - provide the following: - - - - - Electrical service wiring diagram complete with all grounding methods 12/12/18 - Inadequate grounding (must be to all available sources including building steel and "Ufer." Also, service grounding takes place at initial source of disconnect. - Pipe material schedule 12/12/18 - Only able to find for water service. Missing water distribution, waste, vent and gas. - - - -
Mech - Outdoor air required 403.2
Resolved
12/12/2018

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Action required: Revise drawings to show outside air calculations as well as method of delivery. 11/21/18 - not addressed
Misc
Resolved
12/12/2018

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Retaining wall footings must be protected from frost. (currently at same elevation as dock ramp.) 11/21/18 - not addressed
Accessibility - Water closet clearance width 604.3.1
Resolved
12/12/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Revise design to comply. (urinals may not intrude into clearance width) 11/21/18 - Provide 5' clear measured from edge of toilets to wall.
Misc
Resolved
12/12/2018

2012 IBC 1607.3 Uniform live loads. The live loads used in the design of buildings and other structures shall be the maximum loads expected by the intended use or occupancy but shall in no case be less than the minimum uniformly distributed live loads given in Table 1607.1. Action required: List appropriate live load at mezzanine and redesign floor accordingly. (minimum 125psf if usable mezzanine or minimum 60psf if equipment platform only) 11/21/18 - not addressed
Misc
Resolved
12/12/2018

2012 IBC 505.3.3 Guards. Equipment platforms shall have guards where required by Section 1013.2. Action required: Provide design for guard rails. 11/21/18 - To be minimum 42" high - Will there be a gate?
Screening - Ground mounted equipment
Resolved
12/12/2018

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. (assuming that there will be at least 1 condensing unit) 11/21/18 - Location shown but no design - also, it is to be screened from all 4 sides
Misc
Resolved
12/12/2018

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide compliant receptacle at condensing unit. 11/21/18 - must be gfci and weather protected
Final Development Plan Review Approved 11/28/2018
Joe Frogge
Building Plan Review Rejected 11/29/2018 11/21/2018
Joe Frogge
Final Development Plan
Resolved
11/28/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 11/21/18 - not addressed
Bldg - Occupant load calculations - Areas without fixed seating 1004.1.2
Resolved
11/21/2018

2012 IBC 1004.1.2 - Areas without fixed seating. The number of occupants shall be computed at the rate of one occupant per unit of area as described in Table 1004.1.2. For areas without fixed seating, the occupant load shall not be less than that number determined by dividing the floor area under consideration by the occupant load factor assigned to the function of the space as set forth in Table 1004.1.2. Where an intended function is not listed in Table 1004.1.2, the building official shall establish a function based on a listed function that most nearly resembles the intended function. Action required: Update occupant load calculations. Numbers to be rounded up when not whole. (32 total in this case)
Plan Submittal 2012 Codes
Resolved
11/21/2018

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update plans to depict adopted accessibility code which is 2009-ICC/ANSI A117.1
Code analysis required
Resolved
11/21/2018

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Consolidate and update code analyses. Sheet 1 conflicts with Sheet 5. Whether this building is to be S1 or S2 affects many aspects of our review which may lead to future plan review comments.
Engineered truss package
Corrective Action Required
11/20/2018

Copies of the engineered building package was not provided at the time of permit application. Action required: Provide pre-engineered building package or request deferral. 11/21/18 - not addressed
Misc
Corrective Action Required
11/20/2018

Not enough information provided to complete review. Action required: Complete MEP designs. (given scarcity of design information we withhold the right to add plan review comments in the future) 11/21/18 - provide the following: - Electrical specifications (methods/materials) - Circuits & disconnects for space heaters - Disconnect switch for water heater - Receptacle at a/c unit to be GFCI and weather protected - Electrical service wiring diagram complete with all grounding methods - Pipe material schedule - Plumbing fixture schedule - Show waste pipe cleanout locations - HVAC equipment schedule or spec - Outside air calculations
Mech - Outdoor air required 403.2
Corrective Action Required
11/20/2018

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Action required: Revise drawings to show outside air calculations as well as method of delivery. 11/21/18 - not addressed
Misc
Corrective Action Required
11/20/2018

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Retaining wall footings must be protected from frost. (currently at same elevation as dock ramp.) 11/21/18 - not addressed
Accessibility - Water closet clearance width 604.3.1
Corrective Action Required
11/20/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Revise design to comply. (urinals may not intrude into clearance width) 11/21/18 - Provide 5' clear measured from edge of toilets to wall.
Bldg - Urinal partitions 1210.3.2
Resolved
11/21/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished back wall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide urinal partitions.
Bldg - Accessibility - Kitchens and kitchenettes 1109.4
Resolved
11/21/2018

2012 IBC 1109.4 – Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible. Action required: Specify compliant sink and counter heights in break room. (maximum 34" high)
Bldg - Toilet room wall finish 1210.2.2
Resolved
11/21/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at restrooms and mop sink.
Misc
Resolved
11/21/2018

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Bldg - Emergency power for illumination 1006.3
Resolved
11/21/2018

2012 IBC 1006.3 - Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that required two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required: Provide emergency lighting at exterior side of exit doors.
Misc
Corrective Action Required
11/20/2018

2012 IBC 1607.3 Uniform live loads. The live loads used in the design of buildings and other structures shall be the maximum loads expected by the intended use or occupancy but shall in no case be less than the minimum uniformly distributed live loads given in Table 1607.1. Action required: List appropriate live load at mezzanine and redesign floor accordingly. (minimum 125psf if usable mezzanine or minimum 60psf if equipment platform only) 11/21/18 - not addressed
Misc
Corrective Action Required
11/20/2018

2012 IBC 505.3.3 Guards. Equipment platforms shall have guards where required by Section 1013.2. Action required: Provide design for guard rails. 11/21/18 - To be minimum 42" high - Will there be a gate?
Screening - Ground mounted equipment
Corrective Action Required
11/20/2018

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. (assuming that there will be at least 1 condensing unit) 11/21/18 - Location shown but no design - also, it is to be screened from all 4 sides
Misc
Corrective Action Required
11/20/2018

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide compliant receptacle at condensing unit. 11/21/18 - must be gfci and weather protected
Fire Plan Review Rejected 11/29/2018 11/21/2018
Joe Dir
Posting of occupant load
Resolved
11/21/2018

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: Provide a occupant load figures for office area and warehouse area
Construction documents for fire alarm systems
Corrective Action Required
11/20/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(Information purposes) (alarm system may be required by table 3206.2) Have the fire alarm system contractor provide PE stamped shop drawings of the fire alarm system to be installed
Access roads required for building and facilities
Corrective Action Required
11/20/2018

2012 IFC 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45,720 mm) where: 1.The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. 3. There are not more than two Group R-3 or Group U occupancies. ACTION REQUIRED: Provide a civil plans showing roadway access to the structure.
Address numbers required
Corrective Action Required
11/20/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) Address shall be readable from the roadway (Broadway)
Hydrant required
Corrective Action Required
11/20/2018

2012 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ACTION REQUIRED: Provide a civil paln showing fire hydrants in proximity to the building.
Construction documents - Fire protection systems
Corrective Action Required
11/20/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Reference Table 3206.2 for extent and type of protection required. Fire sprinkler system may be required
Installation acceptance testing
Corrective Action Required
11/20/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of the fire alarm system and or the fire sprinkler system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/20/2018

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (veriifed at inspection) Provide one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. To be located on normal paths of travel close to an exit.
Misc
Corrective Action Required
11/20/2018

Storage ACTION REQUIRED: Provide information on the height of the pallet storage and ground storage will be stacked. If the top of the pallet storage or ground storege exceeds 12 feet in height, draft curtains, smoke removal system, fire alarm system and or a fire sprinkler system may be required.
Misc
Corrective Action Required
11/20/2018

Storage type ACTION REQUIRED: Provide information on what ground stroage means. What are you going to be storing in this ground storage area.
Misc
Corrective Action Required
11/20/2018

Storage plan ACTION REQUIRED: Provide a floor plan with the layout of the storage positioning in the warehouse.
Misc
Corrective Action Required
11/20/2018

Egress lighting ACTION REQUIRED: plans need to indicate location of emergency lighting throughout building. (1) interior and exterior of all egress doors, (2) mezzanine area (3) mezzanine stairs (4) office area corridors (5) warehouse /storage areas [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604.
Misc
Resolved
11/21/2018

mixed use separation ACTION REQUIRED: Storage may require separation 3206.3 Separation of high-piled storage areas. High-piled storage areas shall be separated from other portions of the building where required by Sections 3206.3.1 through 3206.3.2.2. 3206.3.1 Separation from other uses. Mixed occupancies shall be separated in accordance with the International Building Code.
Licensed Contractors Approved 11/20/2018 11/21/2018
Joe Frogge
Building Plan Review Rejected 10/23/2018 10/16/2018
Joe Frogge
Final Development Plan
Corrective Action Required
10/16/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Bldg - Occupant load calculations - Areas without fixed seating 1004.1.2
Corrective Action Required
10/16/2018

2012 IBC 1004.1.2 - Areas without fixed seating. The number of occupants shall be computed at the rate of one occupant per unit of area as described in Table 1004.1.2. For areas without fixed seating, the occupant load shall not be less than that number determined by dividing the floor area under consideration by the occupant load factor assigned to the function of the space as set forth in Table 1004.1.2. Where an intended function is not listed in Table 1004.1.2, the building official shall establish a function based on a listed function that most nearly resembles the intended function. Action required: Update occupant load calculations. Numbers to be rounded up when not whole. (32 total in this case)
Plan Submittal 2012 Codes
Corrective Action Required
10/16/2018

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Update plans to depict adopted accessibility code which is 2009-ICC/ANSI A117.1
Code analysis required
Corrective Action Required
10/16/2018

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Consolidate and update code analyses. Sheet 1 conflicts with Sheet 5. Whether this building is to be S1 or S2 affects many aspects of our review which may lead to future plan review comments.
Engineered truss package
Corrective Action Required
10/16/2018

Copies of the engineered building package was not provided at the time of permit application. Action required: Provide pre-engineered building package or request deferral.
Misc
Corrective Action Required
10/16/2018

Not enough information provided to complete review. Action required: Complete MEP designs. (given scarcity of design information we withhold the right to add plan review comments in the future)
Mech - Outdoor air required 403.2
Corrective Action Required
10/16/2018

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Action required: Revise drawings to show outside air calculations as well as method of delivery.
Misc
Corrective Action Required
10/16/2018

2012 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Retaining wall footings must be protected from frost. (currently at same elevation as dock ramp.)
Accessibility - Water closet clearance width 604.3.1
Corrective Action Required
10/16/2018

ICC A117.1-2009 604.3.1 – Clearance width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action required: Revise design to comply. (urinals may not intrude into clearance width)
Bldg - Urinal partitions 1210.3.2
Corrective Action Required
10/16/2018

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished back wall surface, whichever is greater. (See code section for possible exceptions.) Action required: Provide urinal partitions.
Bldg - Accessibility - Kitchens and kitchenettes 1109.4
Corrective Action Required
10/16/2018

2012 IBC 1109.4 – Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible. Action required: Specify compliant sink and counter heights in break room. (maximum 34" high)
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
10/16/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at restrooms and mop sink.
Misc
Corrective Action Required
10/16/2018

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Bldg - Emergency power for illumination 1006.3
Corrective Action Required
10/16/2018

2012 IBC 1006.3 - Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that required two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required: Provide emergency lighting at exterior side of exit doors.
Misc
Corrective Action Required
10/16/2018

2012 IBC 1607.3 Uniform live loads. The live loads used in the design of buildings and other structures shall be the maximum loads expected by the intended use or occupancy but shall in no case be less than the minimum uniformly distributed live loads given in Table 1607.1. Action required: List appropriate live load at mezzanine and redesign floor accordingly. (minimum 125psf if usable mezzanine or minimum 60psf if equipment platform only)
Misc
Corrective Action Required
10/16/2018

2012 IBC 505.3.3 Guards. Equipment platforms shall have guards where required by Section 1013.2. Action required: Provide design for guard rails.
Screening - Ground mounted equipment
Corrective Action Required
10/16/2018

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. (assuming that there will be at least 1 condensing unit)
Misc
Corrective Action Required
10/16/2018

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide compliant receptacle at condensing unit.
Fire Plan Review Rejected 10/23/2018 10/11/2018
Joe Dir
Posting of occupant load
Corrective Action Required
10/11/2018

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: Provide a occupant load figures for office area and warehouse area
Construction documents for fire alarm systems
Corrective Action Required
10/11/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(Information purposes) (alarm system required by table 3206.2) Have the fire alarm system contractor provide PE stamped shop drawings of the fire alarm system to be installed
Access roads required for building and facilities
Corrective Action Required
10/11/2018

2012 IFC 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45,720 mm) where: 1.The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. 3. There are not more than two Group R-3 or Group U occupancies. ACTION REQUIRED: Provide a civil plans showing roadway access to the structure.
Address numbers required
Corrective Action Required
10/11/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) Address shall be readable from the roadway (Broadway)
Hydrant required
Corrective Action Required
10/11/2018

2012 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). ACTION REQUIRED: Provide a civil paln showing fire hydrants.
Construction documents - Fire protection systems
Corrective Action Required
10/11/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Reference Table 3206.2 for extent and type of protection required.
Installation acceptance testing
Corrective Action Required
10/11/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of the fire alarm system and or the fire sprinkler system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/11/2018

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (veriifed at inspection) Provide one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. To be located on normal paths of travel close to an exit.
Misc
Corrective Action Required
10/11/2018

Storage ACTION REQUIRED: Provide information on what will be stored and the commodity classification. 3203.1 Classification of commodities.
Misc
Corrective Action Required
10/11/2018

Storage type ACTION REQUIRED: Provide information how commodity will be stored, high pile, rack, pallets ?
Misc
Corrective Action Required
10/11/2018

Storage plan ACTION REQUIRED: Provide a floor plan with the layout of the storage positioning in the warehouse.
Misc
Corrective Action Required
10/11/2018

Egress lighting ACTION REQUIRED: plans need to indicat location of emergency lighting throughout building. [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604.
Misc
Corrective Action Required
10/11/2018

mixed use separation ACTION REQUIRED: Storage may require separation 3206.3 Separation of high-piled storage areas. High-piled storage areas shall be separated from other portions of the building where required by Sections 3206.3.1 through 3206.3.2.2. 3206.3.1 Separation from other uses. Mixed occupancies shall be separated in accordance with the International Building Code.
Licensed Contractors Approved 10/23/2018 10/09/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $1,360.00 $1,360.00 Paid 12/20/2018
8331507-Sewer Connection Fee $270.00 $270.00 Paid 12/20/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 1/8/2019 1/9/2019 at 10:00 AM 01/09/2019
Misc
Partial Correction
01/09/2019
COLUMN PADS ON PLANS HAVE CONFLICTING DETAILS. INSTALLED 2 MATS #4 BARS EACH WAY. HAVE ENGINEER ADDRESS. POUR AT OWN RISK.
Footing Inspection - Commercial Partial 3/21/2019 3/21/2019 03/21/2019
Misc
Partial Correction
03/21/2019
EXTERIOR GRADE BEAM AND LOADING DOCK APPROVED. NO INTERIOR GRADE BEAMS INSTALLED
Foundation Inspection - Commercial Passed 3/25/2019 3/25/2019 at 1:00 PM 03/25/2019
Footing Inspection - Commercial Passed 4/11/2019 4/11/2019 at 1:00 PM 04/11/2019
Misc
Resolved
04/11/2019
EXTERIOR GRADE BEAM AND LOADING DOCK APPROVED. NO INTERIOR GRADE BEAMS INSTALLED
Underslab Plumbing Inspection - Commercial Passed 4/16/2019 4/16/2019 at 9:00 AM 04/16/2019
Misc
Resolved
04/16/2019
PLUMBING APPROVED, DO NOT POUR SLAB UNTIL INTERIER GRADE BEAMS ARE INSPECTED AND APPROVED.
Sewer Service Inspection Passed 6/13/2019 6/13/2019 06/12/2019
All Rough Inspection - Commercial Failed 8/7/2019 8/7/2019 08/07/2019
Misc
Corrective Action Required
08/07/2019
Not ready, contractors still working and no plans on site
All Rough Inspection - Commercial Failed 8/9/2019 8/9/2019 08/09/2019
Misc
Corrective Action Required
08/07/2019
Resubmit entire plans for code analysis and type of construction, framing, and all MEP
Gas Piping Inspection - Commercial Failed 8/28/2019 8/28/2019 08/28/2019
Misc
Corrective Action Required
08/28/2019
no address no plans no erosion control no PSI do not re-schedule untill all of the above has been completed.
All Rough Inspection - Commercial Failed 10/1/2019 10/01/2019
Misc
Corrective Action Required
08/09/2019
Plumbing vents incomplete through roof. Plans shows MC or conduit not NM. Electrical not terminated in boxes throughout ceilings. Over bored studs in bathrooms max bore on. On bearing walls is 60%, with 5/8” left on either side of the stud. Plans show metal studs not wood studs framing Plans do not show size or spacing for wood studs. . Electrical incomplete to furnace. Electrical incomplete to mezzanine and warehouse. Electrical to south warehouse door has nm ran to exterior light that (not installed). All NM must be concealed and protected. Gas line 1 1-4” no test . Not ran to warehouse stubbed over no electrical to warehouse or mezzanine. Electrical to panels incomplete. HVAC- No fresh air duct , returns ran in open joist space. Fire stopping- install fire-stopping in south wall and at ceiling between joist and mezzanine, between exterior wall and interior wood wall every 10’ horizontal. All dbl wall construction shall be fire blocked. Also between floor levels in concealed spaces. Stair not cut to 7”-11” rise must comply code. No gas pressure test No gas piping diagram or sizing on plans.
All Rough Inspection - Commercial Failed 10/1/2019 10/01/2019
Misc
Corrective Action Required
10/01/2019
Plumbing vents incomplete through roof. Plans shows MC or conduit not NM. Electrical not terminated in boxes throughout ceilings. Over bored studs in bathrooms max bore on. On bearing walls is 60%, with 5/8” left on either side of the stud. Plans show metal studs not wood studs framing Plans do not show size or spacing for wood studs. . Electrical incomplete to furnace. Electrical incomplete to mezzanine and warehouse. Electrical to south warehouse door has nm ran to exterior light that (not installed). All NM must be concealed and protected. Gas line 1 1-4” no test . Not ran to warehouse stubbed over no electrical to warehouse or mezzanine. Electrical to panels incomplete. HVAC- No fresh air duct , returns ran in open joist space. Fire stopping- install fire-stopping in south wall and at ceiling between joist and mezzanine, between exterior wall and interior wood wall every 10’ horizontal. All dbl wall construction shall be fire blocked. Also between floor levels in concealed spaces. Stair not cut to 7”-11” rise must comply code. No gas pressure test No gas piping diagram or sizing on plans.
Misc
Corrective Action Required
10/01/2019
-- no plans on shell framing no inspections on structure of building. rear wall covered length of building. provide special inspection from engineer of record on structural shell of building.
Erosion Control Inspection Residential Failed 10/01/2019
Misc
Corrective Action Required
10/01/2019
Erosion control needs to be in place before any further inspections
All Rough Inspection - Commercial Failed 10/10/2019 10/10/2019 10/10/2019
Misc
Corrective Action Required
10/01/2019
---Plumbing vents incomplete through roof. PROVIDE FALL BACK TO DRAIN AND SECURE 2" VENT Plans -- -- Fire stopping- SEAL OPENINGS IN FIRE STOP WITH UNFACED INSULATION OR FOAM. --LOW PSI ON GAS LINE. NEED TO RE-TEST. --ELECTRCIAL SERIVCE AT MAIN DISCONNECT NEED TO TORQUE DOWN LUGS AND TIGHTEN GROUND WIRES.
Misc
Corrective Action Required
10/01/2019
NO INSPECTION DUE TO LASK OF EROSION CONTROL. DO NOT COVER. INSTALL REQUIRED EROSION CONTROL WITHIN 2 BUSINESS DAYS.
Erosion Control Inspection Residential Failed 10/10/2019
Misc
Corrective Action Required
10/01/2019
Erosion control needs to be in place before any further inspections MARK HARDING 10/10/2019 11:46 AM FAILED - INSTALL WITHIN 2 BUSINESS DAYS NO FURTHER INSPECTIONS- PROTECT STORM SEWER AND INLET.
Gas Piping Inspection - Commercial Passed 10/14/2019 10/14/2019 10/14/2019
Misc
Resolved
10/14/2019
Electrical Service Inspection Passed 10/14/2019 10/14/2019
All Rough Inspection - Commercial Passed 10/14/2019 10/14/2019 10/14/2019
Misc
Resolved
10/14/2019
All items resolved Ok to insulate and cover
Misc
Resolved
10/14/2019
Occupancy Inspection - Planning Temporary C of O 2/14/2020 02/14/2020
Corrective Action Required
02/14/2020
Install landscaping per the approved plan.
Corrective Action Required
02/14/2020
Complete the building exterior per the approved building elevations. The elevations show a stone base and stone pilasters used on all or parts of all building facades.
Occupancy Inspection - Codes Commercial Failed 2/14/2020 2/14/2020 02/14/2020
Misc
Corrective Action Required
02/14/2020
- INSTALL GRAB BARS AND BATHROOM EQUIPMENT PER ICC ANSI A117.1 , VERTICAL GRAB BAR, TOILET PAPER DISPENSER. - PROTECT NM UNDER MICROWAVE -INSTALL SPARK RINGS AT BATHROOM WALL -SECURE AND SUPPORT PEX WATER PIPE ON 2ND FLOOR AT EXTERIOR WALL AND WATER HEATER. -INSTALL PROTECTION BOOT AROUND PLUMBING UNDER SINK. CHANGE ADDRESS TO BE VISIBLE FROM THE STREET. CONTRASTING COLORS SEE COMMENTS FROM PLANNING, WATER, AND FIRE, SITE ENGINEERING BEFORE TCO CAN BE ISSUED.
Occupancy Inspection - Engineering Temporary C of O 2/19/2020 02/19/2020
Occupancy Inspection - Codes Commercial Temporary C of O 2/19/2020 2/19/2020 02/19/2020
Misc
Corrective Action Required
02/14/2020
SEE COMMENTS FROM PLANNING, WATER, AND FIRE, SITE ENGINEERING. Ok for tco 5/1/20
Occupancy Inspection - Water Utilities Passed 2/14/2020 03/12/2020
Occupancy Inspection - Codes Commercial Failed 5/4/2020 05/04/2020
Misc
Corrective Action Required
02/19/2020
SEE COMMENTS FROM PLANNING, WATER, AND FIRE, SITE ENGINEERING. Ok for tco 5/1/20 TCO has expired please submit letter requesting TCo extension stating date when all outstanding items will be completed.
Occupancy Inspection - Engineering Failed 6/15/2020 06/15/2020
Misc
Informational
06/15/2020
We are waiting on 70% vegetation on the lot next door.
Occupancy Inspection - Engineering Passed 6/30/2020 07/08/2020
Misc
Informational
06/15/2020
We are waiting on 70% vegetation on the lot next door.
Occupancy Inspection - Fire Passed 2/14/2020 07/08/2020
Occupancy Inspection - Planning Temporary C of O 07/16/2020
Corrective Action Required
07/16/2020
Complete the building exterior per the approved building elevations. The elevations show both a stone base and stone pilasters on the front (east) elevation and stone pilasters on the corners of the remaning three building elevations.
Occupancy Inspection - Planning Temporary C of O 8/14/2020 08/14/2020
Corrective Action Required
08/14/2020
THE FOLLOWING COMMENT WAS MADE BASED ON PREVIOUS INSPECTION(S): Complete the building exterior per the approved building elevations. The elevations show both a stone base and stone pilasters on the front (east) elevation and stone pilasters on the corners of the remaning three building elevations. RESPONSE FROM PERMIT HOLDER: Permit holder's engineer (Matt Schlicht with Engineering Solutions) contacted Hector Soto on behalf of permit holder to discuss how to address/satisfy City requirements in order to release Final C of O. The permit holder intends to submit revised architectural drawings calling for alternate architectural improvements for review and approval to meet City requirements.
Occupancy Inspection - Planning Passed 09/04/2020
Occupancy Inspection - Codes Commercial Full C of O 09/04/2020
Misc
Corrective Action Required
05/04/2020
SEE COMMENTS FROM PLANNING, WATER, AND FIRE, SITE ENGINEERING. Ok for tco 5/1/20 TCO has expired please submit letter requesting TCo extension stating date when all outstanding items will be completed.
Documents & Images
Date Uploaded File Type Document Name
10/11/2018 Letter Fire Building Plan Review
10/16/2018 Letter Codes P/R Corrections Document
11/21/2018 Letter Fire Building Plan Review
11/21/2018 Letter Codes P/R Corrections Document
12/12/2018 Letter Fire Building Plan Review
12/13/2018 Letter Codes P/R Corrections Document
12/17/2018 Letter Fire Building Plan Review
12/17/2018 Letter Fire Building Plan Review
12/18/2018 REVISIONS 12-18-18 CITY COMMENTS
12/20/2018 Receipt Receipt for transaction: 2018-007643
12/20/2018 Letter Codes Building Permit
12/20/2018 Letter Codes Plan Review Conditions
01/09/2019 Letter INSPECTION SUMMARY
03/21/2019 Letter INSPECTION SUMMARY
03/25/2019 Letter INSPECTION SUMMARY
04/05/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
06/12/2019 image
06/12/2019 image0
06/12/2019 image1
06/12/2019 SDR 26 BUILDING TO SEWER
06/12/2019 FERNCO BUILDING TO SEWER
06/12/2019 Letter INSPECTION SUMMARY
08/07/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
08/21/2019 Letter Fire Building Plan Review
08/28/2019 Letter INSPECTION SUMMARY
10/01/2019 Letter INSPECTION SUMMARY
10/01/2019 Letter INSPECTION SUMMARY
10/01/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter Fire Building Plan Review
10/10/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
02/14/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter Codes Temporary Certificate of Occupancy
05/04/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
09/04/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home