Summary
PRCOM20182613
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
4 STORY APARTMENT BUILDING *FOUNDATION PERMIT - PRCOM20183266
08/14/2018
09/30/2019
02/12/2021
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 02/11/2021
Michael Weissenbach
Alarm Plan Review Released for Construction 02/11/2021
Michael Weissenbach
Special Inspections Review Approved 11/09/2018
Mike Weisenborn
Licensed Contractors Approved 02/28/2019 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $25,053.99 $25,053.99 Paid 11/09/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 10/30/2019 10/30/2019 at 10:55 AM 10/30/2019
Misc
Partial Correction
10/30/2019
RELEASE SERVICE AT THREE TEMPORARY POST-MOUNTED SERVICES LABELED 901A, 901B, 901C
All Rough Inspection - Commercial Partial 12/12/2019 at 1:30 PM 12/12/2019
Misc
Partial Correction
12/12/2019
OK TO COVER WHEN READY WELL FACE OF WALLS AT STAIRWELLS: STAIR #1: 1ST FLOOR (REPAIR BOKEN PLUMBING STACK); STAIR #2: 1ST FLOOR;
Rated Assembly Inspection Partial 12/23/2019 12/23/2019 at 1:05 PM 12/23/2019
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: STAIR #1: 1ST FLOOR: WELL FACE + BACKSIDE ABV CLG: 1ST LAYER; STAIR #2: 1ST FLOOR: WELL FACE + BACKSIDE ABV CLG: 1ST LAYER;
Rated Assembly Inspection Partial 1/2/2020 1/2/2020 at 9:25 AM 01/02/2020
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: STAIR #1: 1ST FLOOR: WELL FACE + BACKSIDE ABV CLG: 1ST & 2ND LAYERS; STAIR #2: 1ST FLOOR: WELL FACE + BACKSIDE ABV CLG: 1ST & 2ND LAYERS;
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR: 1ST & 2ND LAYERS; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 2/25/2020 2/25/2020 at 12:05 PM 02/25/2020
Misc
Partial Correction
12/12/2019
OK TO COVER WHEN READY WELL FACE OF WALLS AT STAIRWELLS: STAIR #1: 1ST FLOOR; 2ND FLR; STAIR #2: 1ST FLOOR; 2ND FLR;
Rated Assembly Inspection Partial 3/2/2020 3/2/2020 at 10:20 AM 03/02/2020
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS; 2ND FLR 1ST LAYER STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS; 2ND FLR 1ST LAYER
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR: 1ST & 2ND LAYERS 2ND FLOOR: 1ST LAYER 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 3/4/2020 at 8:40 AM 03/04/2020
Misc
Partial Correction
03/02/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS
Misc
Partial Correction
03/02/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 4/1/2020 04/01/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
02/25/2020
STAIR TOWER 1
Corrective Action Required
04/01/2020
ROUGH FRAMING 0-4TH FLOOR
STAIR TOWER 2
Corrective Action Required
04/01/2020
ROUGH FRAMING 0-4TH FLOOR
LOWER LEVEL
Corrective Action Required
04/01/2020
FIRST FLOOR
Corrective Action Required
04/01/2020
SECOND FLOOR
Corrective Action Required
04/01/2020
THIRD FLOOR
Corrective Action Required
04/01/2020
FOURTH FLOOR
Corrective Action Required
04/01/2020
Rated Assembly Inspection Partial 4/7/2020 4/7/2020 04/07/2020
STAIR TOWER 1
Partial Correction
03/04/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER
STAIR TOWER 2
Partial Correction
03/04/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER 4TH FLOOR:
Rated Assembly Inspection Partial 4/13/2020 4/13/2020 04/13/2020
STAIR TOWER 1
Partial Correction
04/07/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER
STAIR TOWER 2
Partial Correction
04/07/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER 4TH FLOOR:
ELEVATOR 1
Corrective Action Required
04/13/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS
All Rough Inspection - Commercial Partial 4/22/2020 04/22/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/01/2020
EXTERIOR SHEAR WALL X
STAIR TOWER 1
Corrective Action Required
04/01/2020
ROUGH FRAMING 0-4TH FLOOR
STAIR TOWER 2
Corrective Action Required
04/01/2020
ROUGH FRAMING 0-4TH FLOOR
LOWER LEVEL
Corrective Action Required
04/01/2020
FIRST FLOOR
Corrective Action Required
04/01/2020
SECOND FLOOR
Corrective Action Required
04/01/2020
THIRD FLOOR
Corrective Action Required
04/01/2020
FOURTH FLOOR
Corrective Action Required
04/01/2020
All Rough Inspection - Commercial Partial 6/5/2020 6/5/2020 06/05/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/22/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
04/22/2020
ROUGH FRAMING 0-4TH FLOOR
STAIR TOWER 2
Corrective Action Required
04/22/2020
ROUGH FRAMING 0-4TH FLOOR
LOWER LEVEL
Corrective Action Required
04/22/2020
FIRST FLOOR
Corrective Action Required
04/22/2020
SECOND FLOOR
Corrective Action Required
04/22/2020
THIRD FLOOR
Corrective Action Required
04/22/2020
FOURTH FLOOR
Corrective Action Required
04/22/2020
Rated Assembly Inspection Partial 6/12/2020 6/12/2020 06/12/2020
STAIR TOWER 1
Partial Correction
04/13/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER
STAIR TOWER 2
Partial Correction
04/13/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER 4TH FLOOR:
ELEVATOR 1
Corrective Action Required
04/13/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING -
FIRST FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK -
SECOND FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK -
THIRD FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK -
FOURTH FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK -
Rated Assembly Inspection Partial 6/15/2020 6/15/2020 06/15/2020
STAIR TOWER 1
Partial Correction
06/12/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4TH FLOOR 1ST AND 2ND LAYER WALLS
STAIR TOWER 2
Partial Correction
06/12/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS 4TH FLOOR FLOOR 1ST AND 2ND LAYER WALLS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR:
ELEVATOR 1
Corrective Action Required
06/12/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER
FIRST FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK -
SECOND FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK -
THIRD FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK -
FOURTH FLOOR
Corrective Action Required
06/12/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK -
Rated Assembly Inspection Partial 6/18/2020 6/18/2020 06/18/2020
STAIR TOWER 1
Partial Correction
06/15/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER
STAIR TOWER 2
Partial Correction
06/15/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR:
ELEVATOR 1
Corrective Action Required
06/15/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER
FIRST FLOOR
Corrective Action Required
06/15/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/15/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/15/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/15/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4
Above Ceiling Inspection Partial 6/19/2020 6/19/2020 06/19/2020
Miscellaneous Correction
Corrective Action Required
06/19/2020
-ABOVE CEILING FOR FRAMING AND SPRINKLER HEADS 4TH FLOOR PATIOS
All Rough Inspection - Commercial Partial 6/22/2020 6/22/2020 06/22/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/05/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
06/05/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS
STAIR TOWER 2
Corrective Action Required
06/05/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS
LOWER LEVEL
Corrective Action Required
06/05/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM
FIRST FLOOR
Corrective Action Required
06/05/2020
SECOND FLOOR
Corrective Action Required
06/05/2020
THIRD FLOOR
Corrective Action Required
06/05/2020
FOURTH FLOOR
Corrective Action Required
06/05/2020
Rated Assembly Inspection Partial 6/22/2020 06/22/2020
STAIR TOWER 1
Partial Correction
06/18/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER
STAIR TOWER 2
Partial Correction
06/18/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR:
ELEVATOR 1
Corrective Action Required
06/18/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/18/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/18/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/18/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/18/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4
Rated Assembly Inspection Partial 6/23/2020 06/23/2020
STAIR TOWER 1
Partial Correction
06/22/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER
STAIR TOWER 2
Partial Correction
06/22/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER
ELEVATOR 1
Corrective Action Required
06/22/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/22/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/22/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/22/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/22/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4
Rated Assembly Inspection Partial 6/24/2020 6/24/2020 06/24/2020
STAIR TOWER 1
Partial Correction
06/23/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER
STAIR TOWER 2
Partial Correction
06/23/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER
ELEVATOR 1
Corrective Action Required
06/23/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/23/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/23/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/23/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/23/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
06/24/2020
-ELEVATOR EQUIPMENT ROOM 1ST LAYER WALLS -DATA ROOM 1ST LAYER WALLS -ELECTRICAL/DATA ROOM 1ST LAYER WALLS
Rated Assembly Inspection Partial 6/26/2020 6/26/2020 06/26/2020
STAIR TOWER 1
Partial Correction
06/24/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS
STAIR TOWER 2
Partial Correction
06/24/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS
ELEVATOR 1
Corrective Action Required
06/24/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/24/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/24/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/24/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/24/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS
LOWER LEVEL
Corrective Action Required
06/24/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS
Rated Assembly Inspection Partial 6/29/2020 6/29/2020 06/29/2020
STAIR TOWER 1
Partial Correction
06/26/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
06/26/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
06/26/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/26/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4
SECOND FLOOR
Corrective Action Required
06/26/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6
THIRD FLOOR
Corrective Action Required
06/26/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/26/2020
- BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS
LOWER LEVEL
Corrective Action Required
06/26/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS
All Rough Inspection - Commercial Partial 6/29/2020 6/29/2020 06/29/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/22/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
06/22/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
06/22/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
06/22/2020
FIRST FLOOR
Corrective Action Required
06/22/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
06/22/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
06/22/2020
SHEAR WALL 4 ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
06/22/2020
SHEAR WALL 4 ALL TRADES COMPLETE
All Rough Inspection - Commercial Partial 7/6/2020 7/6/2020 07/06/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/29/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
06/29/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
06/29/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
06/29/2020
FIRST FLOOR
Corrective Action Required
06/29/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
06/29/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
06/29/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
06/29/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
Rated Assembly Inspection Partial 7/6/2020 7/6/2020 07/06/2020
STAIR TOWER 1
Partial Correction
06/29/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
06/29/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
06/29/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
06/29/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS
SECOND FLOOR
Corrective Action Required
06/29/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
THIRD FLOOR
Corrective Action Required
06/29/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
06/29/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
LOWER LEVEL
Corrective Action Required
06/29/2020
Sprinkler - Hydrostatic Test Passed 7/8/2020 07/08/2020
All Rough Inspection - Commercial Partial 7/13/2020 7/13/2020 07/13/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/06/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/06/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/06/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/06/2020
FIRST FLOOR
Corrective Action Required
07/06/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
07/06/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/06/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/06/2020
4TH FLOOR COMPLETE
All Rough Inspection - Commercial Partial 7/14/2020 7/14/2020 07/14/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/13/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/13/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/13/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/13/2020
FIRST FLOOR
Corrective Action Required
07/13/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
07/13/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/13/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/13/2020
4TH FLOOR COMPLETE
Rated Assembly Inspection Partial 7/16/2020 07/16/2020
STAIR TOWER 1
Partial Correction
07/06/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/06/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/06/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/06/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS
SECOND FLOOR
Corrective Action Required
07/06/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
THIRD FLOOR
Corrective Action Required
07/06/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
FOURTH FLOOR
Corrective Action Required
07/06/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE
LOWER LEVEL
Corrective Action Required
07/06/2020
All Rough Inspection - Commercial Partial 7/16/2020 07/16/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/14/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/14/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/14/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/14/2020
FIRST FLOOR
Corrective Action Required
07/14/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
07/14/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/14/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/14/2020
4TH FLOOR COMPLETE
Rated Assembly Inspection Partial 7/17/2020 7/17/2020 07/17/2020
STAIR TOWER 1
Partial Correction
07/16/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/16/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/16/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/16/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS
SECOND FLOOR
Corrective Action Required
07/16/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR
THIRD FLOOR
Corrective Action Required
07/16/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
FOURTH FLOOR
Corrective Action Required
07/16/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE
LOWER LEVEL
Corrective Action Required
07/16/2020
Rated Assembly Inspection Partial 7/21/2020 07/21/2020
STAIR TOWER 1
Partial Correction
07/17/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/17/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/17/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/17/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM
SECOND FLOOR
Corrective Action Required
07/17/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
THIRD FLOOR
Corrective Action Required
07/17/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
FOURTH FLOOR
Corrective Action Required
07/17/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE
LOWER LEVEL
Corrective Action Required
07/17/2020
All Rough Inspection - Commercial Partial 7/21/2020 07/21/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/16/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/16/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/16/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/16/2020
FIRST FLOOR
Corrective Action Required
07/16/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE -G19 AND G1 INCOMPLETE -INCOMPLETE TRAPS AT SHOWERS IN 101,107,109,111,115,117
SECOND FLOOR
Corrective Action Required
07/16/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/16/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/16/2020
4TH FLOOR COMPLETE
Rated Assembly Inspection Partial 7/22/2020 07/22/2020
STAIR TOWER 1
Partial Correction
07/21/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/21/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/21/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/21/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM
SECOND FLOOR
Corrective Action Required
07/21/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
THIRD FLOOR
Corrective Action Required
07/21/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
FOURTH FLOOR
Corrective Action Required
07/21/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/21/2020
Rated Assembly Inspection Partial 7/23/2020 7/23/2020 07/23/2020
STAIR TOWER 1
Partial Correction
07/22/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/22/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/22/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/22/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM
SECOND FLOOR
Corrective Action Required
07/22/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
THIRD FLOOR
Corrective Action Required
07/22/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/22/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/22/2020
Rated Assembly Inspection Partial 7/24/2020 7/24/2020 07/24/2020
STAIR TOWER 1
Partial Correction
07/23/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/23/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/23/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/23/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING —MISSING G1,G19
SECOND FLOOR
Corrective Action Required
07/23/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE
THIRD FLOOR
Corrective Action Required
07/23/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/23/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/23/2020
Rated Assembly Inspection Partial 7/27/2020 07/27/2020
STAIR TOWER 1
Partial Correction
07/24/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/24/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/24/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/24/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING -FIRST, SECOND, THIRD LAYER AND HAT CHANNEL ELEVATOR EQUIPMENT ROOM —MISSING G1,G19
SECOND FLOOR
Corrective Action Required
07/24/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
THIRD FLOOR
Corrective Action Required
07/24/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/24/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/24/2020
All Rough Inspection - Commercial Partial 7/30/2020 07/30/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/21/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/21/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/21/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/21/2020
FIRST FLOOR
Corrective Action Required
07/21/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE -INCOMPLETE TRAPS AT SHOWERS IN 101, 103, 107,109,111,115,117 -INCOMPLETE TRAPS IN CORRIDOR OUTSIDE OF G2, G8, G12, AND IN S13
SECOND FLOOR
Corrective Action Required
07/21/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/21/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/21/2020
4TH FLOOR COMPLETE
Rated Assembly Inspection Partial 7/30/2020 7/30/2020 07/30/2020
STAIR TOWER 1
Partial Correction
07/27/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/27/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/27/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/27/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING -FIRST, SECOND, THIRD, FOURTH LAYER AND HAT CHANNEL ELEVATOR EQUIPMENT ROOM -DRYWALL SCREW PATTERN WALLS AND CEILINGS EXCEPT WHERE NOTED: -G1, G19 INCOMPLETE -AROUND TRAPS AT 101,103,107, 109, 111, 115, 117, S13, AND IN CORRIDOR OUTSIDE OF G2, G8, G12
SECOND FLOOR
Corrective Action Required
07/27/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
THIRD FLOOR
Corrective Action Required
07/27/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/27/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/27/2020
Rated Assembly Inspection Partial 7/31/2020 07/31/2020
STAIR TOWER 1
Partial Correction
07/30/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/30/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/30/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/30/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING COMPLETE -FIRST, SECOND, THIRD, FOURTH LAYER AND HAT CHANNEL ELEVATOR EQUIPMENT ROOM -DRYWALL SCREW PATTERN WALLS AND CEILINGS EXCEPT WHERE NOTED: -G1, G19 INCOMPLETE -AROUND TRAPS AT 101,103,107, 109, 111, 115, 117, S13, AND IN CORRIDOR OUTSIDE OF G2, G8, G12
SECOND FLOOR
Corrective Action Required
07/30/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
THIRD FLOOR
Corrective Action Required
07/30/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/30/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/30/2020
Rated Assembly Inspection Partial 8/3/2020 08/03/2020
STAIR TOWER 1
Partial Correction
07/31/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Partial Correction
07/31/2020
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Corrective Action Required
07/31/2020
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Corrective Action Required
07/31/2020
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING COMPLETE -FIRST, SECOND, THIRD, FOURTH LAYER AND HAT CHANNEL ELEVATOR EQUIPMENT ROOM -DRYWALL SCREW PATTERN WALLS AND CEILINGS EXCEPT WHERE NOTED: -AROUND TRAPS AT 101,103,107, 109, 111, 115, 117, S13, AND IN CORRIDOR OUTSIDE OF G2, G8, G12
SECOND FLOOR
Corrective Action Required
07/31/2020
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
THIRD FLOOR
Corrective Action Required
07/31/2020
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Corrective Action Required
07/31/2020
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Corrective Action Required
07/31/2020
Above Ceiling Inspection Partial 8/4/2020 08/04/2020
Miscellaneous Correction
Corrective Action Required
06/19/2020
-ABOVE CEILING FOR FRAMING AND SPRINKLER HEADS 4TH FLOOR PATIOS -FUR DOWN FRAMING AND FIRE CAULK ON 4TH FLOOR UNITS AND G1 AND G19 GARAGES
Above Ceiling Inspection Partial 8/10/2020 8/10/2020 08/10/2020
Miscellaneous Correction
Resolved
02/01/2021
-ABOVE CEILING FOR FRAMING AND SPRINKLER HEADS 4TH FLOOR PATIOS -FUR DOWN FRAMING AND FIRE CAULK ON 4TH FLOOR UNITS AND G1 AND G19 GARAGES -P TRAPS AND FIRE CAULKING TO COMPLETE MEP ON 1ST FLOOR
All Rough Inspection - Commercial Passed 8/10/2020 8/10/2020 08/10/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/30/2020
EXTERIOR SHEAR WALL X, Elevator walls,ceiling.
STAIR TOWER 1
Corrective Action Required
07/30/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
STAIR TOWER 2
Corrective Action Required
07/30/2020
ROUGH FRAMING 0-4TH FLOOR ROUGH FRAMING AND ELECTRICAL IN CEILINGS ALL TRADES ON STAIRWELL WALL ASSEMBLY
LOWER LEVEL
Corrective Action Required
07/30/2020
FIRST FLOOR
Corrective Action Required
07/30/2020
ROUGH FRAMING IN WALLS FRO DATA ROOM, ELEVATOR MECH. ROOM, AND ELECTRICAL DATA ROOM SHEAR WALLS 2,4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
SECOND FLOOR
Corrective Action Required
07/30/2020
SHEAR WALL 4 AND 6 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
THIRD FLOOR
Corrective Action Required
07/30/2020
SHEAR WALL 4 ALL TRADES COMPLETE PORCHES ALL TRADES COMPLETE ALL TRADES COMPLETE
FOURTH FLOOR
Corrective Action Required
07/30/2020
4TH FLOOR COMPLETE
Electrical Service Inspection Partial 8/11/2020 8/11/2020 at 10:30 AM 08/11/2020
Misc
Partial Correction
10/30/2019
-RELEASE SERVICE AT THREE TEMPORARY POST-MOUNTED SERVICES LABELED 901A, 901B, 901C CORRECTION: -ADJUST THE WEST SERVICE OVERCURRENT DEVICE TO 1000 AMP. THE EAST SIDE SERVICE IS OK
Electrical Service Inspection Passed 8/12/2020 8/12/2020 08/12/2020
Misc
Resolved
08/12/2020
-RELEASE SERVICE AT THREE TEMPORARY POST-MOUNTED SERVICES LABELED 901A, 901B, 901C CORRECTION: -ADJUST THE WEST SERVICE OVERCURRENT DEVICE TO 1000 AMP. THE EAST SIDE SERVICE IS OK
Alarm Test Passed 1/5/2021 01/05/2021
Sprinkler - Flow Test Passed 1/5/2021 01/05/2021
Miscellaneous Inspection Failed 1/15/2021 1/15/2021 01/15/2021
Miscellaneous Correction
Corrective Action Required
01/15/2021
905 ward BLDG # 5 4th Floor Fire extinguisher cabinets 415 deadbolt entry fully extend, seal mech closet ceiling 413 broken window bedroom, 411 ok 409 ok 407 fire caulk ceiling mech room, AFCI won't trip, 405 open box bedroom provide cover plate, interconnect smoke detectors 403 patch drywall mech closet sprinkler head, Cover plate open box bedrooms 400 ? Provide deadbolts, provide cover plates open boxes bedrooms, anti tip device range 401 ? Provide GFCI PROTECTION OUTLET UNDER WINDOW LESS THAN 6' FROM SINK 414 smokes not interlinked 412 410 no range/ anti tip device 408 door close/latch 406 404 deck railing incomplete 402 door close/latch, smokes not interconnected
Rated Assembly Inspection Passed 2/1/2021 02/01/2021
STAIR TOWER 1
Resolved
02/01/2021
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT STAIRS: WELL FACE,3RD FL 1ST LAYER,4TH, STAIR #1: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS; 3rd FLOOR 1ST LAYER,2ND LAYER 4th FLOOR WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
STAIR TOWER 2
Resolved
02/01/2021
STAIR #2: WELL FACE + BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLR 1ST & 2ND LAYERS WELL FACE,3RD FL 1ST LAYER,4TH 4TH FLOOR: WALLS AND CEILING 1ST LAYER, 2ND LAYER 3rd LAYER and HAT ON CEILINGS 4TH LAYER ON UPPER AND LOWER CEILINGS
ELEVATOR 1
Resolved
02/01/2021
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLY AT ELEVATOR: PRE-ROCK @ BACKSIDE ABV CLG: 1ST FLOOR 1ST & 2ND LAYERS 2ND FLOOR 1ST & 2ND LAYERS 3RD FLOOR: 1ST LAYER;2ND LAYERS - ELEVATOR SHAFT - - FIRST LAYER ALL FLOORS & CEILING - -2ND LAYER -THIRD LAYER AND HAT CHANNEL CEILING -FOURTH LAYER CEILING
FIRST FLOOR
Resolved
02/01/2021
- BEHIND TUBS/SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT CORRIDOR WALLS AND SHEAR WALL4 -FIRST LAYER CORRIDOR WALLS, STAIRWELL WALLS AND ELEVATORS WALLS -FIRST LAYER MECHANICAL ROOM AND ELEVATOR EQUIPMENT ROOM -RC CHANNEL WALLS AND CEILING COMPLETE -FIRST, SECOND, THIRD, FOURTH LAYER AND HAT CHANNEL ELEVATOR EQUIPMENT ROOM -DRYWALL SCREW PATTERN WALLS AND CEILINGS EXCEPT WHERE NOTED: -AROUND TRAPS AT 101,103,107, 109, 111, 115, 117, S13, AND IN CORRIDOR OUTSIDE OF G2, G8, G12
SECOND FLOOR
Resolved
02/01/2021
- BEHIND TUBS/SHOWERS 1ST LAYER/ FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, ELEVATOR WALLS, SHEAR WALLS 4 AND 6 -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
THIRD FLOOR
Resolved
02/01/2021
- BEHIND TUBS/ SHOWERS 1ST LAYER FIRE CAULK - -SECOND LAYER BEHIND TUBS/SHOWERS AT STAIRWELLS, AND ELEVATOR -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILINGS COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILINGS
FOURTH FLOOR
Resolved
02/01/2021
-ELEVATOR EQUIPMENT ROOM 1ST AND 2ND LAYER WALLS -DATA ROOM 1ST AND 2ND LAYER WALLS -ELECTRICAL/DATA ROOM 1ST AND 2ND LAYER WALLS - BEHIND TUBS/SHOWERS 1ST LAYER / FIRE CAULK - -SECOND LAYER BEHIND TUBS AND SHOWERS AT STAIRWELLS, ELEVATOR AND SHEAR WALL 4 -1ST AND 2ND LAYER MECHANICAL ROOMS WALLS AND CEILING 3rd LAYER AND HAT ON CEILING IN MECHANICAL ROOMS 4TH LAYER ON CEILING IN MECHANICAL ROOMS -FIRST LAYER BEHIND STAIRWELLS AND ELEVATOR -RC CHANNEL WALLS AND CEILING COMPLETE -DRYWALL SCREW PATTERN COMPLETE WALLS AND CEILING
LOWER LEVEL
Resolved
02/01/2021
Above Ceiling Inspection Passed 2/1/2021 02/01/2021
Miscellaneous Correction
Resolved
02/01/2021
-ABOVE CEILING FOR FRAMING AND SPRINKLER HEADS 4TH FLOOR PATIOS -FUR DOWN FRAMING AND FIRE CAULK ON 4TH FLOOR UNITS AND G1 AND G19 GARAGES -P TRAPS AND FIRE CAULKING TO COMPLETE MEP ON 1ST FLOOR
Miscellaneous Inspection Failed 2/1/2021 2/1/2021 02/01/2021
Miscellaneous Correction
Resolved
02/01/2021
905 ward BLDG # 5 4th Floor Fire extinguisher cabinets 415 deadbolt entry fully extend, seal mech closet ceiling 413 broken window bedroom, 411 ok 409 ok 407 fire caulk ceiling mech room, AFCI won't trip, 405 open box bedroom provide cover plate, interconnect smoke detectors 403 patch drywall mech closet sprinkler head, Cover plate open box bedrooms 400 ? Provide deadbolts, provide cover plates open boxes bedrooms, anti tip device range 401 ? Provide GFCI PROTECTION OUTLET UNDER WINDOW LESS THAN 6' FROM SINK 414 smokes not interlinked 412 410 no range/ anti tip device 408 door close/latch 406 404 deck railing incomplete 402 door close/latch, smokes not interconnected
Misc
Corrective Action Required
02/01/2021
> 4TH FLOOR > Fire extinguisher cabinets. > 407, AFCI won't trip. > 400-, anti-tip device range. > 414 smokes not interlinked. > 410 no range/ anti tip device. > 404 deck railing incomplete. > 402 , smokes not interconnected. 3RD FLOOR 317 entry deadbolt won't throw . 316 combo smoke/CO detectors outside of bedrooms. 315 entry deadbolt won't fully extend . 314 door doesn’t self-close and latch , patch hole at exterior sprinkler head. 313 deadbolt won't fully extend. 312 range not on anti-tip device. 311 entry door shall be self-closing & latching, deadbolt won't fully extend . 310 Door doesn’t self-close and latch. 309 ok. 308 dead bolt doesn’t throw properly, cover plate in bathroom. 307 deadbolt won't fully extend, secure guardrail on deck . 305 deck door won't latch, entry db won't fully extend . 304 door doesn’t self-close and latch, missing railing. 303 deck deadbolt won't throw, GFCI between refer & range hot neutral reversed, entry db won't fully extend. 301 entry door shall be self-closing & latching, db won't fully extend, fire caulk line set mech closet, remove dust covers smokes, GFCI between refer & range bad. 300 combo smoke/ Co detector outside of bedroom, place range on anti-tip device 2ND FLOOR 217 combo alarm outside of bedrooms 216 no access 209-215 entry door shall be self-closing & latching Corridor room HVAC rooms: 3m pillows in the conduit HVAC closet left of elevator. 1ST FLOOR HVAC room- check fire wall for vent over door. Either install approved fire damper or restore firewall. Verify on plans. Exiting the 1st floor corridor East & west ends , door swing is incorrect and missing exit signs . Verify correction on plans. 101-117 missing appliances, check smoke detectors. G6- uncover heads G7,S5, G9 locked. G10- garage door switch missing. G11locked. 204,304,404 (missing rail for construction ) Water heater room left of elevator seal penetrations through ceiling , Install 3m pillows in conduit @ ceiling. West data room- install Steel conduit At ceiling for google and low voltage data penetrating ceiling and caulk . Inspect roof top at re-inspection, check labeling of doors , signage, west electrical meter bank for labels.
Occupancy Inspection - Water Utilities Passed 2/8/2021 02/08/2021
Occupancy Inspection - Planning Passed 2/11/2021 02/11/2021
Occupancy Inspection - Codes Commercial Failed 2/11/2021 2/11/2021 02/11/2021
Miscellaneous Correction
Corrective Action Required
02/11/2021
3RD FLOOR 307 secure guardrail on deck  304 missing railing. 2ND FLOOR 204 missing railing 1ST FLOOR 113 electrical wire at microwave/hood G10- garage door switch missing. G11-garage door switch missing G6- covered sprinkler heads Riser room -seal penetration roof top-remove trash Secure stairwell windows  
Miscellaneous Correction
Corrective Action Required
02/11/2021
3RD FLOOR 307 secure guardrail on deck  304 missing railing. 2ND FLOOR 204 missing railing 1ST FLOOR 113 electrical wire at microwave/hood G10- garage door switch missing. G11-garage door switch missing G6- covered sprinkler heads Riser room -seal penetration roof top-remove trash Secure stairwell windows  
Occupancy Inspection - Engineering Passed 2/11/2021 02/11/2021
Occupancy Inspection - Fire Passed 2/11/2021 02/11/2021
Occupancy Inspection - Codes Commercial Full C of O 2/12/2021 2/12/2021 02/12/2021
Miscellaneous Correction
Resolved
02/12/2021
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Receipt Receipt for transaction: 2018-007174
09/30/2019 Letter DS Building Permit
10/30/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter Codes Plan Review Conditions
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/22/2020 Letter INSPECTION SUMMARY
07/23/2020 Letter INSPECTION SUMMARY
07/24/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
08/03/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/12/2020 Letter INSPECTION SUMMARY
01/05/2021 Letter Fire Loss Reduction Form
01/11/2021 Letter INSPECTION SUMMARY
01/11/2021 Letter INSPECTION SUMMARY
01/11/2021 Letter Fire Loss Reduction Form
01/15/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter Fire (Alarm) Plan Review Notice
02/11/2021 Letter Fire (Sprinkler) Plan Review
02/11/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter Fire Loss Reduction Form
02/12/2021 Letter Codes Final Certificate of Occupancy
02/12/2021 Letter Field Certificate of Occupancy
02/16/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home