Summary
PRCOM20182611
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
4 STORY APARTMENT BUILDING *FOUNDATION PERMIT - PRCOM20183265
08/14/2018
09/30/2019
01/14/2021
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 12/22/2020
Michael Weissenbach
Alarm Plan Review Released for Construction 12/22/2020
Michael Weissenbach
Special Inspections Review Approved 11/09/2018
Mike Weisenborn
Licensed Contractors Approved 02/28/2019 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $25,959.21 $25,959.21 Paid 11/09/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 10/30/2019 10/30/2019 at 10:40 AM 10/30/2019
Misc
Partial Correction
10/30/2019
RELEASE SERVICE AT TWO TEMPORARY POST-MOUNTED SERVICES LABELED 901A, 901B
All Rough Inspection - Commercial Partial 11/21/2019 11/21/2019 at 9:55 AM 11/21/2019
Misc
Partial Correction
11/21/2019
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR BOTH STAIRWELLS;
All Rough Inspection - Commercial Partial 11/21/2019 at 11:15 AM 11/21/2019
Misc
Partial Correction
11/21/2019
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS;
Rated Assembly Inspection Partial 11/22/2019 11/22/2019 at 6:55 AM 11/25/2019
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: EAST STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL: 1ST LAYER AT JOIST SPACES ONLY; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS AT: BASEMENT LEVEL: 1ST LAYER AT JOIST SPACES ONLY; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 11/25/2019 at 7:10 AM 11/25/2019
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: EAST STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL: 2 LAYERS AT JOIST SPACES ONLY; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT WALLS AT: BASEMENT LEVEL: 2 LAYERS AT JOIST SPACES ONLY; 1ST FLOOR: 1ST LAYER AT JOIST SPACES ONLY; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 12/5/2019 12/5/2019 at 3:45 PM 12/05/2019
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS: SPACES BETWEEN JOISTS AT BACKSIDE: EAST STAIRWELL: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Misc
Partial Correction
11/25/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 12/10/2019 12/10/2019 at 3:10 PM 12/10/2019
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & SPACES BETWEEN JOISTS AT BACKSIDE: EAST STAIRWELL #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL #2: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BACKSIDE BETWEEN TRUSS JOISTS: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 1/3/2020 1/3/2020 at 2:25 PM 01/03/2020
Misc
Partial Correction
11/21/2019
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR;
Rated Assembly Inspection Partial 1/9/2020 1/9/2020 at 1:55 PM 01/09/2020
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & SPACES BETWEEN JOISTS AT BACKSIDE: EAST STAIRWELL #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL #2: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR:
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BACKSIDE BETWEEN TRUSS JOISTS: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 1/24/2020 1/24/2020 at 9:25 AM 01/24/2020
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & BACKSIDE PRE-ROCK BETWEEN JOISTS: EAST STAIRWELL #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL #2: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR:
Misc
Partial Correction
01/09/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BETWEEN TRUSS JOISTS: BASEMENT LEVEL: BACKSIDE PRE-ROCK 2 LAYERS 1ST FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 2ND FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 2/25/2020 2/25/2020 at 11:40 AM 02/25/2020
Misc
Partial Correction
01/03/2020
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; 3RD FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR;
Rated Assembly Inspection Partial 3/12/2020 3/12/2020 03/12/2020
Misc
Resolved
03/12/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & BACKSIDE PRE-ROCK BETWEEN JOISTS: EAST STAIRWELL #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR: WEST STAIRWELL #2: BASEMENT LEVEL: 2 LAYERS 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR:
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
01/24/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BETWEEN TRUSS JOISTS: BASEMENT LEVEL: BACKSIDE PRE-ROCK 2 LAYERS 1ST FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 2ND FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 3RD FLOOR: BACKSIDE PREROCK1ST 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/12/2020
EAST STAIRWELL OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & BACKSIDE PRE-ROCK BETWEEN JOISTS: #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1STLAYER; 4TH FLOOR:
STAIR TOWER 2
Corrective Action Required
03/12/2020
WEST- EAST STAIRWELL #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 4TH FLOOR:
Rated Assembly Inspection Partial 3/25/2020 at 12:50 PM 03/25/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/12/2020
STAIR TOWER 1
Partial Correction
03/25/2020
EAST STAIRWELL OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & BACKSIDE PRE-ROCK BETWEEN JOISTS: #1: BASEMENT LEVEL: 1ST LAYER; 2ND LAYER 1ST FLOOR: 2ND LAYER 2ND FLOOR: 2ND LAYER 3RD FLOOR: 2ND LAYER 4TH FLOOR: **BACKSIDE PRE-ROCK BETWEEN TRUSS-2ND LAYER DONE AT THE SAME TIME AS WALL
STAIR TOWER 2
Partial Correction
03/25/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLS INSIDE FACE & BACKSIDE PRE-ROCK BETWEEN JOISTS: BASEMENT LEVEL: 2ND LAYER 1ST FLOOR: 2ND LAYER 2ND FLOOR: 2ND LAYER 3RD FLOOR: 2ND LAYER 4TH FLOOR: **BACKSIDE PRE-ROCK BETWEEN TRUSS-2ND LAYER DONE AT THE SAME TIME AS WALL
ELEVATOR 1
Partial Correction
03/25/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: BETWEEN TRUSS JOISTS: BASEMENT LEVEL: BACKSIDE PRE-ROCK 2 LAYERS 1ST FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 2ND FLOOR: BACKSIDE PRE-ROCK 2 LAYERS 3RD FLOOR: BACKSIDE PREROCK 2 LAYERS 4TH FLOOR:
All Rough Inspection - Commercial Partial 4/1/2020 04/01/2020
Misc
Partial Correction
02/25/2020
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; 3RD FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR; ROOF DECK AND SHEAR WALLS EXTERIOR
All Rough Inspection - Commercial Partial 4/27/2020 4/27/2020 04/27/2020
Misc
Partial Correction
04/01/2020
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; 3RD FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR; ROOF DECK AND SHEAR WALLS EXTERIOR
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/27/2020
>>FRAMING OK TO COVER INSIDE FACE: 0-4TH FLOORS ON ELEVATOR STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.
All Rough Inspection - Commercial Partial 4/30/2020 04/30/2020
Misc
Partial Correction
04/27/2020
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; 3RD FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR; ROOF DECK AND SHEAR WALLS EXTERIOR
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/27/2020
>>FRAMING OK TO COVER INSIDE FACE: 0-4TH FLOORS ON ELEVATOR STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.
FOURTH FLOOR
Corrective Action Required
04/30/2020
THIRD FLOOR
Corrective Action Required
04/30/2020
SECOND FLOOR
Corrective Action Required
04/30/2020
FIRST FLOOR
Corrective Action Required
04/30/2020
LOWER LEVEL
Corrective Action Required
04/30/2020
ROGU FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.
Rated Assembly Inspection Partial 4/30/2020 4/30/2020 04/30/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
03/25/2020
STAIR TOWER 1
Partial Correction
03/25/2020
4TH FLOOR 1ST LAYER;
STAIR TOWER 2
Partial Correction
03/25/2020
4TH FLOOR 1ST LAYER;
ELEVATOR 1
Partial Correction
03/25/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER
FOURTH FLOOR
Corrective Action Required
04/30/2020
THIRD FLOOR
Corrective Action Required
04/30/2020
SECOND FLOOR
Corrective Action Required
04/30/2020
FIRST FLOOR
Corrective Action Required
04/30/2020
LOWER LEVEL
Corrective Action Required
04/30/2020
Rated Assembly Inspection Partial 5/4/2020 5/4/2020 05/04/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/30/2020
STAIR TOWER 1
Partial Correction
04/30/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER -
STAIR TOWER 2
Partial Correction
04/30/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 -
ELEVATOR 1
Partial Correction
04/30/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER -
FOURTH FLOOR
Corrective Action Required
04/30/2020
THIRD FLOOR
Corrective Action Required
04/30/2020
SECOND FLOOR
Corrective Action Required
04/30/2020
FIRST FLOOR
Corrective Action Required
04/30/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
04/30/2020
All Rough Inspection - Commercial Partial 5/6/2020 05/06/2020
Misc
Resolved
05/06/2020
OK TO COVER AT STAIRWELLS WALL FRAMING INSIDE FACE AND BACKSIDE BETWEEN TRUSSES AT: BASEMENT, BOTH STAIRWELLS; 1ST FLOOR, BOTH STAIRWELLS; 2ND FLOOR, BOTH STAIRWELLS; 3RD FLOOR, BOTH STAIRWELLS; OK TO COVER ELEVATOR SHAFT FRAMING AT BACKSIDE BETWEEN TRUSSES AT: 1ST FLOOR; 2ND FLOOR; ROOF DECK AND SHEAR WALLS EXTERIOR
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/30/2020
>>FRAMING OK TO COVER INSIDE FACE: 0-4TH FLOORS ON ELEVATOR STAIR TOWERS : 4TH FLOOR CEILING AND WALLS. TUB/SHOWER-4,3RD,
FOURTH FLOOR
Corrective Action Required
04/30/2020
THIRD FLOOR
Corrective Action Required
04/30/2020
SECOND FLOOR
Corrective Action Required
04/30/2020
FIRST FLOOR
Corrective Action Required
04/30/2020
LOWER LEVEL
Corrective Action Required
04/30/2020
ROGU FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.
All Rough Inspection - Commercial Partial 5/7/2020 05/07/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/06/2020
>>FRAMING OK TO COVER INSIDE FACE: 0-4TH FLOORS ON ELEVATOR STAIR TOWERS : 4TH FLOOR CEILING AND WALLS. TUB/SHOWER-4,3RD, 2nd-1st
FOURTH FLOOR
Corrective Action Required
05/06/2020
THIRD FLOOR
Corrective Action Required
05/06/2020
SECOND FLOOR
Corrective Action Required
05/06/2020
FIRST FLOOR
Corrective Action Required
05/06/2020
LOWER LEVEL
Corrective Action Required
05/06/2020
ROGU FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.
LOWER LEVEL
Resolved
05/07/2020
STAIR TOWER 1
Corrective Action Required
05/14/2020
Rated Assembly Inspection Partial 5/12/2020 05/12/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/04/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4
STAIR TOWER 1
Partial Correction
05/04/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER -
STAIR TOWER 2
Partial Correction
05/04/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 -
ELEVATOR 1
Partial Correction
05/04/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER -
FOURTH FLOOR
Partial Correction
05/12/2020
THIRD FLOOR
Corrective Action Required
05/04/2020
SECOND FLOOR
Corrective Action Required
05/04/2020
FIRST FLOOR
Corrective Action Required
05/04/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/04/2020
Rated Assembly Inspection Partial 5/14/2020 5/14/2020 05/14/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/12/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2
STAIR TOWER 1
Partial Correction
05/12/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER -
STAIR TOWER 2
Partial Correction
05/12/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 -
ELEVATOR 1
Partial Correction
05/12/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER -
FOURTH FLOOR
Partial Correction
05/12/2020
THIRD FLOOR
Corrective Action Required
05/12/2020
SECOND FLOOR
Corrective Action Required
05/12/2020
FIRST FLOOR
Corrective Action Required
05/12/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/12/2020
Rated Assembly Inspection Partial 5/18/2020 5/18/2020 05/18/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/14/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2
STAIR TOWER 1
Partial Correction
05/14/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER-
STAIR TOWER 2
Partial Correction
05/14/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER
ELEVATOR 1
Partial Correction
05/14/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL
FOURTH FLOOR
Partial Correction
05/14/2020
THIRD FLOOR
Corrective Action Required
05/14/2020
SECOND FLOOR
Corrective Action Required
05/14/2020
FIRST FLOOR
Corrective Action Required
05/14/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/14/2020
All Rough Inspection - Commercial Partial 5/18/2020 5/18/2020 05/18/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/07/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
05/07/2020
THIRD FLOOR
Corrective Action Required
05/07/2020
SECOND FLOOR
Corrective Action Required
05/07/2020
FIRST FLOOR
Corrective Action Required
05/07/2020
LOWER LEVEL
Corrective Action Required
05/07/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4-
Rated Assembly Inspection Partial 5/20/2020 5/20/2020 05/20/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/18/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2
STAIR TOWER 1
Partial Correction
05/18/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING
STAIR TOWER 2
Partial Correction
05/18/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING
ELEVATOR 1
Partial Correction
05/18/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
05/18/2020
THIRD FLOOR
Corrective Action Required
05/18/2020
SECOND FLOOR
Corrective Action Required
05/18/2020
FIRST FLOOR
Corrective Action Required
05/18/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/18/2020
Rated Assembly Inspection Partial 5/26/2020 5/26/2020 05/26/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/20/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL 4TH FLOOR
STAIR TOWER 1
Partial Correction
05/20/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL 4TH LAYER CEILING
STAIR TOWER 2
Partial Correction
05/20/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL 4TH LAYER CEILING
ELEVATOR 1
Partial Correction
05/20/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
05/20/2020
THIRD FLOOR
Corrective Action Required
05/20/2020
SECOND FLOOR
Corrective Action Required
05/20/2020
FIRST FLOOR
Corrective Action Required
05/20/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/20/2020
Sprinkler - Hydrostatic Test Passed 06/02/2020
All Rough Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/18/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
05/18/2020
All trades complete
THIRD FLOOR
Corrective Action Required
05/18/2020
SECOND FLOOR
Corrective Action Required
05/18/2020
FIRST FLOOR
Corrective Action Required
05/18/2020
LOWER LEVEL
Corrective Action Required
05/18/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4-
All Rough Inspection - Commercial Partial 6/3/2020 6/3/2020 06/03/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/02/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
06/02/2020
All trades complete
THIRD FLOOR
Corrective Action Required
06/02/2020
All trades complete
SECOND FLOOR
Corrective Action Required
06/02/2020
FIRST FLOOR
Corrective Action Required
06/02/2020
LOWER LEVEL
Corrective Action Required
06/02/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4-
All Rough Inspection - Commercial Partial 6/4/2020 6/4/2020 06/04/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/03/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
06/03/2020
All trades complete
THIRD FLOOR
Corrective Action Required
06/03/2020
All trades complete
SECOND FLOOR
Corrective Action Required
06/03/2020
ALL TRADES COMPLETE
FIRST FLOOR
Corrective Action Required
06/03/2020
LOWER LEVEL
Corrective Action Required
06/03/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4-
All Rough Inspection - Commercial Partial 6/5/2020 6/5/2020 06/05/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/04/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
06/04/2020
All trades complete
THIRD FLOOR
Corrective Action Required
06/04/2020
All trades complete
SECOND FLOOR
Corrective Action Required
06/04/2020
ALL TRADES COMPLETE
FIRST FLOOR
Corrective Action Required
06/04/2020
ALL TRADES COMPLETE
LOWER LEVEL
Corrective Action Required
06/04/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4-
Rated Assembly Inspection Partial 6/8/2020 6/8/2020 06/08/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/26/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR
STAIR TOWER 1
Partial Correction
05/26/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
05/26/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
05/26/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
05/26/2020
THIRD FLOOR
Corrective Action Required
05/26/2020
SECOND FLOOR
Corrective Action Required
05/26/2020
FIRST FLOOR
Corrective Action Required
05/26/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
05/26/2020
All Rough Inspection - Commercial Partial 6/8/2020 6/8/2020 06/08/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/05/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
06/05/2020
All trades complete
THIRD FLOOR
Corrective Action Required
06/05/2020
All trades complete
SECOND FLOOR
Corrective Action Required
06/05/2020
ALL TRADES COMPLETE
FIRST FLOOR
Corrective Action Required
06/05/2020
ALL TRADES COMPLETE
LOWER LEVEL
Corrective Action Required
06/05/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4- -ALL TRADES COMPLETE—LACKING G17—
Rated Assembly Inspection Partial 6/10/2020 6/10/2020 06/10/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/08/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR
STAIR TOWER 1
Partial Correction
06/08/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/08/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/08/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/08/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR
THIRD FLOOR
Corrective Action Required
06/08/2020
SECOND FLOOR
Corrective Action Required
06/08/2020
FIRST FLOOR
Corrective Action Required
06/08/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER -
LOWER LEVEL
Corrective Action Required
06/08/2020
All Rough Inspection - Commercial Passed 6/10/2020 6/10/2020 06/10/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/08/2020
>>FRAMING OK TO COVER INSIDE FACE: -0-4TH FLOORS ON ELEVATOR - -STAIR TOWERS : 4TH FLOOR CEILING AND WALLS.- -TUB/SHOWER-4,3RD, 2nd-1st- -STAIRWELL #1 WEST WALL BASEMENT - -SHEAR WALLS 4 & 6 FLOORS 1-4- -OUTSIDE FACE OF ELEVATOR SHAFT AND STAIRWELLS FLOORS 1-4- -CORRIDOR WALLS 1ST FLOOR- -SHEAR WALL 2 1ST FLOOR-
FOURTH FLOOR
Corrective Action Required
06/08/2020
All trades complete
THIRD FLOOR
Corrective Action Required
06/08/2020
All trades complete
SECOND FLOOR
Corrective Action Required
06/08/2020
ALL TRADES COMPLETE
FIRST FLOOR
Corrective Action Required
06/08/2020
ALL TRADES COMPLETE
LOWER LEVEL
Corrective Action Required
06/08/2020
-ROUGH FRAMING- IT ROOM,ELEVAOR , ELECT ROOMS, STAIR WALL.- -STAIRWELLS 1 & 2, STORAGE ROOMS, SHEAR WALL 4- -ALL TRADES COMPLETE
Rated Assembly Inspection Partial 6/11/2020 6/11/2020 06/11/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/10/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR
STAIR TOWER 1
Partial Correction
06/10/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/10/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: EQUIPMENT ROOM :CEILING 1ST LAYER 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/10/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR
THIRD FLOOR
Corrective Action Required
06/10/2020
SECOND FLOOR
Corrective Action Required
06/10/2020
FIRST FLOOR
Corrective Action Required
06/10/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER - RC OK
LOWER LEVEL
Corrective Action Required
06/10/2020
RC OK
Rated Assembly Inspection Partial 6/12/2020 6/12/2020 06/12/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/11/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR
STAIR TOWER 1
Partial Correction
06/11/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/11/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/11/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: EQUIPMENT ROOM :CEILING 1ST LAYER 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/11/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR
THIRD FLOOR
Corrective Action Required
06/11/2020
SECOND FLOOR
Corrective Action Required
06/11/2020
FIRST FLOOR
Corrective Action Required
06/11/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER - RC OK ELEV EQIP ROOM CEILING 2ND LAYER
LOWER LEVEL
Corrective Action Required
06/11/2020
RC OK
Rated Assembly Inspection Partial 6/15/2020 6/15/2020 06/15/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/12/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR
STAIR TOWER 1
Partial Correction
06/12/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/12/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/12/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: EQUIPMENT ROOM :CEILING 1ST LAYER,2ND,3RD RC CHANNEL, 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/12/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR
THIRD FLOOR
Corrective Action Required
06/12/2020
UNITS & CORRIDOR
SECOND FLOOR
Corrective Action Required
06/12/2020
UNITS & CORRIDOR
FIRST FLOOR
Corrective Action Required
06/12/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER - RC OK ELEV EQIP ROOM CEILING 2ND LAYER
LOWER LEVEL
Corrective Action Required
06/12/2020
RC OK
Rated Assembly Inspection Partial 6/17/2020 6/17/2020 06/17/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/15/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR
STAIR TOWER 1
Partial Correction
06/15/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/15/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/15/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: EQUIPMENT ROOM :CEILING 1ST LAYER,2ND,3RD RC CHANNEL, 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/15/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR
THIRD FLOOR
Corrective Action Required
06/15/2020
UNITS & CORRIDOR
SECOND FLOOR
Corrective Action Required
06/15/2020
UNITS & CORRIDOR
FIRST FLOOR
Corrective Action Required
06/15/2020
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER - RC OK ELEV EQIP ROOM CEILING 2ND LAYER SCREW PATTERN ENTIRE FLOOR
LOWER LEVEL
Corrective Action Required
06/15/2020
RC OK 4TH LAYER ELEVATOR MECHANICAL ROOM
Above Ceiling Inspection Passed 6/18/2020 6/18/2020 06/18/2020
Miscellaneous Correction
Corrective Action Required
06/18/2020
SHEET ROCK AND FIRE CAULK ON CEILINGS AND WALLS FOR FURDOWNS IN G1 AND G17
Rated Assembly Inspection Passed 6/19/2020 6/19/2020 06/19/2020
Misc
Informational
06/19/2020
SCREW PATTERN ENTIRE LOWER LEVEL
Rated Assembly Inspection Partial 6/22/2020 06/22/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/17/2020
BEHIND TUBS AND SHOWERS FIRST LAYER FLOORS 1-4 BEHIND TUBS AND SHOWERS SECOND LAYER FLOORS 1-4 ELEVATOR AND STAIRWELL FIRST LAYER FLOORS 1-4 SHEAR WALL FIRST LAYER BEHIND TUBS AND SHOWER FLOORS 1-2 SHEAR WALL 6 FIRST LAYER OSB FLOORS 1-2 SHEAR WALL4 FIRST LAYER SHEAR WALL 2 FIRST LAYER SHEAR WALL 6 FIRST LAYER ELEVATOR EQUIPMENT ROOM LOWER LEVEL FIRST LAYER MECHANICAL ROOM LOWER LEVEL FIRST LAYER CORRIDOR FIRST LAYER ROOM SIDE LOWER LEVEL AND FIRST FLOOR RC CHANNEL WALLS AND CEILING 4TH FLOOR RC CHANNEL WALLS AND CEILING 3RD FLOOR RC CHANNEL WALLS AND CEILING 2ND FLOOR SCREW PATTERN RISER ROOM
STAIR TOWER 1
Partial Correction
06/17/2020
4TH FLOOR 1ST LAYER; - 4TH FLOOR 2ND LAYER - -CEILING AND WALL TOP OUT 1ST LAYER- -CEILING AND WALLS 2ND LAYER MECHANICAL ROOMS 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
STAIR TOWER 2
Partial Correction
06/17/2020
4TH FLOOR 1ST LAYER; - 2ND LAYER FLOORS 1-4 - -CEILING AND TOP OUT 1ST LAYER CEILING AND WALLS 2ND LAYER MECHANICAL ROOM 2ND LAYER CEILING 3RD LAYER AND HAT CHANNEL
ELEVATOR 1
Partial Correction
06/17/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: EQUIPMENT ROOM :CEILING 1ST LAYER,2ND,3RD RC CHANNEL, 1ST LAYER FLOORS: 1-4 CEILING:1ST, LAYER - 2ND LAYER FLOORS 1-4 CEILING 2ND LAYER - CEILING 3RD LAYER AND HAT CHANNEL CEILING 4TH LAYER
FOURTH FLOOR
Partial Correction
06/17/2020
SCREW PATTERN ON DRYWALL ENTIRE FLOOR FURDOWNS AND FIRE CAULKING ALL UNITS
THIRD FLOOR
Resolved
01/13/2021
UNITS & CORRIDOR
SECOND FLOOR
Resolved
01/13/2021
UNITS & CORRIDOR
FIRST FLOOR
Resolved
01/13/2021
1ST FLOOR ELEC ROOM,IT ROOM, ELEV EQIP ROOMS 1ST LAYER - RC OK ELEV EQIP ROOM CEILING 2ND LAYER SCREW PATTERN ENTIRE FLOOR
LOWER LEVEL
Resolved
01/13/2021
RC OK 4TH LAYER ELEVATOR MECHANICAL ROOM SCREW PATTERN ENTIRE FLOOR FURDOWNS AND FIRE CAULKING IN CORRIDOR
Electrical Service Inspection Passed 7/31/2020 7/31/2020 07/31/2020
Misc
Resolved
07/31/2020
RELEASE SERVICE AT TWO TEMPORARY POST-MOUNTED SERVICES LABELED 901A, 901B
Footing Inspection - Commercial Partial 10/9/2020 10/09/2020
Misc
Informational
10/09/2020
- YOGA DECK IN COURTYARD -
Underground Electrical Inspection - Commercial Partial 10/13/2020 10/13/2020 10/13/2020
Misc
Informational
10/13/2020
- CONDUIT UNDER SIDEWALK TO LIGHT POLE BETWEEEN BLDG 1 & 4 NEAR WARD RD ENTRANCE -
Rough Framing Inspection - Commercial Passed 11/5/2020 11/6/2020 11/06/2020
Misc
Informational
11/06/2020
- YOGA DECK IN COURTYARD -
Alarm Test Passed 11/24/2020 11/24/2020
Sprinkler - Flow Test Passed 11/24/2020 11/24/2020
Miscellaneous Inspection Failed 11/24/2020 11/24/2020 11/24/2020
Miscellaneous Correction
Corrective Action Required
11/24/2020
901 ward bldg #4 4th floor Secure windows at all stair landings Handrails in all stairways Fire extinguisher cabinets throughout Elevator equipment room cover plate Remove dust covers smokes corridor 400 ok 402 complete deck rail 404 bad GFCI between stove & refer 405 bath exhaust fan obstruction 406 ok 407 fire caulk ceiling mech room, entry door won’t latch 408 fire caulk line set ceiling mech room 410 fire caulk line set ceiling mech room 412 entry door won't latch 3rd floor not ready 300 deadbolt deck door won't throw 301 ok 302 deadbolt deck door won't fully extend 303 provide deadbolt bed deck door, GFCI above toilet hot neutral reverse 304 missing deck rail Room next to elevator open j box, door casing 305 ok I had Occupancy Inspection at 13:30 3rd,2nd,1st, floor & garages not inspected .
Miscellaneous Inspection Failed 12/1/2020 12/1/2020 12/01/2020
Miscellaneous Correction
Corrective Action Required
12/01/2020
901 ward bldg #4 PRCOM20182611 misc inspection 4th floor Secure windows at all stair landings Handrails in all stairways Fire extinguisher cabinets throughout Elevator equipment room cover plate Remove dust covers smokes corridor 400 ok 402 complete deck rail 404 bad GFCI between stove & refer 405 bath exhaust fan obstruction 406 ok 407 fire caulk ceiling mech room, entry door won’t latch 408 fire caulk line set ceiling mech room 410 fire caulk line set ceiling mech room 412 entry door won't latch 3rd floor not ready 300 deadbolt deck door won't throw 301 ok 302 deadbolt deck door won't fully extend 303 provide deadbolt bed deck door, GFCI above toilet hot neutral reverse 304 missing deck rail Room next to elevator open j box, door casing 305 ok 12/01/2020 Address exterior doors Signage throughout 306 ok 307 AFCI #18 won't trip on test 308 fire caulk ceiling mech room 309 anti tip device range 310 fire caulk ceiling mech room 311 ok 312 ok 313 provide spark rings electrical boxes at stairway side, fire caulk tape mech room ceiling 314 fire caulk ceiling mech room 214 fire caulk ceiling mech room 213 spark rings 212 anti tip range, fire caulk mech closet ceiling 211 cover plate bathroom vanity, fire caulk mech ceiling 210,209 fire caulk mech room ceiling ,204 guardrail deck, fire caulk mech room ceiling -208,207,206,205 ,203,202,201,200.OK
Miscellaneous Inspection Partial 12/15/2020 12/15/2020 12/15/2020
Miscellaneous Correction
Corrective Action Required
12/01/2020
901 ward bldg #4 4th floor Secure windows at all stair landings Handrails in all stairways Fire extinguisher cabinets throughout Elevator equipment room cover plate Remove dust covers smokes corridor 400 ok 402 complete deck rail 404 bad GFCI between stove & refer 405 bath exhaust fan obstruction 406 ok 407 fire caulk ceiling mech room, entry door won’t latch 408 fire caulk line set ceiling mech room 410 fire caulk line set ceiling mech room 412 entry door won't latch 3rd floor not ready 300 deadbolt deck door won't throw 301 ok 302 deadbolt deck door won't fully extend 303 provide deadbolt bed deck door, GFCI above toilet hot neutral reverse 304 missing deck rail Room next to elevator open j box, door casing 305 ok I had Occupancy Inspection at 13:30 3rd,2nd,1st, floor & garages not inspected .
Miscellaneous Correction
Corrective Action Required
12/15/2020
BASEMENT LEVEL -SIGNAGE THROUGHOUT -ENSURE ALL GARAGE DOORS SELF CLOSE AND LATCH PROPERLY ST 11- NO ACCESS ST 8- NO ACCESS ST 7- INSTALL LIGHT AT CEILING G1, G3, G6- GARAGE DOOR DOESN'T OPEN WITH CARBON MONOXIDE DETECTOR G8- MAKE SURE CLEAN OUT IS ACCESSIBLE AND INSTALL COVER ELEVATOR EQUIPMENT ROOM-PATCH HOLES IN FIRE RATED ASSEMBLY AT CEILING AND AT DOOR JAMB FIRE ALARM CONTROL PANEL ROOM- COMPLETE LOW VOLTATGE 1ST FLOOR -SIGNAGE THROUGHOUT -FIRE CAULK ALARM WIRING IN MECHANICAL CLOSET CEILING -PATCH HOLE IN HALLWAY CEILING BY STAIR 1 -100- GFCI NOT WORKING AT EAST PATIO, INSTALL COMBO SMOKE/C02 DETECTOR OUTSIDE OF WEST BEDROOM -104-DOOR DOES NOT LATCH PROPERLY, ISTALL PATIO RAILING -106-DOOR DOES NOT LATCH PROPERLY, INSTALL RANGE ON ANTI TIP DEVICE 107-DOOR DOES NOT LATCH PROPERLY, 108-DOOR DOES NOT LATCH PROPERLY 110-DOOR DOES NOT LATCH PROPERLY 111- SEAL HOLE IN FIRE CAULKING AT LINE SET 113- DOOR DOES NOT LATCH PROPERLY 114- DOOR DOES NOT LATCH PROPERLY, MISSING ANTI TIP AT RANGE, MISSING HAMMER ARRESTOR AT KITCHEN SINK
Miscellaneous Inspection Failed 12/18/2020 12/18/2020 12/18/2020
Miscellaneous Correction
Corrective Action Required
12/15/2020
901 ward bldg #4 PRCOM20182611 misc inspection 4th floor Secure windows at all stair landings 300 deadbolt deck door won't throw no access 302 deadbolt deck door won't fully extend no access 303 provide deadbolt bed deck door, GFCI above toilet hot neutral reverse no access 304 missing deck rail no access Provide addresses exterior doors 307 AFCI #18 won't trip on test no access 309 anti tip device range no access 310 fire caulk ceiling mech room no access 313 provide spark rings electrical boxes at stairway side, fire caulk tape mech room ceiling no access 314 fire caulk ceiling mech room no access 901 Lower level St 11 no access Elevator equipment room- seal penetrations in ceiling and jamb basement-no access ST 8 no access G10 doesn’t latch G8 clean out G6 and G3 G1 garage door doesn’t open with CO2 detector Fire alarm control panel room complete lv 114 anti tip at range, hammer arrestor at sink 111 hole at fc in line set 107 door doesn’t latch 106 anti tip 104 install railing 214 fire caulk ceiling mech room Patch ceiling outside of 212
Miscellaneous Correction
Resolved
12/18/2020
Occupancy Inspection - Engineering Passed 12/22/2020 12/22/2020
Misc
Informational
12/22/2020
We will give a punch list for the final building.
Occupancy Inspection - Water Utilities Passed 12/22/2020
Occupancy Inspection - Fire Failed 12/22/2020 12/22/2020
Occupancy Inspection - Planning Passed 12/22/2020
Occupancy Inspection - Codes Commercial Failed 12/22/2020 12/22/2020 12/22/2020
Misc
Corrective Action Required
12/22/2020
- SECURE ALL WINDOWS AT STAIR LANDINGS - - FIRE FAILED OCCUPANCY -
Miscellaneous Inspection Passed 12/22/2020 12/22/2020
Miscellaneous Correction
Resolved
12/22/2020
Rated Assembly Inspection Passed 6/22/2020 01/13/2021
Underground Electrical Inspection - Commercial Passed 10/13/2020 01/13/2021
Misc
Informational
10/13/2020
- CONDUIT UNDER SIDEWALK TO LIGHT POLE BETWEEEN BLDG 1 & 4 NEAR WARD RD ENTRANCE -
Footing Inspection - Commercial Passed 10/9/2020 01/13/2021
Occupancy Inspection - Fire Passed 1/14/2021 01/14/2021
Occupancy Inspection - Codes Commercial Full C of O 1/14/2021 1/14/2021 01/14/2021
Misc
Resolved
01/14/2021
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Receipt Receipt for transaction: 2018-007174
09/30/2019 Letter DS Building Permit
10/30/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/24/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/27/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter Codes Plan Review Conditions
05/12/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/20/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/03/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/11/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter Fire Loss Reduction Form
11/30/2020 Letter INSPECTION SUMMARY
12/01/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/22/2020 Letter DE-Daily Inspection Summary
12/22/2020 Letter Fire Loss Reduction Form
12/22/2020 Letter INSPECTION SUMMARY
12/22/2020 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter Fire Loss Reduction Form
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter Field Certificate of Occupancy
01/14/2021 Letter Codes Final Certificate of Occupancy
01/14/2021 Letter Elevator Inspection
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home