Permit Application Status

PRCOM20182609


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20182609
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
B#3- 4 STORY APARTMENT BUILDING *FOUNDATION PERMIT - PRCOM20183264
08/14/2018
08/05/2019
10/29/2020
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/22/2020
Michael Weissenbach
Alarm Plan Review Released for Construction 10/22/2020
Michael Weissenbach
Special Inspections Review Approved 11/09/2018
Mike Weisenborn
Final Development Plan Review Approved 02/28/2019 10/08/2018
Joe Frogge
Licensed Contractors Approved 02/28/2019 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $21,433.11 $21,433.11 Paid 11/09/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 9/13/2019 9/16/2019 at 7:10 AM 09/16/2019
Misc
Partial Correction
09/16/2019
OK TO ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR BASEMENT LEVEL;
Rated Assembly Inspection Partial 9/18/2019 at 3:35 PM 09/18/2019
Misc
Partial Correction
09/18/2019
OK TO COVER WHEN READY COMPONENTS OF 5/8" GWB RATED ASSEMBLY AT STAIRWELLS: NORTH STAIR: BASEMENT LEVEL 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE;
Rated Assembly Inspection Partial 9/27/2019 9/27/2019 at 8:15 AM 09/27/2019
Misc
Partial Correction
09/18/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: SOUTH STAIRWELL: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED.
All Rough Inspection - Commercial Partial 9/30/2019 9/30/2019 at 7:35 AM 09/30/2019
Misc
Partial Correction
09/16/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; SOUTH STAIR: 1ST FLOOR;
Rated Assembly Inspection Partial 10/8/2019 10/8/2019 at 8:20 AM 10/08/2019
Misc
Partial Correction
09/27/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELLWALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Rated Assembly Inspection Partial 10/10/2019 10/10/2019 at 1:10 PM 10/10/2019
Misc
Partial Correction
10/08/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
All Rough Inspection - Commercial Failed 10/30/2019 10/30/2019 at 7:25 AM 10/30/2019
Misc
Partial Correction
09/30/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; SOUTH STAIR: 1ST FLOOR;
Misc
Corrective Action Required
10/30/2019
STAIR NOT BUILT FOR ACCESS
Electrical Service Inspection Partial 10/30/2019 10/30/2019 at 10:30 AM 10/30/2019
Misc
Partial Correction
10/30/2019
RELEASE SERVICE AT TWO TEMPORARY POST-MOUNTED SERVICES LABELED 833A, 833B
All Rough Inspection - Commercial Partial 12/3/2019 12/3/2019 at 9:05 AM 12/03/2019
Misc
Partial Correction
10/30/2019
OK TO GWB ONE-SIDE DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; SOUTH STAIR: 1ST FLOOR; 2ND FLOOR;
Misc
Resolved
12/03/2019
STAIR NOT BUILT FOR ACCESS
Rated Assembly Inspection Partial 12/5/2019 12/5/2019 at 3:20 PM 12/05/2019
Misc
Partial Correction
10/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 4TH FLOOR:
Rated Assembly Inspection Partial 12/10/2019 12/10/2019 at 3:25 PM 12/10/2019
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Misc
Partial Correction
12/05/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 4TH FLOOR:
All Rough Inspection - Commercial Partial 12/10/2019 12/10/2019 at 3:35 PM 12/10/2019
Misc
Partial Correction
12/03/2019
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 12/13/2019 at 2:25 PM 12/13/2019
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 4TH FLOOR:
Rated Assembly Inspection Partial 12/23/2019 12/23/2019 at 11:30 AM 12/23/2019
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
Misc
Partial Correction
12/13/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
Rough Framing Inspection - Commercial Partial 12/27/2019 at 1:20 PM 12/27/2019
Misc
Partial Correction
12/27/2019
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY.
Rough Framing Inspection - Commercial Partial 2/3/2020 at 2:50 PM 02/03/2020
Misc
Partial Correction
12/27/2019
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY. EXTERIOR SHEAR WALLS AT BOTH ENDS OF BUILDING OK TO COVER FULL HEIGHT WHEN READY.
All Rough Inspection - Commercial Partial 2/3/2020 3/4/2020 at 9:10 AM 03/04/2020
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
12/10/2019
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
FOURTH FLOOR
Corrective Action Required
03/10/2020
THIRD FLOOR
Corrective Action Required
03/10/2020
SECOND FLOOR
Corrective Action Required
03/10/2020
FIRST FLOOR
Corrective Action Required
03/10/2020
LOWER LEVEL
Corrective Action Required
03/10/2020
Rated Assembly Inspection Partial 3/10/2020 3/10/2020 03/10/2020
Misc
Resolved
03/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT STAIRWELL WALLS INSIDE FACE AND SPACES BETWEEN JOISTS AT BACKSIDE: NORTH STAIRWELL: BASEMENT LEVEL: 1ST LAYER AT INTERIOR + BETWEEN JOISTS AT BACKSIDE; 2ND LAYER; 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR: SOUTH STAIRWELL: 1ST FLOOR: 1ST LAYER; 2ND LAYER 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR: NOTE: FIRESTOPPING WHERE PVC PIPE INTERRUPTS GWB IS SUBJECT TO APPROVAL WHEN COMPLETED. USE ONLY LISTED FIRECAULK.
ELEVATOR 1
Partial Correction
12/23/2019
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/10/2020
EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/10/2020
EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/10/2020
THIRD FLOOR
Corrective Action Required
03/10/2020
SECOND FLOOR
Corrective Action Required
03/10/2020
FIRST FLOOR
Corrective Action Required
03/10/2020
LOWER LEVEL
Corrective Action Required
03/10/2020
Rough Framing Inspection - Commercial Partial 3/11/2020 03/11/2020
Misc
Partial Correction
02/03/2020
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY. EXTERIOR SHEAR WALLS AT BOTH ENDS OF BUILDING OK TO COVER FULL HEIGHT WHEN READY. TUB SHOWER WALLS ; 4TH,3RD,
Rated Assembly Inspection Partial 3/12/2020 3/12/2020 03/12/2020
ELEVATOR 1
Partial Correction
03/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/10/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT: EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/10/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/10/2020
THIRD FLOOR
Corrective Action Required
03/10/2020
SECOND FLOOR
Corrective Action Required
03/10/2020
FIRST FLOOR
Corrective Action Required
03/10/2020
LOWER LEVEL
Corrective Action Required
03/10/2020
Rated Assembly Inspection Partial 3/13/2020 3/13/2020 03/13/2020
ELEVATOR 1
Partial Correction
03/12/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/12/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT: EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/12/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/12/2020
Pre rock tub & showers 4th floor approved
THIRD FLOOR
Corrective Action Required
03/12/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/12/2020
FIRST FLOOR
Corrective Action Required
03/12/2020
LOWER LEVEL
Corrective Action Required
03/12/2020
Rated Assembly Inspection Partial 3/16/2020 03/16/2020
ELEVATOR 1
Partial Correction
03/13/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/13/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT: EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/13/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/13/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
03/13/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/13/2020
FIRST FLOOR
Corrective Action Required
03/13/2020
LOWER LEVEL
Corrective Action Required
03/13/2020
Rough Framing Inspection - Commercial Partial 3/17/2020 03/17/2020
Misc
Partial Correction
03/11/2020
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY. EXTERIOR SHEAR WALLS AT BOTH ENDS OF BUILDING OK TO COVER FULL HEIGHT WHEN READY. TUB SHOWER WALLS ; 4TH,3RD,
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/17/2020
ROUGH FRAMING FOR PRE-ROCK AREAS 4TH FL 3RD FL 2ND FL
Rated Assembly Inspection Partial 3/18/2020 03/18/2020
ELEVATOR 1
Partial Correction
03/16/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/16/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT: EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/16/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/16/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
03/16/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/16/2020
TUB SHOWERS - 1ST;
FIRST FLOOR
Corrective Action Required
03/16/2020
TUB SHOWERS - 1ST;
LOWER LEVEL
Corrective Action Required
03/16/2020
Rough Framing Inspection - Commercial Partial 3/18/2020 03/18/2020
Misc
Partial Correction
03/17/2020
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY. EXTERIOR SHEAR WALLS AT BOTH ENDS OF BUILDING OK TO COVER FULL HEIGHT WHEN READY. TUB SHOWER WALLS ; 4TH,3RD,
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/17/2020
ROUGH FRAMING FOR PRE-ROCK AREAS 4TH FL 3RD FL 2ND FL
ELEVATOR 1
Corrective Action Required
03/18/2020
FRAMING 1-4FLOORS
Rated Assembly Inspection Partial 3/20/2020 3/20/2020 03/20/2020
ELEVATOR 1
Partial Correction
03/18/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/18/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT: EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
STAIR TOWER 2
Corrective Action Required
03/18/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/18/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
03/18/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/18/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
03/18/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
03/18/2020
Elevator Equip, IT, Electrical rooms 1st layer
Rated Assembly Inspection Partial 3/24/2020 at 1:20 PM 03/24/2020
ELEVATOR 1
Partial Correction
03/20/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 4TH- 3RD- 2ND- 1ST- SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/20/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- INTERIOR SIDE: 4TH FL-1ST LAYER; BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
03/20/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST EXTERIOR: 4TH FL- INTERIOR 4TH FL: 1ST LAYER;
FOURTH FLOOR
Corrective Action Required
03/20/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
03/20/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/20/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
03/20/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
03/20/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok
Sprinkler - Hydrostatic Test Passed 3/25/2020 03/25/2020
Rated Assembly Inspection Partial 4/1/2020 04/01/2020
ELEVATOR 1
Partial Correction
03/24/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4 SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
03/24/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING;2ND INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
03/24/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING;2ND INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
03/24/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
03/24/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
03/24/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
03/24/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
03/24/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok
Rated Assembly Inspection Partial 4/3/2020 04/03/2020
ELEVATOR 1
Partial Correction
04/01/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd; SPACES BETWEEN JOISTS AT BACKSIDE: BASEMENT: 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER 3RD FLOOR: 1ST LAYER; 2ND LAYER 4TH FLOOR:
STAIR TOWER 1
Corrective Action Required
04/01/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING;2ND,3rd and hat channel INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/01/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING;2ND,3rd and hat channel INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/01/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
04/01/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
04/01/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
04/01/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
04/01/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok
All Rough Inspection - Commercial Partial 3/17/2020 4/6/2020 04/06/2020
Misc
Partial Correction
03/04/2020
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/06/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
Rated Assembly Inspection Partial 4/6/2020 04/06/2020
ELEVATOR 1
Partial Correction
04/03/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4
STAIR TOWER 1
Corrective Action Required
04/03/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/03/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/03/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
04/03/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
04/03/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
04/03/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
04/03/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok
Rated Assembly Inspection Partial 4/7/2020 4/7/2020 04/07/2020
ELEVATOR 1
Partial Correction
04/06/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/06/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/06/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/06/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
04/06/2020
Pre rock tub & showers 3rd floor approved
SECOND FLOOR
Corrective Action Required
04/06/2020
TUB SHOWERS - 1ST; 2ND Layer
FIRST FLOOR
Corrective Action Required
04/06/2020
TUB SHOWERS - 1ST; 2ND Layer
LOWER LEVEL
Corrective Action Required
04/06/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok
All Rough Inspection - Commercial Partial 4/9/2020 4/9/2020 04/09/2020
Misc
Partial Correction
04/06/2020
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/06/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Corrective Action Required
04/09/2020
Complete ok.mh
Misc
Corrective Action Required
04/09/2020
Test cityview
Rated Assembly Inspection Partial 4/10/2020 4/10/2020 04/10/2020
ELEVATOR 1
Partial Correction
04/07/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/07/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/07/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/07/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS
THIRD FLOOR
Corrective Action Required
04/07/2020
Pre rock tub & showers 3rd floor approved shear walls-ok
SECOND FLOOR
Corrective Action Required
04/07/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
FIRST FLOOR
Corrective Action Required
04/07/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
LOWER LEVEL
Corrective Action Required
04/07/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok
All Rough Inspection - Commercial Partial 4/10/2020 4/10/2020 04/10/2020
Misc
Partial Correction
04/09/2020
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/09/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Corrective Action Required
04/09/2020
Complete ok.mh
Misc
Corrective Action Required
04/09/2020
Test cityview
THIRD FLOOR
Corrective Action Required
04/10/2020
rough complete
All Rough Inspection - Commercial Partial 4/13/2020 4/13/2020 04/13/2020
Misc
Partial Correction
04/10/2020
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/10/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Corrective Action Required
04/10/2020
Complete ok.mh
Misc
Corrective Action Required
04/10/2020
Test cityview
THIRD FLOOR
Corrective Action Required
04/10/2020
rough complete
SECOND FLOOR
Corrective Action Required
04/13/2020
ROUGH COMPELTE
Rated Assembly Inspection Partial 4/13/2020 04/13/2020
ELEVATOR 1
Partial Correction
04/10/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/10/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/10/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/10/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS
THIRD FLOOR
Corrective Action Required
04/10/2020
Pre rock tub & showers 3rd floor approved shear walls-ok
SECOND FLOOR
Corrective Action Required
04/10/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
FIRST FLOOR
Corrective Action Required
04/10/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
LOWER LEVEL
Corrective Action Required
04/10/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok
All Rough Inspection - Commercial Partial 4/14/2020 4/14/2020 04/14/2020
Misc
Resolved
04/14/2020
OK TO GWB STAIRWELL FACE OF DOUBLE-WYTHE STAIRWELL WALLS: NORTH STAIR: BASEMENT LEVEL; 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER SOUTH STAIR: 1ST FLOOR; 2ND FLOOR; 3RD FLOOR; 4TH FLR + TOWER
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/13/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Corrective Action Required
04/13/2020
Complete ok.mh
Misc
Resolved
04/14/2020
Test cityview
THIRD FLOOR
Corrective Action Required
04/13/2020
rough complete
SECOND FLOOR
Corrective Action Required
04/13/2020
ROUGH COMPELTE
FIRST FLOOR
Corrective Action Required
04/14/2020
Rough complete
Rated Assembly Inspection Partial 4/14/2020 4/14/2020 04/14/2020
ELEVATOR 1
Partial Correction
04/13/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/13/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/13/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/13/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR.
THIRD FLOOR
Corrective Action Required
04/13/2020
Pre rock tub & showers 3rd floor approved shear walls-ok
SECOND FLOOR
Corrective Action Required
04/13/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
FIRST FLOOR
Corrective Action Required
04/13/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
LOWER LEVEL
Corrective Action Required
04/13/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok
Rated Assembly Inspection Partial 4/15/2020 4/15/2020 04/15/2020
ELEVATOR 1
Partial Correction
04/14/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/14/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/14/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/14/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR.
THIRD FLOOR
Corrective Action Required
04/14/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL
SECOND FLOOR
Corrective Action Required
04/14/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
FIRST FLOOR
Corrective Action Required
04/14/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok
LOWER LEVEL
Corrective Action Required
04/14/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok
All Rough Inspection - Commercial Partial 4/16/2020 4/16/2020 04/16/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
10/29/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Resolved
10/29/2020
Complete ok.mh
THIRD FLOOR
Resolved
10/29/2020
rough complete
SECOND FLOOR
Resolved
10/29/2020
ROUGH COMPELTE
FIRST FLOOR
Resolved
10/29/2020
Rough complete
LOWER LEVEL
Resolved
10/29/2020
ROUGH COMPLETE
Rated Assembly Inspection Partial 4/20/2020 4/20/2020 at 11:10 AM 04/20/2020
ELEVATOR 1
Partial Correction
04/15/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/15/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/15/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/15/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Corrective Action Required
04/15/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL
SECOND FLOOR
Corrective Action Required
04/15/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
FIRST FLOOR
Corrective Action Required
04/15/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
LOWER LEVEL
Corrective Action Required
04/15/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok
Rated Assembly Inspection Partial 4/21/2020 4/21/2020 04/21/2020
ELEVATOR 1
Partial Correction
04/20/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/20/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/20/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/20/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Corrective Action Required
04/20/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL
SECOND FLOOR
Corrective Action Required
04/20/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
FIRST FLOOR
Corrective Action Required
04/20/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
LOWER LEVEL
Corrective Action Required
04/20/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok RC CHANNEL OK
Rated Assembly Inspection Partial 4/22/2020 4/22/2020 04/22/2020
ELEVATOR 1
Partial Correction
04/21/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/21/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/21/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/21/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Corrective Action Required
04/21/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL ROCK nail pattern
SECOND FLOOR
Corrective Action Required
04/21/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
FIRST FLOOR
Corrective Action Required
04/21/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
LOWER LEVEL
Corrective Action Required
04/21/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok RC CHANNEL OK
Rated Assembly Inspection Partial 4/24/2020 4/24/2020 04/24/2020
ELEVATOR 1
Partial Correction
04/22/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/22/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/22/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/22/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Corrective Action Required
04/22/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL ROCK nail pattern
SECOND FLOOR
Corrective Action Required
04/22/2020
UNITS & CORRIDORS
FIRST FLOOR
Corrective Action Required
04/22/2020
TUB SHOWERS - 1ST; 2ND Layer shear walls-ok ALL WALL AND CEILING RC CHANNEL- OK
LOWER LEVEL
Corrective Action Required
04/22/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok RC CHANNEL OK
Rated Assembly Inspection Partial 4/27/2020 4/27/2020 04/27/2020
ELEVATOR 1
Partial Correction
04/24/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th
STAIR TOWER 1
Corrective Action Required
04/24/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Corrective Action Required
04/24/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Corrective Action Required
04/24/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Corrective Action Required
04/24/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL ROCK nail pattern
SECOND FLOOR
Corrective Action Required
04/24/2020
UNITS & CORRIDORS
FIRST FLOOR
Corrective Action Required
04/24/2020
UNITS OK
LOWER LEVEL
Corrective Action Required
04/24/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok RC CHANNEL OK
Above Ceiling Inspection Partial 4/28/2020 4/28/2020 04/28/2020
FOURTH FLOOR
Corrective Action Required
04/28/2020
4TH FLOOR FUR DOWNS OK
LOWER LEVEL
Corrective Action Required
04/28/2020
Rated Assembly Inspection Partial 4/29/2020 4/29/2020 04/29/2020
ELEVATOR 1
Partial Correction
04/27/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th LOWER ELEVATOR ROOM- CEILING 1ST, 2ND LAYER.
STAIR TOWER 1
Resolved
04/29/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD FLOOR 1ST BASEMENT- EXTERIOR: 4TH FL- CEILING complete INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK OUTER SIDE:
STAIR TOWER 2
Resolved
04/29/2020
SPACES BETWEEN JOISTS AT BACKSIDE: 3RD- FLOOR 1ST CEILING complete- INTERIOR SIDE: 4TH FL-1ST LAYER;2ND BASEMENT-1ST LAYER OK
FOURTH FLOOR
Resolved
04/29/2020
Pre rock tub & showers 4th floor approved 1ST 2ND AT STAIR TOWNERS RC CHANNEL UNITS; RC CORRIDOR. WALL AND CEILING SCREW PATTERN-OK
THIRD FLOOR
Resolved
04/29/2020
Pre rock tub & showers 3rd floor approved shear walls-ok RC CHANNEL ROCK nail pattern
SECOND FLOOR
Resolved
04/29/2020
UNITS & CORRIDORS
FIRST FLOOR
Resolved
04/29/2020
UNITS OK
LOWER LEVEL
Resolved
04/29/2020
Elevator Equip, IT, Electrical rooms-2nd layer ok shear walls-ok RC CHANNEL OK
Above Ceiling Inspection Partial 4/28/2020 04/29/2020
FOURTH FLOOR
Resolved
04/29/2020
4TH FLOOR FUR DOWNS OK
LOWER LEVEL
Corrective Action Required
04/28/2020
Electrical Service Inspection Passed 5/1/2020 5/1/2020 05/01/2020
Misc
Resolved
05/01/2020
RELEASE SERVICE AT TWO TEMPORARY POST-MOUNTED SERVICES LABELED 833A, 833B
Rated Assembly Inspection Partial 5/1/2020 5/1/2020 05/01/2020
ELEVATOR 1
Partial Correction
04/29/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th LOWER ELEVATOR ROOM- CEILING 1ST, 2ND, 3RD LAYER
Rough Framing Inspection - Commercial Passed 05/07/2020
Misc
Resolved
05/07/2020
NO ISSUES FOUND ON INSTALLATION OF ROOF SHEATHING. OK TO COVER WHEN READY. EXTERIOR SHEAR WALLS AT BOTH ENDS OF BUILDING OK TO COVER FULL HEIGHT WHEN READY. TUB SHOWER WALLS ; 4TH,3RD,
THE FOLLOWING AREAS ARE APPROVED
Resolved
05/07/2020
ROUGH FRAMING FOR PRE-ROCK AREAS 4TH FL 3RD FL 2ND FL
ELEVATOR 1
Resolved
05/07/2020
FRAMING 1-4FLOORS
Underground Electrical Inspection - Commercial Partial 9/23/2020 9/23/2020 09/23/2020
Misc
Informational
10/28/2020
- CONDUIT AT CORNER OF BUILDING TO CONDUIT UNDER SIDEWALK FOR LIGHTS -
Miscellaneous Inspection Partial 10/8/2020 10/8/2020 10/08/2020
Miscellaneous Correction
Corrective Action Required
10/08/2020
-Signage throughout -Secure windows in stairwells -Seal line set in mechanical closet north -Mechanical closet south-no access -Fire extinguishers/ cabinets in hallway -Cover plates in hallway -Set escutcheon in hall by 406 411 seal joint in rock mechanical closet at line set, spark ring microwave, escutcheon in kitchen 410 Cover plate in bedroom, seal joint in mechanical closet 409 patch hole in mechanical 408 place range on anti tip,hammer arrester at sink, spark ring at microwave 407 seal gaps and penetration in mechanical closet 406 adjust door, seal gap between wall and ceiling in mechanical 405 seal gaps in mechanical 404 adjust door, seal joint in mechanical closet 403 several workers cleaning, inaccessible 402 seal penetrations mechanical 401 still working 400 missing escutcheon in dining, seal line set in mechanical
Miscellaneous Inspection Partial 10/16/2020 10/16/2020 10/16/2020
Miscellaneous Correction
Corrective Action Required
10/08/2020
-Signage throughout -Secure windows in stairwells 4th Floor -Seal drywall patch in mechanical closet north -Mechanical closet south-no access -Fire extinguishers/ cabinets in hallway -Cover plates in hallway -Set escutcheon in hall by 406 411 seal joint in rock mechanical closet at line set, spark ring microwave, escutcheon in kitchen 410 Cover plate in bedroom, seal joint in mechanical closet 409 patch hole in mechanical 408 place range on anti tip,hammer arrester at sink, spark ring at microwave 407 seal gaps and penetration in mechanical closet 406 adjust door, seal gap between wall and ceiling in mechanical 405 seal gaps in mechanical 404 adjust door, seal joint in mechanical closet 403 several workers cleaning, inaccessible 402 seal penetrations mechanical 401 still working-no access 400 missing escutcheon in dining, seal line set in mechanical 3rd Floor -Missing cover plates in elevator equipment room 300 Seal gaps at middle and back line sets in mechanical closet 302 missing cover plate in bedroom 2 303 install missing deck railing 304 door doesn’t close and latch properly, seal gaps at middle and back line sets 306 bad gfci at exterior 307 seal penetrations in mechanical closet 310 bath fan doesn’t work
Miscellaneous Inspection Failed 10/20/2020 10/20/2020 10/20/2020
Miscellaneous Correction
Corrective Action Required
10/16/2020
-Signage throughout -Secure windows in stairwells 4th Floor -Seal drywall patch in mechanical closet north -Mechanical closet south-no access -Fire extinguishers/ cabinets in hallway -Cover plates in hallway -Set escutcheon in hall by 406 411 seal joint in rock mechanical closet at line set, spark ring microwave, escutcheon in kitchen 410 Cover plate in bedroom, seal joint in mechanical closet 409 patch hole in mechanical 408 place range on anti tip,hammer arrester at sink, spark ring at microwave 407 seal gaps and penetration in mechanical closet 406 adjust door, seal gap between wall and ceiling in mechanical 405 seal gaps in mechanical 404 adjust door, seal joint in mechanical closet 403 several workers cleaning, inaccessible 402 seal penetrations mechanical 401 still working-no access 400 missing escutcheon in dining, seal line set in mechanical 3rd Floor -Missing cover plates in elevator equipment room 300 Seal gaps at middle and back line sets in mechanical closet 302 missing cover plate in bedroom 2 303 install missing deck railing 304 door doesn’t close and latch properly, seal gaps at middle and back line sets 306 bad gfci at exterior 307 seal penetrations in mechanical closet 310 bath fan doesn’t work 833 Donovan 301 ok 303 complete deck railing 305 ok 307 fire caulk ceiling mech room 309 ok 311 ok 10/20/20 1st floor Install Dishwashers, Install weatherstripping, Provide two 3" screws in each exterior door hinge & strike plate 100 2" screws patio door, ADA hand held shower, land conductor above range in a box or fixture, dishwasher, cover plate master vanity 101 fixture above shower, cover plate above vanity, dishwasher, broken window, cover 102 3" screws patio door,dishwasher 103 dishwasher 104 dishwasher, 3" screws patio door, bath exhaust fan 105 dishwasher 106 dishwasher, 3" screw patio door 107 dishwasher 108 ADA hand held shower, 3"'screws patio door, Install dishwasher 109 dishwasher & hammer arrestor, deck rail, 111 dishwasher 110 cover plate bedrooms, hvac grills, 3" screws patio door, install dishwasher, floor receptacle. ADA ? 113 cover plate bedroom Janitor closet extend water heater pan to floor sink, self closing door, fire caulk tubs Basement Floor not ready Fire caulk h frames, complete electric Handrail @ 42" ??? 2nd floor not inspected
Alarm Test Passed 10/22/2020 10/22/2020
Sprinkler - Flow Test Passed 10/22/2020 10/22/2020
Miscellaneous Inspection Partial 10/22/2020 10/22/2020 10/22/2020
Miscellaneous Correction
Corrective Action Required
10/20/2020
-Signage throughout -Secure windows in stairwells 4th Floor -Seal drywall patch in mechanical closet north -Mechanical closet south-no access -Fire extinguishers/ cabinets in hallway -Cover plates in hallway -Set escutcheon in hall by 406 411 seal joint in rock mechanical closet at line set, spark ring microwave, escutcheon in kitchen 410 Cover plate in bedroom, seal joint in mechanical closet 409 patch hole in mechanical 408 place range on anti tip,hammer arrester at sink, spark ring at microwave 407 seal gaps and penetration in mechanical closet 406 adjust door, seal gap between wall and ceiling in mechanical 405 seal gaps in mechanical 404 adjust door, seal joint in mechanical closet 403 several workers cleaning, inaccessible 402 seal penetrations mechanical 401 still working-no access 400 missing escutcheon in dining, seal line set in mechanical 3rd Floor -Missing cover plates in elevator equipment room 300 Seal gaps at middle and back line sets in mechanical closet 302 missing cover plate in bedroom 2 303 install missing deck railing 304 door doesn’t close and latch properly, seal gaps at middle and back line sets 306 bad gfci at exterior 307 seal penetrations in mechanical closet 310 bath fan doesn’t work 833 Donovan 301 ok 303 complete deck railing 305 ok 307 fire caulk ceiling mech room 309 ok 311 ok 10-22-20 2nd Floor 200 cover plate at mirror in bath 206 hammer arrestor at sink, no dishwasher/ discharge line 207 hammer arrestor at sink 209 no dishwasher/ discharge line 211 no meter- not inspected 213 hammer arrestor at sink, no dishwasher/ discharge line 10/20/20 1st floor Install Dishwashers, Install weatherstripping, Provide two 3" screws in each exterior door hinge & strike plate 100 2" screws patio door, ADA hand held shower, land conductor above range in a box or fixture, dishwasher, cover plate master vanity 101 fixture above shower, cover plate above vanity, dishwasher, broken window, cover 102 3" screws patio door,dishwasher 103 dishwasher 104 dishwasher, 3" screws patio door, bath exhaust fan 105 dishwasher 106 dishwasher, 3" screw patio door 107 dishwasher 108 ADA hand held shower, 3"'screws patio door, Install dishwasher 109 dishwasher & hammer arrestor, deck rail, 111 dishwasher 110 cover plate bedrooms, hvac grills, 3" screws patio door, install dishwasher, floor receptacle. ADA ? 113 cover plate bedroom Janitor closet extend water heater pan to floor sink, self closing door, fire caulk tubs Basement Floor not ready Fire caulk h frames, complete electric Handrail @ 42" ??? 2nd floor not inspected
Miscellaneous Inspection Partial 10/26/2020 10/26/2020 10/26/2020
Miscellaneous Correction
Corrective Action Required
10/22/2020
-Signage throughout -Secure windows in stairwells 4th Floor -Seal drywall patch in mechanical closet north -Mechanical closet south-no access -Fire extinguishers/ cabinets in hallway -Cover plates in hallway -Set escutcheon in hall by 406 411 seal joint in rock mechanical closet at line set, spark ring microwave, escutcheon in kitchen 410 Cover plate in bedroom, seal joint in mechanical closet 409 patch hole in mechanical 408 place range on anti tip,hammer arrester at sink, spark ring at microwave 407 seal gaps and penetration in mechanical closet 406 adjust door, seal gap between wall and ceiling in mechanical 405 seal gaps in mechanical 404 adjust door, seal joint in mechanical closet 403 several workers cleaning, inaccessible 402 seal penetrations mechanical 401 still working-no access 400 missing escutcheon in dining, seal line set in mechanical 3rd Floor -Missing cover plates in elevator equipment room 300 Seal gaps at middle and back line sets in mechanical closet 302 missing cover plate in bedroom 2 303 install missing deck railing 304 door doesn’t close and latch properly, seal gaps at middle and back line sets 306 bad gfci at exterior 307 seal penetrations in mechanical closet 310 bath fan doesn’t work 833 Donovan 301 ok 303 complete deck railing 305 ok 307 fire caulk ceiling mech room 309 ok 311 ok 10-22-20 2nd Floor 200 cover plate at mirror in bath 206 hammer arrestor at sink, no dishwasher/ discharge line 207 hammer arrestor at sink 209 no dishwasher/ discharge line 211 no meter- not inspected 213 hammer arrestor at sink, no dishwasher/ discharge line 10/20/20 1st floor Install Dishwashers, Install weatherstripping, Provide two 3" screws in each exterior door hinge & strike plate 100 2" screws patio door, ADA hand held shower, land conductor above range in a box or fixture, dishwasher, cover plate master vanity 101 fixture above shower, cover plate above vanity, dishwasher, broken window, cover 102 3" screws patio door,dishwasher 103 dishwasher 104 dishwasher, 3" screws patio door, bath exhaust fan 105 dishwasher 106 dishwasher, 3" screw patio door 107 dishwasher 108 ADA hand held shower, 3"'screws patio door, Install dishwasher 109 dishwasher & hammer arrestor, deck rail, 111 dishwasher 110 cover plate bedrooms, hvac grills, 3" screws patio door, install dishwasher, floor receptacle. ADA ? 113 cover plate bedroom Janitor closet extend water heater pan to floor sink, self closing door, fire caulk tubs -Basement Floor 10/26/2020 - - INSTALL HANDRAIL STAIRWAY # 1 - - ELEVATOR EQUIP ROOM : MISSING SPRINKLER HEAD ESCUTCHEON, FIRE CAULK CEILING ABOVE PANEL -
Rated Assembly Inspection Passed 10/28/2020 10/28/2020
ELEVATOR 1
Resolved
10/28/2020
OK TO COVER WHEN READY 5/8" MOLD-RESISTANT FIRECODE X GWB AT ELEVATOR SHAFT: 1ST LAYER 1-4, 2nd layer, ceiling 2nd;3rd,4th LOWER ELEVATOR ROOM- CEILING 1ST, 2ND, 3RD LAYER
Underground Electrical Inspection - Commercial Passed 10/28/2020 10/28/2020
Misc
Corrective Action Required
09/23/2020
- CONDUIT AT CORNER OF BUILDING TO CONDUIT UNDER SIDEWALK FOR LIGHTS -
Miscellaneous Inspection Passed 10/28/2020 10/28/2020
Miscellaneous Correction
Resolved
10/28/2020
Occupancy Inspection - Water Utilities Passed 10/28/2020
Occupancy Inspection - Engineering Passed 10/28/2020 10/28/2020
Misc
Informational
10/28/2020
Passed for final occupancy.
Occupancy Inspection - Fire Passed 10/28/2020 10/28/2020 10/28/2020
Occupancy Inspection - Planning Passed 10/28/2020 10/28/2020
Above Ceiling Inspection Passed 10/29/2020 10/29/2020
LOWER LEVEL
Corrective Action Required
04/29/2020
All Rough Inspection - Commercial Passed 5/7/2020 10/29/2020 10/29/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2020
Basment -4th floor shear wall, elevator, stair wall dbl layer locations ok to rock.
FOURTH FLOOR
Corrective Action Required
04/16/2020
Complete ok.mh
THIRD FLOOR
Corrective Action Required
04/16/2020
rough complete
SECOND FLOOR
Corrective Action Required
04/16/2020
ROUGH COMPELTE
FIRST FLOOR
Corrective Action Required
04/16/2020
Rough complete
LOWER LEVEL
Corrective Action Required
04/16/2020
ROUGH COMPLETE
Occupancy Inspection - Codes Commercial Full C of O 10/28/2020 10/29/2020 10/29/2020
Misc
Resolved
10/28/2020
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Receipt Receipt for transaction: 2018-007174
08/05/2019 Letter DS Building Permit
09/16/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter INSPECTION SUMMARY
09/27/2019 Letter INSPECTION SUMMARY
09/30/2019 Letter INSPECTION SUMMARY
10/08/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/20/2020 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter Codes Plan Review Conditions
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/14/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/20/2020 Letter INSPECTION SUMMARY
04/21/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/24/2020 Letter INSPECTION SUMMARY
04/27/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
09/23/2020 Letter INSPECTION SUMMARY
10/08/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/20/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/26/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter DE-Daily Inspection Summary
10/28/2020 Letter state elevator report Building 3
10/29/2020 Letter Codes Final Certificate of Occupancy
10/29/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home