Summary
PR20222818
Building Permit - Commercial
Certificate of Occupancy
MSE PROPERTY HOLDINGS GROUP, LLC
NEW COMMERCIAL
NEW BUILDING FOR AUTOMOTIVE BODY REPAIR
06/21/2022
07/19/2022
01/03/2023
02/10/2023
Locations
Contacts
ROSE CONSTRUCTION CO., INC., Address:15311 W 109TH STREET, Phone:(913) 782-0777  
mike@buildwithrose.com, Address:mike@buildwithrose.com, Phone:(913) 850-2444  
LANCASTER BROTHERS HEATING/COOLING, Address:PO BOX 1202, Phone:(913) 851-3399  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
ESSARY PLUMBING INC, Address:6238 MERRIAM DR, Phone:(913) 522-6222  
ROSE CONSTRUCTION CO., INC., Address:15311 W 109TH STREET, Phone:(913) 782-0777  
MSE PROPERTY HOLDINGS GROUP, LLC, Address:14330 S CICERO AVE  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 07/14/2022 07/19/2022
Joe Frogge
IBC 1004.1 Design occupant load
Resolved
07/19/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Update cover sheet code review to show 1:100 occupant load. (using Industrial as closest comparison)
IBC 2902.2 Separate facilities - fixture
Resolved
07/19/2022

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Provide additional restroom to comply. 7/19/22 - resolved via CMR
IPC 403.1 Minimum number of fixtures
Resolved
07/19/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain (or approved equivalent).
IBC 1209.2 Finish materials
Resolved
07/19/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink.
Engineered truss package
Resolved
07/15/2022

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
Misc
Resolved
07/19/2022

Inadequate information to complete review. Provide the following: - Interior wall schedule.
Suite address
Resolved
07/19/2022

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This new, southernmost building has been assigned the address 451 SE Oldham Pkwy, Unit:C 7/19/22 - acknowledged in letter
Project cost
Resolved
07/19/2022

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational.
Licensed Contractors Approved 07/14/2022 07/19/2022
Joe Frogge
LC - MEP Subs
Resolved
07/19/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumbing contractor. (Deer Creek plumbing not licensed with us)
Fire Plan Review Approved with Conditions 07/14/2022 07/13/2022
Jim Eden
Fire Plan Review Approved with Conditions 07/06/2022 07/06/2022
Jim Eden
Address numbers required
Resolved
07/13/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required: The buildings shall be designated A, B, and C. Verified at inspection.
Locks on gates or barriers
Resolved
07/13/2022

2018 IFC 506.1.1-Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required- Provide a Knox padlock on the gate going to the Phase 1 building.
Miscellaneous Correction
Corrective Action Required
07/06/2022

Provide paint booth specifications and fire protection plans.
Portable fire extinguishers - general
Resolved
07/13/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Miscellaneous Correction
Resolved
07/13/2022

Pavement for fire department access lanes shall be heavy duty asphalt capable of supporting 75,000-pounds. Confirm asphalt type.
Misc
Informational
07/13/2022

The air compressor will be inspected by the State of Missouri.
Building Plan Review Rejected 07/06/2022 06/29/2022
Joe Frogge
IBC 1004.1 Design occupant load
Corrective Action Required
06/29/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Update cover sheet code review to show 1:100 occupant load. (using Industrial as closest comparison)
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
06/29/2022

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Provide additional restroom to comply.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
06/29/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain (or approved equivalent).
IBC 1209.2 Finish materials
Corrective Action Required
06/29/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink.
Engineered truss package
Corrective Action Required
06/29/2022

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
Misc
Corrective Action Required
06/29/2022

Inadequate information to complete review. Provide the following: - Interior wall schedule.
Suite address
Corrective Action Required
07/07/2022

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This new, southernmost building has been assigned the address 451 SE Oldham Pkwy, Unit:C
Project cost
Corrective Action Required
07/15/2022

The project cost, which is used to establish the permit fee, has not been provided.
Licensed Contractors Rejected 07/06/2022 06/29/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/29/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/29/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumbing contractor.
Final Development Plan Review Approved 06/28/2022
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $2,288.00 $2,288.00 Paid 07/19/2022
8331507-Sewer Connection Fee $90.00 $90.00 Paid 07/19/2022
7232302-Commercial Excise Tax Fee $8,130.00 $8,130.00 Paid 07/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Partial 7/29/2022 7/29/2022 07/29/2022
Misc
Informational
07/29/2022
7-29-22 RH. Silt fence is being installed around footprint of job site. Silt fence that is up looks to be in working order.
Footing Inspection - Commercial Passed 8/23/2022 (10:00) 8/23/2022 08/23/2022
Underslab Plumbing Inspection - Commercial Passed 8/26/2022 8/26/2022 08/26/2022
In-wall Inspection Partial 9/30/2022 9/30/2022 09/30/2022
Misc
Corrective Action Required
09/30/2022
-Strap top plate lapped less than 4' -Provide anchor bolts within12" of plate breaks -Complete MEPs and holddowns **TRUSSES OK TO COVER
In-wall Inspection Passed 10/5/2022 10/05/2022
Misc
Resolved
10/05/2022
-Strap top plate lapped less than 4' -Provide anchor bolts within12" of plate breaks -Complete MEPs and holddowns **TRUSSES OK TO COVER
Gas Service Inspection - Commercial Passed 10/21/2022 10/21/2022 10/21/2022
Underground Electrical Inspection - Commercial Partial 11/9/2022 11/9/2022 11/09/2022
Misc
Informational
11/09/2022
Secondary conduit from transformer location to service
Electrical Service Inspection Failed 12/30/2022 12/30/2022 12/30/2022
Misc
Corrective Action Required
12/30/2022
-Connect all grounding electrode conductors to neutral bar -Provide main bonding jumper
Electrical Service Inspection Failed 12/30/2022
Misc
Corrective Action Required
12/30/2022
-Connect all grounding electrode conductors to neutral bar -Provide main bonding jumper -Provide address for meter can
Electrical Service Inspection Passed 2/1/2023 2/1/2023 02/01/2023
Misc
Resolved
02/01/2023
Underground Electrical Inspection - Commercial Passed 02/08/2023
Misc
Resolved
02/08/2023
Secondary conduit from transformer location to service
Occupancy Inspection - Planning Passed 2/8/2023 2/8/2023 02/08/2023
Occupancy Inspection - Codes Commercial Failed 2/8/2023 2/8/2023 02/08/2023
Misc
Corrective Action Required
02/08/2023
-Complete corrections for all other departments (fire and water) -Provide address for building on street side of building -Provide access to attic for above ceiling inspection at hard lids -Provide accessible restroom signage -Label panels -GFCI at SE exterior corner not working -Paint exterior gas lines with corrosion resistant paint
Occupancy Inspection - Engineering Passed 2/8/2023 2/8/2023 02/08/2023
Misc
Informational
02/08/2023
Everything has been completed. (SR)
Occupancy Inspection - Fire Failed 2/8/2023 2/8/2023 02/08/2023
Corrective Action Required
02/08/2023
Add addressing both buildings corner visual to street side
Occupancy Inspection - Codes Commercial Full C of O 2/10/2023 2/10/2023 02/10/2023
Misc
Resolved
02/10/2023
-Complete corrections for all other departments (fire and water) -Provide address for building on street side of building -Provide access to attic for above ceiling inspection at hard lids -Provide accessible restroom signage -Label panels -GFCI at SE exterior corner not working -Paint exterior gas lines with corrosion resistant paint
Above Ceiling Inspection Passed 02/10/2023
Occupancy Inspection - Fire Passed 2/10/2023 2/10/2023 02/10/2023
Documents & Images
Date Uploaded File Type Document Name
06/21/2022 Application Form Commercial Permit Application Crash Champions 4200SF Body Shop
06/21/2022 Plans Crash Champions Lees Summit Body Shop Permit Set
06/21/2022 Letter License Tax Bill
06/28/2022 Approved Plans Approved Crash Champions FDP
07/07/2022 Letter DS P/R Corrections Document
07/07/2022 Letter DS P_R Corrections Document response letter
07/07/2022 Plans Crash Champions Lees Summit Body Shop Permit Set
07/13/2022 Plans Crash Champions Lees Summit Body Shop Permit Set
07/15/2022 Plans Crash Champions - Body Shop - Wood Truss - shop drawings
07/15/2022 Receipt Receipt for transaction: 2022-005809
07/19/2022 Code Mod Request Crash Champs - CMR
07/19/2022 Approved Plans approved - Crash Champions Lees Summit Body Shop Permit Set0
07/19/2022 Receipt Receipt for transaction:2022-005892
07/19/2022 Letter DS Building Permit
07/21/2022 Letter Fire Building Plan Review
07/29/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
09/19/2022 Plans Crash Champions - Revisions 9-19-22
09/23/2022 Plans Crash Champions Unit C - Revisions 09-23-22
09/23/2022 Approved Plans approved - Crash Champions Unit C - Revisions 09-23-22
09/30/2022 Letter INSPECTION SUMMARY
10/05/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
12/30/2022 Letter INSPECTION SUMMARY
12/30/2022 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter Fire Loss Reduction Form
02/08/2023 Letter INSPECTION SUMMARY
02/10/2023 Letter Codes Final Certificate of Occupancy
02/10/2023 Letter Field Certificate of Occupancy
02/10/2023 Letter Fire Loss Reduction Form
02/10/2023 Letter INSPECTION SUMMARY
02/10/2023 Letter INSPECTION SUMMARY
02/10/2023 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home