Planning Application Status

PL2025294




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025294
Casey's - Oldham Village Lot 18
Commercial Final Development Plan
Commercial Final Development Plan
In Plan Review
10/27/2025
OLDHAM INVESTORS LLC
Convenience store with fuel sales. Lot 18 Oldham Village phase 2
Locations
Contacts
Jeff Laubach, Address:101 S. Kansas Ave., Phone:(875) 215-8630  
SBB Engineering, LLC, Address:Attn: Jeff Laubach, Phone:(785) 215-8630  
CASEYS MARKETING COMPANY, Address:1 SE CONVENIENCE BLVD  
OLDHAM INVESTORS LLC, Address:7200 W 132ND ST STE 150  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Corrections 11/20/2025 11/06/2025
Jim Eden
Code Statement
Corrective Action Required
11/06/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
UST's
Informational
11/06/2025

The installation of underground fuel storage tanks (UST’s) shall comply with the 2018 International Fire Code and the requirements of the Missouri Department of Natural Resources.
Hazmat
Corrective Action Required
11/06/2025

IFC 105.6.20 - A Hazardous materials permit is required for the using, dispensing, transporting, handling, and/or storing of extremely hazardous substances. “Extremely Hazardous Substances (EHS) Facilities” are defined as facilities subject to the provisions of Superfund Amendments and Reauthorization Act of 1986 (SARA TITLE III), Section 302, for storing, dispensing, using, or handling of listed chemicals in excess of their threshold planning quantities (TPQ). See amended Section 5001.4 of the 2012 International Fire Code. A Hazardous Materials Permit is required for retail fuel storage over the TPQ. A permit is also required for the operation of a propane cylinder exchange program. Submit a separate permit application.
Hydrants
Corrective Action Required
11/06/2025

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. There are no hydrants shown on the Utility Plan except for the one being removed for the turn lane. .
Planning Review Pending 11/20/2025
Hector Soto Jr.
Engineering Review Pending 11/20/2025
Gene Williams, P.E.
Traffic Review Pending 11/20/2025
Erin Ralovo
Building Codes Review Pending 11/20/2025
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 11/05/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
10/27/2025 Application Form Application Form_PL2025294
11/05/2025 Plans Building-Canopy Elevations
11/05/2025 Plans Civil Plans
11/05/2025 Application Form FDP Application Casey's Lee's Summit
11/05/2025 Plans Lighting Plan
11/05/2025 Specifications Lighting Specifications
11/05/2025 Plans Sign Packet
11/05/2025 Receipt Receipt for transaction:2025-008222
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home