Planning Application Status

PL2025173




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025173
AT&T monopole equipment upgrades
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/08/2025
Replacing existing tower mounted antennas and radio unit. Project - KS4130 Green Nokia Swap
Locations
Contacts
Paul Jeffreys, Network Real Estate, Address:1676 Bryan Rd., Suite 100, Phone:(417) 262-3170  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/26/2025 09/19/2025
Grant White
Planning Review Corrections 09/16/2025 09/16/2025
Hector Soto Jr.
Corrective Action Required
09/16/2025

MAINTENANCE ITEMS. Provide an action plan with timelines to address the maintenance issues identified on pages 3-7 of the Tower Condition Assessment & Maintenance Inspection dated September 9, 2025.
Planning Review Corrections 08/13/2025 08/12/2025
Hector Soto Jr.
Corrective Action Required
08/12/2025

INSPECTION REPORT. Submit a copy of a physical inspection report of the tower performed within the last 3 years evaluating the actual physical state of repair of the subject tower. The tower inspection report submitted in response to the comment above was performed on 11/5/21, which is 3 years and 9 months ago. The inspection report is 9 months too old to be acceptable to satisfy City ordinance.
Planning Review Corrections 08/06/2025 07/31/2025
Hector Soto Jr.
Corrective Action Required
07/31/2025

INSPECTION REPORT. Submit a copy of a physical inspection report of the tower performed within the last 3 years evaluating the actual physical state of repair of the subject tower.
Building Codes Review No Comments 07/24/2025 07/23/2025
Joe Frogge
Engineering Review No Comments 07/24/2025 07/21/2025
Sue Pyles, P.E.
Planning Review Corrections 07/24/2025 07/21/2025
Hector Soto Jr.
Corrective Action Required
07/21/2025

APPLICATION. Submit a copy of the application form and ownership authorization form signed by the property owner of record.
Corrective Action Required
07/21/2025

STRUCTURAL ANALYSIS. Submit a structural integrity study completed and certified by a licensed professional engineer. The study should include, at a minimum, the following items: 1) tower type, age, manufacturer, model number, and all current and proposed antennas and their owners; 2) a review of wind and ice load design criteria under current conditions and with the proposed additions/changes; and 3) a statement indicating the condition of the tower's foundation.
Corrective Action Required
07/21/2025

INSPECTION REPORT. Submit a copy of a physical inspection report of the tower performed within the last 3 years evaluating the actual physical state of repair of the subject tower.
Corrective Action Required
07/21/2025

INSURANCE. Provide proof of general liability insurance for claims from injury or death and property damage in an amount approved by the City, but not less than $2,000,000.00 per occurrence for personal injury and $2,000,000.00 per occurrence for property damage with the City listed and endorsed as an additional insured. The policy shall also include an endorsed waiver of subrogation against the City.
Traffic Review No Comments 07/24/2025 07/21/2025
Erin Ralovo
Fire Review No Comments 07/24/2025 07/10/2025
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 07/11/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/10/2025 Plans Plan set_Rev 0_PL2025173
07/10/2025 Application Form Application form_not signed_PL2025173
07/11/2025 Receipt Receipt_PL2025173
07/24/2025 Letter Applicant Letter_Rev 0_PL2025173
07/30/2025 Engineer Report/Study Structural Analysis_PL2025173
07/30/2025 Activity Document COI_PL2025173
07/30/2025 Application Form Ownership Affidavit_signed_PL2025173
08/06/2025 Letter Applicant Letter_Rev 0_PL2025173
08/06/2025 HTMO1589 Green TIA Report_11.9.2021
08/13/2025 Letter Applicant Letter_Rev 1_PL2025173
09/09/2025 Engineer Report/Study TIA_Condition_Assessment_Report_2025-09-09
09/16/2025 Letter Applicant Letter_Rev 2_PL2025173
09/18/2025 Email Response to comments email_Rev 2_PL2025173
09/22/2025 Approved Plans Approved FDP_AT&T monopole equipment upgrades_211 Green St_PL2025173_9.22.2025
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home