Planning Application Status

PL2024308




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024308
Cobey Creek 2nd Plat
Final Plat
Final Plat
City Council
11/20/2024
CLAYTON PROPERTIES GROUP INC
87 Lot Addition to existing Cobey Creek Residential Development
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Jake Konnesky, Address:8455 College Blvd  
Marshall Fief, Address:8455 College Boulevard, Phone:(316) 213-3964  
Sam DePriest, Address:8455 College Blvd, Phone:(816) 777-0400 Ext:525  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 02/18/2025 02/18/2025
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Resolved
02/18/2025

See separate pdf markup showing errors on the Final Plat. Changes were made to the plat from the previous submittal, but either did not resolve the issue or added to the problem. Tract I is called-out in the dedication language despite it not existing, "tracks" are called-out now rather than "tracts", "Track K" is now dedicated as a stormwater detention facility despite it being a monumnent sign tract. Correction required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/10/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/10/2025

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #05 As-Graded MDP
Corrective Action Required
02/10/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
Planning Review Approved with Conditions 02/18/2025 02/18/2025
Hector Soto Jr.
Corrective Action Required
02/18/2025

COMMON AREA TRACTS. A copy of the CC&Rs shall be provided for review to show that the newly created common area tracts are subject to the common area language contained in said document in accordance with UDO Section 4.290. No immediate action is required on the CC&Rs comment, but they are required to be submitted for review and approved prior to the release of the plat for recording. The comment is being kept for documentation and informational purposes.
Planning Review Corrections 02/04/2025 02/04/2025
Hector Soto Jr.
Corrective Action Required
01/30/2025

COMMON AREA TRACTS. A copy of the CC&Rs shall be provided for review to show that the newly created common area tracts are subject to the common area language contained in said document in accordance with UDO Section 4.290. No immediate action is required on the CC&Rs comment, but they are required to be submitted for review and approved prior to the release of the plat for recording. The comment is being kept for documentation and informational purposes.
Corrective Action Required
01/30/2025

ADDRESSES. Revise address for Tract M from 3502 to 502, as it will be addressed off of SE Carter Rd (502 SE Carter Rd). The previously made comment above was not addressed with the most recent resubmittal. The address correction shall be made prior to mylars and paper copies being submitted for signatures.
Corrective Action Required
02/04/2025

PROPERTY LINE INFORMATION. Provide dimension and bearing information for the three (3) line segments that make up the right-of-way/plat boundary at the northwest corner of the subdivision, adjacent to the intersection of SE Cobey Creek Dr and SE Sunset Ridge Dr. This also applies to the angled (NE) corner of Lot 162 and south boundary of Lot 160.
Engineering Review Corrections 02/04/2025 02/04/2025
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
02/04/2025

See separate pdf markup showing errors on the Final Plat. Changes were made to the plat from the previous submittal, but either did not resolve the issue or added to the problem. Tract I is called-out in the dedication language despite it not existing, "tracks" are called-out now rather than "tracts", "Track K" is now dedicated as a stormwater detention facility despite it being a monumnent sign tract. Correction required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/28/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/28/2025

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #05 As-Graded MDP
Corrective Action Required
01/28/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
Engineering Review Corrections 01/16/2025 01/16/2025
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Partial Correction
01/16/2025

Tract F is called-out on Sheet 1, but on Sheet 3 the same tract is called-out as Tract D. Also, I am seeing only the following tracts on the revised plat: 1) B, 2) C, 3) K, 4) F, 5) D, 6) A, 7) M. You are calling out C, F, H, I, K, L, M, and N. Since there seems to be ongoing issues with resolving these issues, recommend a full review of all tracts shown on the dedication language, and the plat, and ensuring all are properly accounted for and shown correctly on the plat. Correction required.
DE C&O #02 Master Drainage Plan
Resolved
01/16/2025

Detail A and Detail B on Sheet 4 of 4 should be shown with more details such as width of each element, and easement callouts and widths. Correction required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/09/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/09/2025

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #05 As-Graded MDP
Corrective Action Required
01/09/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
Traffic Review No Comments 01/16/2025 01/13/2025
Erin Ralovo
Planning Review Approved with Conditions 01/16/2025 01/13/2025
Hector Soto Jr.
Corrective Action Required
01/13/2025

COMMON AREA TRACTS. A copy of the CC&Rs shall be provided for review to show that the newly created common area tracts are subject to the common area language contained in said document in accordance with UDO Section 4.290. No immediate action is required on the CC&Rs comment, but they are required to be submitted for review and approved prior to the release of the plat for recording. The comment is being kept for documentation and informational purposes.
Corrective Action Required
01/13/2025

ADDRESSES. Revise address for Tract M from 3502 to 502, as it will be addressed off of SE Carter Rd (502 SE Carter Rd).
GIS Review No Comments 01/16/2025 01/10/2025
Kathy Kraemer
Traffic Review Corrections 12/31/2024 01/08/2025
Scott Ready
Corrective Action Required
01/08/2025

SE Sunset Drive already exists in the city and therefore is not a viable street name. SE Sunset Ridge Drive or SE Sunset Ridge Blvd would be preferred. Please change.
GIS Plat Review No Comments 12/31/2024 01/02/2025
Kathy Kraemer
Engineering Review Approved with Conditions 12/31/2024 12/31/2024
Gene Williams, P.E.
Corrective Action Required
12/31/2024

Dedication language on Sheet 1 of 4 is still showing Tract B as a stormwater tract. I am showing Tract B as the monument sign tract near M150. Correction required.
Corrective Action Required
12/31/2024

Detail A and Detail B on Sheet 4 of 4 should be shown with more details such as width of each element, and easement callouts and widths. Correction required.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
12/31/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
12/31/2024

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/31/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/31/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #05 As-Graded MDP
Corrective Action Required
12/31/2024

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
12/31/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
Planning Review Approved with Conditions 12/31/2024 12/31/2024
Hector Soto Jr.
Corrective Action Required
12/31/2024

TRACT NAMES. Staff overlooked in the previous review that a Tract J already exists in Cobey Creek, 1st Plat. The proposed Tract J in the proposed 2nd Plat shall be renamed Tract N.
Corrective Action Required
12/31/2024

PLAT TITLE. Revise the plat title and all plat title references throughout the drawing to reflect the revised tract name.
Corrective Action Required
12/31/2024

SIDEWALKS. 1) The sidewalk locations are shown on the plat cover sheet (Sheet 1), but not shown on any other sheet. Show, label and dimension the required 5' sidewalks on Sheets 2-4. 2) Add the following sidewalk locations on the drawing: add sidewalks to both sides of SE Cobey Creek Dr south of SE Gillette St; add sidewalk to the east side of SE Cobey Creek Dr north of SE Gillette St; add sidewalks to both sides of SE Gillette St east of SE Cobey Creek Dr.
Corrective Action Required
12/31/2024

COMMON AREA TRACTS. 1) Update the common area dedication note to include the renamed Tract N 2) A copy of the CC&Rs shall be provided for review to show that the newly created common area tracts are subject to the common area language contained in said document in accordance with UDO Section 4.290. No immediate action is required on the CC&Rs comment, but they are required to be submitted for review and approved prior to the release of the plat for recording.
Corrective Action Required
12/31/2024

ACCESS RESTRICTION NOTE. Label each affected lot (Lots 31-45 and 174-184) with symbology or note that references to the access restriction note.
Corrective Action Required
12/31/2024

ADDRESSES. Label the following addresses for Tracts M and I off of SE Carter Rd: Tract M -- 502; and Tract I -- 506.
Engineering Review Corrections 12/10/2024 12/10/2024
Gene Williams, P.E.
Corrective Action Required
12/05/2024

Tracts B and C are listed within the dedication language as detention tracts. However, Tracts B and C are called-out at the new intersections at M-150 near the ADA-accessible ramps and are not stormwater detention tracts. Correction required.
Corrective Action Required
12/05/2024

Why are tracts being being dedicated at both new entrances to M-150? There does not appear to be a compelling reason to dedicate tracts at these locations. Correction required.
Corrective Action Required
12/10/2024

The tracts at the intersection introduce an issue with contiguous easement. A continuous easement from the right of way to the edge of the easement shall be established. As shown with the tracts, the easement is not contiguous with the right of way, and separated by a tract. Correction required.
Corrective Action Required
12/10/2024

In addition to showing sidewalks (see Planning comments related to sidewalks), show the general geometry of all ADA-accessible ramps on the plat. Correction required.
Corrective Action Required
12/10/2024

Sheet 1 of 4: Common area note on right side of plat describes Tracts A, B, and K as stormwater detention tracts. Tract B is shown on Sheet 4 of 4 as a tract within the limits of the ADA-accessible ramp. Correction required.
Corrective Action Required
12/10/2024

Ensure all tract callouts match what is shown on the dedication language on the right side of Sheet 1 of 4. Correction required.
Planning Review Corrections 12/10/2024 12/09/2024
Hector Soto Jr.
Corrective Action Required
12/09/2024

DRAWING DATE. Fill in the drawing date in the Drawing Information box on Sheet 1.
Corrective Action Required
12/09/2024

TRACT NAMES. The proposed plat shows tracts titled A through I. The proposed plat duplicates tract names that already exist in the initial Cobey Creek, 1st Plat, namely Tracts D, E, G and H. Tract names cannot be duplicated. Re-label will different names that don't already exist.
Corrective Action Required
12/09/2024

PLAT TITLE. Include the proposed lot number and tract names in the plat title and update all references to the plat title on the drawing accordingly. The plat title shall be revised to read, Cobey Creek, 2nd Plat, Lots 31-91, 160-184, 297 & Tracts __ (fill in blank with revised tract names).
Corrective Action Required
12/09/2024

PROPERTY LINE INFORMATION. Label the west property line dimensions for Lot 72 and Tract J.
Corrective Action Required
12/09/2024

STREET NAMES. 1) The proposed street segment named Madison Rd shall be changed to SE Carter Rd since it aligns with said street. 2) The proposed street segment along the south side of Lots 40, 51 and 65 named Carter Rd shall be changed because it does not align with the existing SE Carter Rd in the first plat or the preceding segment commented upon. 3) The proposed street name of Sunset Ridge shall be revised. "Ridge" is no longer an acceptable street name suffix in the city, unless it is an extension of a street already named as such. 4) Add the SE directional prefix to all proposed street names.
Corrective Action Required
12/09/2024

SIDEWALKS. Show and label all 5' sidewalks along all street frontages.
Corrective Action Required
12/09/2024

BUILDING LINES. Extend the 25' building setback line along the west street frontage of Lots 174-182.
Corrective Action Required
12/09/2024

EASEMENTS. Label and dimension the 10' U/E along the north boundaries of Lots 162 and 163.
Corrective Action Required
12/09/2024

COMMON AREA TRACTS. 1) The common area note references a Tract K, but there doesn't appear to be a Tract K shown on the drawing. 2) A copy of the CC&Rs shall be provided for review to show that the newly created common area tracts are subject to the common area language contained in said document in accordance with UDO Section 4.290.
Corrective Action Required
12/09/2024

CITY SIGNATURE BLOCK. 1) Update the year in the plat approval language and the notary certification above the City signature lines from 2024 to 2025. 2) Change the Planning Commission Secretary name from Cynda Rader to Terry Trafton. 3) Change the name and title of the Director of Development Services to Aimee Nassif, AICP, Deputy Director of Development Services. 4) The City signature block and plat approval language is required to be included on each of the four (4) plat sheets.
Corrective Action Required
12/09/2024

ACCESS RESTRICTION NOTE. Add a note to the plat indicating that no direct vehicular access shall be allowed from Lots 31-45 and 174-184 onto SE Cobey Creek Dr. Label each affected lot with symbology or note that references to the access restriction note.
Corrective Action Required
12/09/2024

ADDRESSES. Label each lot with its proposed address. A copy plat cover sheet marked up with assigned addresses has been uploaded and is accessible via the portal. The drawing is titled as the plat name and tagged with "addresses" at the end of the file name.
GIS Plat Review Corrections 12/10/2024 12/04/2024
Kathy Kraemer
Corrective Action Required
11/26/2024

missing mete/bound on drawing: lot 162 between coord 30 and 31 Tract G south line
Corrective Action Required
11/26/2024

L1 drawing does not match the legal: 50.89 vs 50
Corrective Action Required
11/27/2024

C/L of Sunset Ridge has 2 different bearings with the same distance. Which is correct?
Corrective Action Required
11/27/2024

Tract A is missing south and west dimensions
Corrective Action Required
12/02/2024

Something is off on lots 72, 73, 74, and tract J. The back lot line of tract J says it is 147.38, which matches the backs of lots 73 & 74. But VISIBLY on the drawing, those cannot be the same since the south lot line of tract J is further north than a length of 147.38 would suggest; it is closer to 140 than 147. Please check and revise
Traffic Review Corrections 12/10/2024 12/02/2024
Erin Ralovo
Corrective Action Required
12/02/2024

Please show all sidewalks on the plat.
Fire Review No Comments 12/10/2024 11/27/2024
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Final Plat fee $1,111.00 $1,111.00 Paid 11/26/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 03/27/2025 5:00 PM Council Chambers 03/27/2025 05:00 PM
Agenda Item
Approved
03/27/2025
City Council Ordinance 1st Reading 04/08/2025 6:00 PM Council Chambers 04/08/2025 06:00 PM
Agenda Item
Approved
Documents & Images
Date Uploaded File Type Document Name
11/20/2024 Letter Cobey Creek 2nd Plat - Map Check 2024-11-20
11/20/2024 Letter Cobey Creek 2nd Plat - Description 2024-11-20
11/20/2024 Plans Full Plan Set_Rev 0_PL2024308
11/20/2024 Application Form Application_PL2024308
11/20/2024 Letter Resolutions_Consent - Grant Authority to GC _Summit 2024-11-20
11/26/2024 Receipt Receipt for transaction:2024-009188
12/09/2024 Drawing Cobey Creek 2nd Plat - addresses
12/10/2024 Letter FP Applicant Letter
12/20/2024 Letter Comment Response Letter_Rev 0
12/20/2024 Plans Full Plan Set_Rev_1_PL2024308
01/02/2025 Letter FP Applicant Letter_PL2024308
01/08/2025 Letter Applicant Letter - FP (DRCF)
01/09/2025 Plans Full Plan Set_REV_2_PL2024308
01/09/2025 Letter Cobey Creek 2nd Plat - Comment Response_REV_2
01/16/2025 Letter FP Applicant Letter
01/28/2025 Letter Cobey Creek 2nd Plat - Comment Response_REV_3
01/28/2025 Plans Full Plan Set_REV_3_PL2024308
02/04/2025 Letter Applicant Letter - FP (DRCF)
02/10/2025 Letter Comment Response Letter_Rev 1
02/10/2025 Plans Full Plan Set_REV_4_PL2024308
02/18/2025 Letter FP Applicant Letter
03/06/2025 Drawing Location Map
03/19/2025 Letter Staff Report
03/28/2025 Ordinance Draft Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home