Planning Application Status

PL2024260




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024260
ADA intersection - SOWP North
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/09/2024
CITY OF LEES SUMMIT
ADA improvements at the north two intersections of Streets of West Pryor.
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
DAVID OLSON, Address:1035 SE QUINCY ST, Phone:(800) 591-7378  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 06/10/2025 06/03/2025
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
06/03/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/03/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #11 Pavement Thickness
Corrective Action Required
06/03/2025

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Future Repair Work
Corrective Action Required
06/03/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
06/03/2025

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $601.14
Engineering Review Corrections 05/30/2025 05/28/2025
Susan Nelson, P.E.
Corrective Action Required
05/28/2025

Please make the design notations more clearly visible for the black solid hatch areas of the east intersection.
Corrective Action Required
05/28/2025

Add a note to remove and replace the existing curb where the ramp is being removed in the northwest quadrant of the west intersection.
Corrective Action Required
05/28/2025

Add a TS (turning space) designation to the north turning space in the southwest quadrant of the west intersection.
Engineering Review Corrections 05/19/2025 05/19/2025
Susan Nelson, P.E.
Corrective Action Required
05/19/2025

Extend plan views to show all tie-in points. Add dimensions of the tie-ins to aid construction in the field.
Corrective Action Required
05/19/2025

Add sidewalk geometric information for the southwest quadrant of the west intersection. Add turning space slope and cross slope, with call outs no greater than 1.5%, for the northwest and the northeast quadrant of the east intersection.
Corrective Action Required
05/19/2025

Add build information for the black areas between the curb ramps of the east intersection.
Corrective Action Required
05/19/2025

Add a note to remove the existing sidewalk/curb ramp in the northwest quadrant of the west intersection. Show removal of the existing curb ramp in the northeast quadrant of the west intersection.
Corrective Action Required
05/19/2025

Add the City Standard Detail GEN-3A for sidewalk/ramps.
Corrective Action Required
05/19/2025

Typical “asphalt” pavement sections show “concrete” as the pavement material, please revise for clarity.
Traffic Review No Comments 05/19/2025 05/19/2025
Erin Ralovo
Engineering Review Corrections 01/31/2025 01/30/2025
Susan Nelson, P.E.
Corrective Action Required
01/30/2025

The Project Manager will facilitate a meeting to discuss ADA sidewalk requirements with City staff.
Corrective Action Required
01/30/2025

Add removals and new pavement items to the Engineer’s Estimate.
Engineering Review Corrections 12/31/2024 12/31/2024
Susan Nelson, P.E.
Corrective Action Required
12/31/2024

Add turning areas of appropriate size and acceptable cross slope at all locations that tie into the existing sidewalk. Add slopes and dimensions to the panels before all new pedestrian facilities.
Corrective Action Required
12/31/2024

Add an additional ADA turning space for the ramps at the northwest quadrant of the east intersection at the entrance to the roadway. Show the slopes in all turning spaces.
Corrective Action Required
12/31/2024

Add an additional ADA turning space in the southeast quadrant of the west intersection where there is just an “L” designation where the sidewalk changes direction.
Corrective Action Required
12/31/2024

The detectable warning surface is located too far from the roadway on the ramp in southwest quadrant of the west intersection. Add slopes to this quadrant.
Corrective Action Required
12/31/2024

Please make sure all ramps, turning spaces, and sidewalks have slope, cross slope, and dimensioning shown. Verify placement of all detectable warning surfaces.
Corrective Action Required
12/31/2024

Verify that the pavement replacement material in the plans and the typical sections agree. Show all existing ramp and sidewalk removals.
Corrective Action Required
12/31/2024

Provide Engineer's Estimate of Probable Construction Costs.
Engineering Review Corrections 12/04/2024 12/02/2024
Susan Nelson, P.E.
Corrective Action Required
12/02/2024

Add City Standard Details for curbs, sidewalks, etc. Provide the pavement section and material information on the plans.
Corrective Action Required
12/02/2024

Add turning areas of appropriate size and acceptable cross slope at all locations that tie into the existing sidewalk. Revise cross slopes to 1.5% maximum and increase turning areas to a minimum size of 4’x4’. See City Standard Details.
Corrective Action Required
12/02/2024

Add geometric design information for all sidewalks, turning areas, and curb ramps. Ensure all design elements meet all ADA requirements.
Corrective Action Required
12/02/2024

Show removal of the existing curb ramps that do not fit with the redesign. Show replacement of curb and gutter.
Corrective Action Required
12/02/2024

Provide better alignment on the southeast most curb ramp so that the pedestrian turning area is not within the roadway.
Corrective Action Required
12/02/2024

Provide Engineer's Estimate of Probable Construction Costs.
Engineering Review Corrections 11/14/2024 11/14/2024
Susan Nelson, P.E.
Corrective Action Required
11/14/2024

Revise design to comply with all ADA sidewalk and curb ramp requirements. Note that turning spaces within the roadway will not be allowed.
Corrective Action Required
11/14/2024

Provide better directional movement through crossings. If more guidance is desired, please schedule a meeting to discuss this in further detail.
Corrective Action Required
11/14/2024

Add City standard details for curbs, sidewalks, etc.
Corrective Action Required
11/14/2024

Provide Engineer's Estimate of Probable Construction Costs.
Planning Review No Comments 11/14/2024 11/12/2024
Hector Soto Jr.
Planning Review No Comments 10/23/2024 10/21/2024
Hector Soto Jr.
Engineering Review Corrections 10/23/2024 10/16/2024
Susan Nelson, P.E.
Corrective Action Required
10/16/2024

The conceptual layout of the street crossings is acceptable. A comprehensive review will commence once a complete set of plans is submitted.
Hearings

There are no hearings for this planning application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home