Planning Application Status

PL2024131




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024131
MCC-Longview Automotive Institute
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/22/2024
JR COLLEGE DISTRICT OF METROPOLITAN KCMO
36,000 s.f. Building Addition
Locations
Contacts
JR COLLEGE DISTRICT OF METROPOLITAN KCMO, Address:3200 BROADWAY  
DLR GROUP, Address:7290 W 133RD ST, Phone:(913) 897-7811  
Taliaferro & Browne, Address:1020 E. 8th St, Phone:(816) 283-3456  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 07/19/2024 07/19/2024
Sue Pyles, P.E.
DE Commercial Detention Basin
Corrective Action Required
07/19/2024

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any occupancy permit for the proposed development.
DE Contact Field Eng. Inspector
Corrective Action Required
07/19/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
07/19/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)). These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $24,158.37
DE Future Repair Work
Corrective Action Required
07/19/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 07/19/2024 07/12/2024
Mike Weisenborn
Traffic Review No Comments 07/19/2024 07/12/2024
Mike Weisenborn
Planning Review No Comments 07/19/2024 07/12/2024
Mike Weisenborn
Fire Review Approved with Conditions 07/19/2024 07/12/2024
Mike Weisenborn
Code Statement
Corrective Action Required
07/12/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Engineering Review Corrections 07/08/2024 07/08/2024
Gene Williams, P.E.
Corrective Action Required
07/08/2024

Profile view of storm line 1 (i.e., the discharge line for the detention basin) is shown with insufficient cover toward the last 50 feet of the run just prior to the flared end section. However, when compared to the plan view, it appears from the plan view that the storm line terminates prior to what is shown on the profile view. Please evaluate and reconcile the discrepancy either on the plan view, the profile view, or both.
Corrective Action Required
07/08/2024

The hydraulic grade line for the 100 year event was missing on storm line 1 (i.e., the discharge line from the detention basin). The 100 year hydraulic grade line shall be at or below the crown of the pipe, as this line shall be designed to manage the 100 year flow from the detention basin.
Corrective Action Required
07/08/2024

Sheet C4.22: The detention basin sheet was missing the following items: 1) top of dam, 2) crest of emergency spillway, 3) 100 year water surface elevation for design (i.e., nominal) condition, 4) 100 year water surface elevation for the 100 percent clogged/zero available storage condition both in numerical and graphical format, 5) cross-section of dam, outlet structure, emergency spillway, and top of dam with the above information, and 6) 100 year storage (nominal condition). Please provide this information on the sheet so that a quick review of the as-built detention basin sheet can be performed to facilitate a permit for occupancy.
Building Codes Review No Comments 07/08/2024 07/08/2024
Joe Frogge
Miscellaneous Correction
Resolved
07/08/2024

Provide flow calculations to justify use of 4" water meter. Some considerations: - 4" Meter is approximately $130,000.00 - 4" meter requires design and installation of custom pit. - 4" meter triggers sanitary fee of $55,375.00 - We recommend multiple 2" meters to satisfy flow where required as we provide the pit and total fees are closer to $40,000 7/8/2024 - Meters have been removed due to the water lines on site being private.
Fire Review Approved with Conditions 07/08/2024 07/05/2024
Jim Eden
Code Statement
Corrective Action Required
07/08/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Fire Lanes - Marking
Resolved
07/05/2024

IFC 503.3 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Action needed- Post the curb along the west parking lot and the curb near the hydrant in the southeast parking lot, and lane to the north part of the building.
Planning Review No Comments 07/08/2024 07/01/2024
Claire Byers
Traffic Review No Comments 07/08/2024 07/01/2024
Scott Ready
Engineering Review Corrections 06/20/2024 06/20/2024
Gene Williams, P.E.
Corrective Action Required
06/20/2024

Water Utilities is checking to see whether a water meter(s) exists near the intersection of 3rd St. and View High Dr. If so, there would not be any need for additional water meters for this project. All of the water lines within the boundary of the Longview College property are private, and if you desire to sub-meter, it would be a private sub-meter(s). Please wait until you hear back from me.
Corrective Action Required
06/20/2024

Stormwater report appeared to be missing the existing condition drainage area with a point of interest(s), and the post-construction drainage area map with point of interest(s). Please provide both of these, and ensure there are appropriate points of interest on both.
Corrective Action Required
06/20/2024

Does the detention system meet the Comprehensive Control Strategy discussed in Section 5600 of the KCAPWA? If so, please state this fact ini the Conclusions section.
Corrective Action Required
06/20/2024

Detention basin sheet should be provided on one (1) single sheet to facilitate project closeout. An as-built of the basin and outlet structure shall be required prior to any occupancy permit, and this will enable a quick check prior to issuing the occupancy permit. Items to include on this sheet include the following: 1. Top of dam elevation, 2. Emergency spillway elevation, 3. All weir and orifice elevations that are part of the outlet structure, 4. 100 year nominal (i.e., design) storage volume, 5. Bottom of basin elevation, 6. Bottom of basin slope callouts, which may be less than 2% to achieve water quality objectives (i.e., we have seen as little as 0.5% in some instances to achieve water quality objectives), 7. 100 year nominal (i.e., design) water surface elevation (WSE), 8. 100 year clogged/zero available storage WSE, 9.Graphical limits of the 100 year clogged/zero available storage WSE (i.e., shown on the plan view with callouts), along with dimensional callouts from property lines and buildings to ensure a minimum 20 foot setback, 10. Typical section view of the outlet works and dam, along with elevation callouts for the 100 year nominal and 100 year clogged/zero available storage to ensure there is a minimum 0.5 feet freeboard between the nominal condition and the crest of the emergency spillway, and a minimum 1.0 feet from the clogged condition/zero available storage and the top of dam, 11. Location and callouts showing the emergency spillway, and a clear path that is not directed towards buildings or other other vulnerable features.
Corrective Action Required
06/20/2024

A bold note shall be placed on the detention basin sheet stating "DETENTION BASIN TO BE CONSTRUCTED ALONG WITH EROSION AND SEDIMENT CONTROL DEVICES AND PRIOR TO BUILDING AND PARKING LOT. AN AS-BUILT DRAWING SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND ACCEPTANCE PRIOR TO ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY", or equivalent language.
Corrective Action Required
06/20/2024

Emergency spillway appeared to be missing from the detention basin plans. Please provide an emergency spillway in accordance with the Design and Construction Manual, and ensure all freeboard requirements are met.
Corrective Action Required
06/20/2024

The 100 year water surface elevation for the nominal event shall be shown graphically on the detention basin plans, and the 100 year 100% clogged/zero available storage condition shall also be shown. A minimum of 0.5 feet from the nominal event to the crest of the emergency spillway shall be maintained. A minimum of 1.0 feet from the clogged condition and the top of dam shall also be maintained. Please evaluate and revise as appropriate.
Corrective Action Required
06/20/2024

Profile view of the outlet storm line from the detention basin appeared to be missing. Please provide the profile view of the missing storm line from the detention basin. Ensure this line is able to manage up to the 100 year event without utilizing the emergency spillway. The emergency spillway shall only be utilized in case of clogging of outlet structure, or exceedance of the 100 year event. Please evaluate and revise as appropriate.
Corrective Action Required
06/20/2024

Scale on Sheet C4.21 does not appear valid. Please check and revise as appropriate.
Corrective Action Required
06/20/2024

Plans are vague in terms of paving. Please provide a clear and concise plan for the pavement, including notes such as "do not disturb" on the existing asphalt pavement, etc. It is my understanding that all new pavement on this project will be portland cement concrete, and if not, please clarify what and where the pavement is being proposed.
Corrective Action Required
06/20/2024

Fire Review Approved with Conditions 06/18/2024 06/19/2024
Jim Eden
Code Statement
Corrective Action Required
06/19/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Fire Lanes - Marking
Corrective Action Required
06/19/2024

IFC 503.3 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Action needed- Post the curb along the west parking lot and the curb near the hydrant in the southeast parking lot, and lane to the north part of the building.
Planning Review Corrections 06/18/2024 06/14/2024
Claire Byers
Corrective Action Required
06/14/2024

Please confirm if you will be adding any dumpster enclosures or not. If so, they will need to be shown on the plans.
Corrective Action Required
06/14/2024

All signs must be reviewed and permitted separately.
Building Codes Review Corrections 06/18/2024 06/14/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
06/14/2024

Provide flow calculations to justify use of 4" water meter. Some considerations: - 4" Meter is approximately $130,000.00 - 4" meter requires design and installation of custom pit. - 4" meter triggers sanitary fee of $55,375.00 - We recommend multiple 2" meters to satisfy flow where required as we provide the pit and total fees are closer to $40,000
Traffic Review No Comments 06/18/2024 06/14/2024
Erin Ralovo
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 06/10/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home