Summary
PL2023335
Pro Deo Youth Center
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Approved
12/06/2023
D & K REAL ESTATE & INVESTMENTS LLC
New Building and Parking Lot
Locations
Contacts
D & K REAL ESTATE & INVESTMENTS LLC, Address:3170 NE CARNEGIE DR STE 400  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Elaine Metcalf, Address:Pro Deo Youth Center, Phone:(816) 226-6806 Ext:101  
Steve Arbo  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 01/19/2024 01/19/2024
Scott Ready
Planning Review No Comments 01/19/2024 01/19/2024
Hector Soto Jr.
Fire Review Approved with Conditions 01/19/2024 01/15/2024
Scott Ready
Code Statement
Corrective Action Required
01/15/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. The building is shown with a water main for an automatic sprinkler system.
FDC
Corrective Action Required
01/15/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC on the building.
Engineering Review Approved with Conditions 01/19/2024 01/15/2024
Scott Ready
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
01/15/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/15/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/15/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
01/15/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #11 Pavement Thickness
Corrective Action Required
01/15/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
MISC
Corrective Action Required
01/15/2024

The Final Development Plan will be required to meet all City stormwater design criteria unless a Design Modification Request (waiver) is submitted and approved by the City.
Planning Review Corrections 01/12/2024 01/12/2024
Hector Soto Jr.
Corrective Action Required
01/12/2024

BUILDING ELEVATIONS/MATERIALS. Quantify the square footage and percentage use of metal panels on each of the building's four (4) sides. A percentage use of 30% has been used in the past by staff and City Council as a guide on previous projects, though projects have been approved with a higher percentage. In response to the previously made comment above, the comment response letter simply states that there is a 50% mix of materials. More specific information regarding the material mix is required. Revise architectural sheet SD106 (the color concept elevations) to include a table that provides a material percentage breakdown (i.e. metal, brick, glass) for each of the four individual building elevations. Exclude the standing seam metal roof from the material breakdown. This information is needed before the application can move forward for Planning Commission consideration.
Corrective Action Required
01/12/2024

LIGHTING. The applicant acknowledged previously made lighting comments and has responded that the project will comply with all lighting standards of UDO Article 8 at the time of final development plan.
Corrective Action Required
01/12/2024

SIDEWALKS. Per discussion previously had during the pre-application meeting, the applicant will submit a request for payment in lieu of construction of sidewalk along SE Douglas St at the time of re-plat. This previously made comment has been acknowledged by the applicant and is being kept for informational purposes. No further action is required at this time.
Corrective Action Required
01/12/2024

LANDSCAPE PLAN. A modification shall be required to allow the required fence to be placed on the property line as shown on the landscape plan versus centered within the 20' landscape buffer as required by the UDO. Staff will support a modification to allow the fence on the property line.
Corrective Action Required
01/12/2024

PLATTING. The proposed development requires the re-platting of the two parcels into a single lot. A plat shall be approved and recorded prior to the issuance of any building permit. This previously made comment has been acknowledged by the applicant and is being kept for informational purposes. No further action is required at this time.
Engineering Review Approved with Conditions 01/12/2024 01/09/2024
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
01/09/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/09/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/09/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
01/09/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #11 Pavement Thickness
Corrective Action Required
01/09/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
MISC
Corrective Action Required
01/09/2024

The Final Development Plan will be required to meet all City stormwater design criteria unless a Design Modification Request (waiver) is submitted and approved by the City.
Fire Review Approved with Conditions 01/12/2024 01/08/2024
Jim Eden
Code Statement
Corrective Action Required
01/05/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. The building is shown with a water main for an automatic sprinkler system.
FDC
Corrective Action Required
01/05/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC on the building.
Traffic Review No Comments 01/12/2024 01/05/2024
Scott Ready
Engineering Review Corrections 12/22/2023 12/22/2023
Sue Pyles, P.E.
Corrective Action Required
12/22/2023

Please revise the asphalt pavement section, KCMMB asphalt mix is now required.
Corrective Action Required
12/22/2023

Please note the existing asphalt along SE Douglas Street being removed behind the proposed temporary curb.
Corrective Action Required
12/22/2023

A minimum of 20’ is required between the detention basin 100-year (clogged) WSE boundary and any building or property line. Based on the Detention Basin Plan in the Micro Storm Water Drainage Study, it appears that the building does not meet the separation requirement. Please revise accordingly.
Corrective Action Required
12/22/2023

Pro Deo isn’t a “boys” home, please revise the drainage study General Information section.
Planning Review Corrections 12/22/2023 12/22/2023
Hector Soto Jr.
Corrective Action Required
12/21/2023

REZONING. - A rezoning map/exhibit with legal description shall be provided for the parcel (Southview Heights, Lot 9) that is proposed to be rezoned from RP-2 to CP-2 as part of this application. - The exhibit shall list the existing and proposed zoning, as well as the existing zoning of the surrounding properties located within 185' of the site.
Corrective Action Required
12/21/2023

STREETS. Label the right-of-way widths for SE 9th St, SE Douglas St and SE Blue Pkwy.
Corrective Action Required
12/21/2023

EASEMENTS. The Southview Heights plat shows that a 5' utility easement was dedicated along the west boundary of Lot 9 as part of said plat, as well as a 5' utility easement along the south boundaries of both Lots 9 and 10. The PDP drawing doesn't show said easements. The City does not seem to have any record of the easements being vacated. Show and label the existing easements.
Corrective Action Required
12/21/2023

LOT LINE INFORMATION. Label the lot line dimensions and bearings.
Corrective Action Required
12/21/2023

SIDEWALKS. Per discussion previouly had during the pre-application meeting, the applicant will submit a request for payment in lieu of construction of sidewalk along SE Douglas St at the time of re-plat.
Corrective Action Required
12/21/2023

PARKING LOT/DRIVEWAY. - Dimension the pavement width (excluding curb and gutter) of the driveway, the parking lot drive aisle and drop-off lane. The minimum pavement width for the two-way traffic areas (driveway and parking lot drive aisle) shall be 24'; the drop-off lane shall be a minimum 10' wide. - The parking lot and associated aisles are required to be set back a minimum 20' from the SE 9th St right-of-way. They are currently shown with a 15' setback. - To help avoid circulation conflicts for the drop-off lane, use pavement markings and signage (Exit Only/Do Not Enter) to identify the drop-off lane exit at the north end of the site.
Corrective Action Required
12/21/2023

BUILDING DIMENSIONS. Label the dimension/distance from the west property line to the proposed closest point of the building.
Corrective Action Required
12/21/2023

ADA PARKING SPACE. A sign shall be posted at the head of the ADA parking space identifying it as such. The sign shall be mounted a minimum 5' above finished grade, measured to the bottom of the sign.
Corrective Action Required
12/21/2023

LIGHTING. - Submit a photometric plan in accordance with UDO Section 8.230. - Parking lot lighting shall be provided in accordance with UDO Section 8.250. Provide manufacturer specifications for review. - Exterior wall-mounted fixtures shall comply with UDO Sections 8.260 and 8.270. - Please note that the maximum allowable foot-candle level at an adjoining residential property line shall not exceed 0.5 foot-candles, measured at 3' above grade.
Corrective Action Required
12/21/2023

SITE DATA TABLE. - The information on Sheet C.100 lists the current zoning as only CP-2. This is partially correct. The portion of the site composed of Lot 9 is zoned RP-2. List both current zoning districts and include a "Proposed Zoning" line item that lists CP-2. - What use designation was used to determine the listed required number of parking spaces? Based on the proposed building size, the calculation was based on slightly less than 2 spaces/1,000 sq. ft. of gross floor area. Data shall be required to be submitted in support of the proposal to only require 2 spaces/1,000 sq. ft. to demonstrate a reasonable expectation that parking demand will be satisfied at the proposed parking rate. - With the current site of Pro Deo being adjacent to the high school, it can be easily reached by foot from high schoolers after school. Is it anticipated that more vehicle parking may be necessary compared to the parking demand generated by the existing site due to the increased travel distance from the high school?
Corrective Action Required
12/21/2023

SITE LOCATION MAP. Correct the parking space number labels on the map on the cover sheet. There are 13 parking spaces along the west side of the parking lot, not 11. Add a label to capture the southern two (2) spaces along the east side of the parking lot.
Corrective Action Required
12/21/2023

TRASH ENCLOSURE. - Provide a detail of the proposed trash enclosure. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. - Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course.
Corrective Action Required
12/21/2023

BUILDING ELEVATIONS/MATERIALS. - The proposed use of metal panels on the building exterior requires approval by the Planning Commission and City Council as a conditional material. As mentioned in the pre-application meeting, the use of metal panels is not common in residential areas and as such staff has some concern about the compatibility of said material on the north and west elevations that face existing abutting single-family residential development. The softening of the material palette on those particular elevations will contribute to the building's compatibility with the residential neighborhood. The west elevation has a fairly prominent use of metal panels. - Quantify the square footage and percentage use of metal panels on each of the building's four (4) sides. A percentage use of 30% has been used in the past by staff and City Council as a guide on previous projects, though projects have been approved with a higher percentage. - Provide manufacturer specifications for the proposed metal panels to be used as an exterior material. -
Corrective Action Required
12/21/2023

LANDSCAPE PLAN. - The scale bar on the landscape plan indicates a scale of 40'. The plan is actually drawn at 20' scale. - The UDO requires tree planting areas to be a minimum 10' in width, with no tree planted less than 4' from the back of a curb. One and/or both of these requirements aren't met for all of the trees planted in the "canoe" along the west side of the drop-off lane, and the island on the south side of the drop-off lane entrance (northeast of the trash enclosure). - A high-impact landscape buffer is required along the west property boundary between the proposed development and the abutting single-family residence. The buffer shall be composed of a 6' vinyl or masonry fence plus landscaping. See UDO Section 8.900.A for the screening options. A wood fence may be an acceptable fence material alternative if the abutting resident expresses a preference for the material, but will require a modification request.
Corrective Action Required
12/21/2023

PLAN SCALE. The utility plan is listed as being drawn at 30' scale, but is actually 20' scale. Correct.
Corrective Action Required
12/21/2023

MECHANICAL EQUIPMENT. - There is no indication on the civil or achitectural plans if there will be any roof-mounted or ground-mounted mechanical equipment (e.g. A/C condensers,etc.). Show the location of any RTUs or ground equipment on the civil and/or architectural plans as appropriate. All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. Ground mounted equipment shall be totally screened from view by evergreen landscaping or masonry wall up to a height of the units to be screened. - All roof penetrations shall be placed in architecturally designed appurtenances. Small vent pipes may be painted to blend in with a roof to disguise their presence. Roof penetrations shall be shown on the preliminary and final plans to the extent possible.
Corrective Action Required
12/22/2023

PLATTING. The proposed development requires the re-platting of the two parcels into a single lot. A plat shall be approved and recorded prior to the issuance of any building permit.
Traffic Review No Comments 12/22/2023 12/21/2023
Erin Ralovo
Fire Review Approved with Conditions 12/22/2023 12/18/2023
Jim Eden
Code Statement
Informational
01/08/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Resolved
01/08/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC on the building.
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Rezoning and Preliminary Development Plan fee $3,375.00 $3,375.00 Paid 12/07/2023
Legal Notice Publishing Charge $165.00 $165.00 Paid 12/07/2023
Legal Notice Publishing Charge $165.00 $165.00 Paid 12/07/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 02/08/2024 5:00 PM Council Chambers 02/08/2024 05:00 PM
Agenda Item
Approved
02/08/2024
City Council Public Hearing 03/05/2024 6:00 PM Council Chambers 03/05/2024 06:00 PM
Agenda Item
Approved
03/05/2024
City Council Ordinance 2nd Reading 03/19/2024 6:00 PM Council Chambers 03/19/2024 06:00 PM
Agenda Item
Approved
Documents & Images
Date Uploaded File Type Document Name
12/06/2023 Plans Full Plan Set_Rev_PL2023335
12/07/2023 Receipt Receipt for transaction:2023-008962
12/07/2023 Application Form Appication Form
12/08/2023 Public Notice Document Adjacent Property List_Location Map_Word Doc pdf
12/08/2023 Public Notice Document Adjacent Property List_Excel Doc
12/11/2023 Engineer Report/Study Drainage Study 231208
12/22/2023 Letter Applicant Letter - Dev. Apps (DRCP)
12/22/2023 Public Notice Document Notice to Property Owners PC CC
01/05/2024 Letter CITY COMMENT RESPONSE 2024-1-5
01/05/2024 Drawing REZONING EXHIBIT
01/05/2024 Plans Full Plan Set_Rev 1_PL2023335
01/05/2024 Specifications Mosaic Flush Metal Wall Panel - sample submittal
01/05/2024 Specifications Vertical Reveal Wall Panel - sample submittal
01/05/2024 Meeting Summary Neighborhood Meeting Notes 1-4-2024
01/05/2024 Engineer Report/Study Drainage Study Updated 231208
01/12/2024 Letter Applicant Letter - Dev. Apps (DRCP)
01/15/2024 Letter Modification Request
01/15/2024 Plans Reduced Plan Set_Rev 2_Architectural_PL2023335
01/16/2024 Photograph Public Notice Sign - Photo 1
01/16/2024 Photograph Public Notice Sign - Photo 2
01/16/2024 Photograph Public Notice Sign - Photo 3
01/19/2024 Letter Applicant Letter - Dev. Apps (DRCP)
01/29/2024 Letter PL2023274 Pro Deo Youth Center TIA.doc
01/31/2024 Drawing Location Map
01/31/2024 Drawing Pro Deo Resubmittal 240105 _ Civil Plans only
02/02/2024 Engineer Report/Study Drainage Study 231208 - abridged version
02/02/2024 Letter Staff Report
02/06/2024 Public Notice Document 1-20 notice of public hearing Appl. #PL2023-335 rezoning preliminary develop
02/06/2024 Letter Signed Affidavit for PC and CC Notice
02/08/2024 Presentation Applicant Presentation_Pro Deo_PC Mtg 02082024
02/15/2024 Public Notice Document 2-17 notice of hearing Application #PL2023-335 – REZONING WITH PRELIMINARY DEVELOPMENT PLAN
04/01/2024 Ordinance 9869
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home