Planning Application Status

PL2023177




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023177
Summit Orchard West - Public Street Improvements
Engineering Plan Review
Engineering Plan Review
Complete
07/07/2023
TOWNSEND SUMMIT LLC
TURN LANE ADDITIONS TO ALLOW ACCESS FROM NW WARD ROAD TO 700 NW WARD RD
Locations
Contacts
TOWNSEND SUMMIT LLC, Address:230 SCHILLNG CIR STE 120  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 04/12/2024 04/12/2024
Sue Pyles, P.E.
Engineering Review No Comments 09/18/2023 09/14/2023
Sue Pyles, P.E.
Traffic Review No Comments 09/18/2023 09/13/2023
Erin Ralovo
Traffic Review Corrections 09/01/2023 08/30/2023
Erin Ralovo
Corrective Action Required
08/30/2023

Please move the R3-7 at the beginning of the taper for the new right turn lane. It should be located just south of the new entrance for the right turn only lane at Chipman.
Engineering Review No Comments 09/01/2023 08/30/2023
Sue Pyles, P.E.
Engineering Review Corrections 07/21/2023 07/21/2023
Sue Pyles, P.E.
Corrective Action Required
07/21/2023

Please revise the Water & Sewer contact phone number on the cover sheet to 816-969-1900.
Corrective Action Required
07/21/2023

Please include elevation information in order to construct correctly.
Corrective Action Required
07/21/2023

Please provide a specific detail for each ADA-accessible ramp which includes, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual.
Corrective Action Required
07/21/2023

Please relocate the added curb inlet out of the radius.
Traffic Review Corrections 07/21/2023 07/20/2023
Susan Barry, P.E.
Corrective Action Required
07/17/2023

Add two R3-7 Right Lane Must Turn Right signs on SB Ward. First sign opposite first set of arrows (near STOP bar) and second sign just before the start of the taper. Also add ONLY pavement markings in between the Right Arrows.
Corrective Action Required
07/17/2023

Add Crosswalk on Ward, including ADA ramp on NW corner. Add push buttons and ped heads and make necessary changes to traffic signal.
Corrective Action Required
07/17/2023

Do not mark any straight arrows. Most shown are informational but there is one that is called out as a new arrow.
Informational
07/17/2023

Sidewalk will be required on Chipman Road for FDP.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home