Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
10/30/2023
|
10/24/2023
|
|
Sue Pyles, P.E.
|
|
|
Fire Review
|
Approved with Conditions
|
10/30/2023
|
10/23/2023
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Meet applicable construction site requirements of the code.
|
|
|
Traffic Review
|
Approved with Conditions
|
10/30/2023
|
10/23/2023
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
An agreement between the applicant and the City of Lee's Summit for the repair and maintenance of public roadways shall be executed prior to approval of the Special Use Permit.
|
|
|
Planning Review
|
No Comments
|
10/30/2023
|
10/23/2023
|
|
Mike Weisenborn
|
|
|
Planning Review
|
Corrections
|
09/01/2023
|
09/04/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a completed ownership affidavit form with signatures.
|
|
Corrective Action Required
Please provide additional information on your proposed routing of truck traffic. In your narrative you have stated that no truck traffic will go north on NW Pryor Rd but since your upcoming project is located on NW Colbern Rd this seems like an unlikely scenario.
|
|
Corrective Action Required
Please provide a site plan. The site plan needs to show the boundaries of the site and the general layout. A legal description will also need to be included on the site plan.
|
|
|
Engineering Review
|
No Comments
|
08/22/2023
|
08/21/2023
|
|
Sue Pyles, P.E.
|
|
|
Traffic Review
|
Approved with Conditions
|
08/22/2023
|
08/16/2023
|
|
Erin Ralovo
|
|
Corrective Action Required
Once the roadway has been restored by the Mine, a maintenance agreement for the roadway will need to be in place before final approval of the SUP.
|
|
|
Fire Review
|
Approved with Conditions
|
08/22/2023
|
08/15/2023
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Meet applicable construction site requirements of the code.
|
|
Hydrants
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
600 feet for utility buildings.
8/15/2023- There will be no buildings.
|
|
|
Planning Review
|
Corrections
|
07/21/2023
|
07/24/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a completed ownership affidavit form with signatures.
|
|
Corrective Action Required
Please provide a comprehensive narrative description of the use, both as to the function and operation, and as to structures, installations, equipment or surface improvements, changes or other requirements incidental to the use sought.
|
|
Corrective Action Required
Please provide a site plan and elevation drawings of the proposed special use in sufficient detail to determine compliance with the zoning district regulations.
|
|
|
Engineering Review
|
No Comments
|
07/21/2023
|
07/21/2023
|
|
Sue Pyles, P.E.
|
|
|
Traffic Review
|
Corrections
|
07/21/2023
|
07/20/2023
|
|
Susan Barry, P.E.
|
|
Corrective Action Required
We will need something in the SUP for maintenance of Quarry Park Rd for damage caused by the increase of truck traffic. Also of concern is Pryor Road north of Quarry Park since concrete trucks will be going that way to access the Colbern Road project. FYI, most of that roadway is within KCMO.
|
|
|
Fire Review
|
Corrections
|
07/21/2023
|
07/20/2023
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Will this be permanent, or temporary during Colbern Road construction? Are there structures besides the plant?
|
|
Hydrants
Corrective Action Required
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
600 feet for utility buildings.
|
|
|