Planning Application Status

PL2023163




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023163
Wilshire Hills Phase III
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/22/2023
JEFFREY E SMITH INV CO LC
Locations
Contacts
JEFFREY E SMITH INV CO LC, Address:PO BOX 7688  
Sarah Thompson, Phone:(573) 449-2646 Ext:244  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 12/04/2024 12/04/2024
Hector Soto Jr.
Engineering Review Corrections 10/22/2024 10/17/2024
Gene Williams, P.E.
Corrective Action Required
10/17/2024

Need to know context of this detail. Is this a public crosswalk detail? Where is it located on the plan view(s)? Is it a private detail within the parking lot? Need answered before corrections can be recommended.
Corrective Action Required
10/17/2024

If this is a public crosswalk across the commercial entrances, it does not meet the standards for a City detail for a crosswalk. Striping is not allowed unless approved by the City Traffic Engineer. Finally, crosswalk slope shall be designed with no more than 1.50% cross-slope, with an allowance up to 2.00% for the as-built condition. Corrections required.
Corrective Action Required
10/17/2024

If this is a private detail, all other conditions in the 2nd comment above stand, except for the striping. Corrections required.
Corrective Action Required
10/17/2024

In either case, the location of this detail shall be shown on the plan view(s), along with sufficient notation on the plan view referencing this detail. Correction required.
Planning Review Approved with Conditions 07/23/2024 07/22/2024
Hector Soto Jr.
Corrective Action Required
07/22/2024

SIGN PERMIT. For your information, construction of the monument sign depicted on Sheet AS-101 is reviewed and approved under separate cover as part of a sign permit application and not done as part of the subject final development plan application. Having said, it does appear to comply with all applicable sign regulations as drawn. Additional information will be required regarding the proposed illumination of the sign at the time of sign permit review.
Engineering Review Approved with Conditions 05/09/2024 05/09/2024
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
05/09/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup and sanitary sewer fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $196,478.37
DE Contact Field Eng. Inspector
Corrective Action Required
05/09/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a project coordination meeting with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
05/09/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review Corrections 05/09/2024 05/07/2024
Hector Soto Jr.
Corrective Action Required
05/07/2024

ARCHITECTURE. Color building elevations are required to be submitted as part of the final development plan application for review. The building elevations (Sheets A-200 and A-201) are black and white, and also do not label any of the proposed material colors.
Corrective Action Required
05/07/2024

TRASH ENCLOSURE. Please confirm that the proposed trash enclosure gates shown on the detail (Sheet AS-101) are solid metal panels. It isn't very clear if the "MTL GATE" note on Detail A5 refers to the panels or the gate frame.
Corrective Action Required
05/07/2024

SIGN PERMIT. For your information, construction of the monument sign depicted on Sheet AS-101 is reviewed and approved under separate cover as part of a sign permit application and not done as part of the subject final development plan application. Having said, it does appear to comply with all applicable sign regulations as drawn. Additional information will be required regarding the proposed illumination of the sign at the time of sign permit review.
Fire Review Approved with Conditions 04/26/2024 04/25/2024
Jim Eden
Miscellaneous Correction
Resolved
04/25/2024

Provide the correct address for the project.
Code Statement
Informational
04/26/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Water Supply
Informational
04/26/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Work with Water Uilities to determine there is adequate fire flow per IFC Table b105.1(2) with a 50% reduction allowed for a sprinkler system.
Miscellaneous Correction
Informational
04/26/2024

Fire Department Access- Prior to any combustible construction, Wilshire Drive shall be completed through to Strother Road, all public and private hydrants shall be in place and operable , and the apartment parking lot's asphalt base shall be in place.
FDC
Resolved
04/25/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. It is assumed the FDC will be located the same as Wilshire II, but it needs to be shown on the plans.
Engineering Review Approved with Conditions 04/26/2024 04/25/2024
Gene Williams, P.E.
Corrective Action Required
04/25/2024

An Engineer's Estimate of Probable Construction Costs is required to determine the fees. Please provide an itemized and sealed estimate for all sitework (i.e., not the building or lighting).
Planning Review Corrections 04/26/2024 04/22/2024
Hector Soto Jr.
Corrective Action Required
04/22/2024

PLATTING. No building permit shall be issued until such time as the subject property is platted. This previously made comment has been acknowledged by the applicant and is being kept for informational purposes.
Corrective Action Required
04/22/2024

RETAINING WALLS. The plans show a proposed retaining wall that crosses a proposed general utility easement along the south property line. The City's encroachment policy does not allow retaining walls to cross or encroach into a public easement. The plans also show an existing retaining wall that crosses a proposed general utility easement along the north property line. The previous two resubmittal responses to the previously made comment above states that the U/Es along the north and south property lines have been removed. However, the revised plans continue to show 7.5' U/Es in both locations. See Sheets C2.01 and C3.01, where said 7.5' U/Es are shown and labeled as such. Also see Sheets C8.01, C8.03 and L1.03 showing the linework to denote the 7.5' U/Es though they are not labeled. Revise.
Corrective Action Required
04/22/2024

PHOTOMETRIC PLAN. No photometric plan is provided for review. Submit a photometric plan in accordance with UDO Section 8.230. All proposed exterior lighting shall comply with the requirements of UDO Sections 8.220, 8.250, 8.260, 8.270 and 8.280. Provide cut sheets for all exterior light fixtures for review to confirm compliance with the lighting requirements previously cited. The previous two resubmittal responses to the previously made comment above refer to the architectural plan submittal for the required information. No architectural plans have been submitted to date for this project. The resubmittal response letter states that architectural plans were resubmitted to the City on March 6, 2024. No such plans were ever received by the City. Civil plan sets were submitted to the City on 11/20/23 (original submittal), 2/27/24 (1st resubmittal) and 4/19/24 (2nd resubmittal), but no architectural plan set has ever been received by the City.
Corrective Action Required
04/22/2024

ARCHITECTURE. Color building elevations are required to be submitted as part of the final development plan application for review. No building elevations were provided as part of the original application submittal or the plan re-submittal. The previous two resubmittal responses to the previously made comment above refer to the architectural plan submittal for the required information. No architectural plans have been submitted to date for this project. The resubmittal response letter states that architectural plans were resubmitted to the City on March 6, 2024. No such plans were ever received by the City. Civil plan sets were submitted to the City on 11/20/23 (original submittal), 2/27/24 (1st resubmittal) and 4/19/24 (2nd resubmittal), but no architectural plan set has ever been received by the City.
Corrective Action Required
04/22/2024

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosure. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. The previous two resubmittal responses to the previously made comment above refer to the architectural plan submittal for the required information. No architectural plans have been submitted to date for this project. The resubmittal response letter states that architectural plans were resubmitted to the City on March 6, 2024. No such plans were ever received by the City. Civil plan sets were submitted to the City on 11/20/23 (original submittal), 2/27/24 (1st resubmittal) and 4/19/24 (2nd resubmittal), but no architectural plan set has ever been received by the City.
Corrective Action Required
04/22/2024

SCALE. The listed scale for Sheets L1.02 and L1.03 is incorrect. The sheets are actually drawn to 10' scale, not the listed 20' scale. Revise.
Building Codes Review No Comments 04/26/2024 04/19/2024
Joe Frogge
Miscellaneous Correction
Resolved
04/19/2024

Specify sizes of water meters. If larger than 2" provide complete custom pit construction details. (we only provide pits for 2" and smaller) 3/4/2024 - Provide complete construction detail for meter pit. Detail shown is for maximum 2" meter. Also, the piping from main to meter and an addition 10' towards building is required to be copper.
Engineering Review Corrections 03/05/2024 03/05/2024
Gene Williams, P.E.
Corrective Action Required
03/05/2024

Standard detail for a 3 inch meter vault was missing from the plans (i.e., WAT-13). A standard detail was included for water meters 2 inch and smaller, but you have called-out a 3 inch meter. Please include the standard detail for the 3 inch meter (WAT-13), and revise the notes as appropriate.
Corrective Action Required
03/05/2024

Tapping sleeves are called-out for both the fire line and the domestic service line. This is not allowed. A cut-in tee is required. Please revise.
Corrective Action Required
03/05/2024

In accordance with the Design and Construction Manual, 3 inch service lines are not allowed. Please revise. A 4 inch service line is allowed. It may be DIP or PVC.
Corrective Action Required
03/05/2024

The response to comments states the irrigation meter has been moved to the inside of the building. This is not allowed in Lee's Summit. Water meters shall be installed outside the building. Please revise.
Building Codes Review Corrections 03/05/2024 03/04/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
02/27/2024

Specify sizes of water meters. If larger than 2" provide complete custom pit construction details. (we only provide pits for 2" and smaller) 3/4/2024 - Provide complete construction detail for meter pit. Detail shown is for maximum 2" meter. Also, the piping from main to meter and an addition 10' towards building is required to be copper.
Planning Review Corrections 03/05/2024 03/04/2024
Hector Soto Jr.
Corrective Action Required
03/04/2024

PLATTING. No building permit shall be issued until such time as the subject property is platted. This previously made comment has been acknowledged by the applicant and is being kept for informational purposes.
Corrective Action Required
03/04/2024

RETAINING WALLS. The plans show a proposed retaining wall that crosses a proposed general utility easement along the south property line. The City's encroachment policy does not allow retaining walls to cross or encroach into a public easement. The plans also show an existing retaining wall that crosses a proposed general utility easement along the north property line. The response from the previously made comment above states that the U/Es along the north and south property lines have been removed. However, the revised plans continue to show 7.5' U/Es in both locations.
Corrective Action Required
03/04/2024

PHOTOMETRIC PLAN. No photometric plan is provided for review. Submit a photometric plan in accordance with UDO Section 8.230. All proposed exterior lighting shall comply with the requirements of UDO Sections 8.220, 8.250, 8.260, 8.270 and 8.280. Provide cut sheets for all exterior light fixtures for review to confirm compliance with the lighting requirements previously cited. The response to the previously made comment above is to see the architectural plan submittal. No architectural plans have been submitted to date for this project.
Corrective Action Required
03/04/2024

ARCHITECTURE. Color building elevations are required to be submitted as part of the final development plan application for review. No building elevations were provided as part of the original application submittal or the plan re-submittal.
Corrective Action Required
03/04/2024

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosure. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. The response to the previously made comment above is to see the architectural plan submittal. No architectural plans have been submitted to date for this project.
Traffic Review No Comments 03/05/2024 02/29/2024
Erin Ralovo
Fire Review Corrections 03/05/2024 02/28/2024
Jim Eden
Miscellaneous Correction
Corrective Action Required
04/25/2024

Provide the correct address for the project.
Code Statement
Corrective Action Required
04/25/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Water Supply
Corrective Action Required
02/27/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Work with Water Uilities to determine there is adequate fire flow per IFC Table b105.1(2) with a 50% reduction allowed for a sprinkler system.
Miscellaneous Correction
Corrective Action Required
04/25/2024

Fire Department Access- Prior to any combustible construction, Wilshire Drive shall be completed through to Strother Road, all public and private hydrants shall be in place and operable , and the apartment parking lot's asphalt base shall be in place.
FDC
Corrective Action Required
04/25/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. It is assumed the FDC will be located the same as Wilshire II, but it needs to be shown on the plans.
Engineering Review Corrections 12/15/2023 12/15/2023
Gene Williams, P.E.
Corrective Action Required
12/15/2023

North commercial entrance crosses the extended property line to the north, which is not allowed without a shared access easement. Please terminate the point of curvature prior to the extended property line to the north in a similar fashion to what is shown on the southern commercial entrance. Please revise the plan as appropriate.
Corrective Action Required
12/15/2023

Profile Views of All Storm Lines: Please identify each line as private by labeling each profile with the word "PRIVATE" on the profile view. This is used by our GIS group to identify public versus private improvements.
Corrective Action Required
12/15/2023

Hydraulic grade lines for the design storm shall be shown on all pipes greater than 15 inches diameter. If the pipe cannot manage the 100 year event without surcharging, a suitable overflow route shall be established with the resultant 100 year HGL being a minimum of 2.0 feet below the lowest building opening. Please revise as appropriate.
Corrective Action Required
12/15/2023

Sheet C6.01: In the southeast corner, it appears there is an easement dedicated for the private storm line. Please refer to previous comments related to the public street and storm line plans, as this line shall be considered private, not public. Please ensure this is carried-through on the plat.
Corrective Action Required
12/15/2023

Sheet C6.01: The water line domestic and irrigation service is not correct. The following issues were present in the proposed plans: 1) a separate tap is needed to the public main for each water meter, 2) no valves are required on domestic water services unless the meter is greater than 2 inches, please eliminate from drawing (valves are internal to the meters 2 inches and less, hence no need to provide another valve), 3) sizing of the meter was not shown, 4) materials were incorrect for the domestic water line, as it is required to be copper from the main to the meter, and copper from the meter to the building a minimum of 10 feet, 5) domestic service line material past the 10 foot point shall comply with the building code, 6) water meters should be shown within an easement, and 7) backflow vault for domestic service shall be installed within the buiilding, not outside. Please see WAT-11 or WAT-13 for questions related to the domestic water connections. Please revise.
Corrective Action Required
12/15/2023

Sheet C6.01: If irrigation meter is desired, it shall be noted as to size, and the backflow method shall either be contained within the building and then fed to the irrigation system, or a separate system to be coordinated with building codes outside the building. As shown, there appears to be an outside backflow for the irrigation, but this will need to be coordinated with codes. Please evaluate and review, and revise as appropriate.
Corrective Action Required
12/15/2023

Sheet C6.01: The public sanitary sewer plans appear to show the location of the private lateral. As such, please add notes such as "connect to existing lateral" or equivalent language. Please revise.
Corrective Action Required
12/15/2023

A SWPPP is required due to the project disturbance being greater than 1 acre. Please provide a SWPPP for this project.
Corrective Action Required
12/15/2023

How will the backflow vault be drained? The sump should be drainied to either: 1) daylight if possible, 2) a curb or field inlet, or 3) an infiltration trench. Please specify which method is used to drain the backflow vault, along with other details needed to such as the route, materials, etc. Please revise on the standard detail and the plan view at a minimum.
Corrective Action Required
12/15/2023

Landscape Plan: Trees are shown either directly on top of the public water main, or too close to the public water main. The rule is as follows: Trees shall be located no less than 5.0 feet from any public water main, as measured from the outside of the pipe, to the outside of the mature tree trunk. Please evaluate, and revise as appropriate.
Corrective Action Required
12/15/2023

A retaining wall is shown on the plan view, but there are no other details concerning this feature. Please provide a rendering of the retaining wall, along with a general overview of the retaining wall (i.e., is it a segmental retaining wall, concrete cantilevered retaining wall?), along with sufficient notes concerning the design, such as "segmental retaining wall to be designed by others, and final sealed drawings to be submitted to City of Lee's Summit, and independent inspectors to review and inspect its construction" or equivalent language. Please revise.
Corrective Action Required
12/15/2023

Swales are proposed over the existing 30 inch water main along the west side of the project. This is a very important water main for the City of Lee's Summit. Have you potholed this line? Have you checked as-builts of this line? A minimum cover of 3.5 feet is required following any grading over the pipe. Please verify there are no conflicts.
Corrective Action Required
12/15/2023

Are there any tie-backs extending within the easement on the west side of the project? If so, these are not allowed. It is considered an unallowed encroachment into a utility easement by a structure. Please verify and revise as appropriate.
Corrective Action Required
12/15/2023

Sheet C4.01: Why is the storm line along the southeast corner of the project not included in these plans? As discussed in earlier conversations, this line should be a private line, not a public line. Please review the public street and stormwater plans and ensure this is updated, and please update on these plans to ensure it is called-out as private, and please provide a profile view of this line. Please revise.
Corrective Action Required
12/15/2023

Concrete is called-out on the parking lot, but no jointing pattern was shown. Please provide a site-specific jointing pattern showing the location of any sawcuts, or any specific joints to be installed. It is assumed you are only providing sawcuts since it appears woven wire is being provided within the pavement?
Corrective Action Required
12/15/2023

Please show the slopes on the ADA-accessible offloading areas. Stalls are shown, but the offloading areas are missing.
Corrective Action Required
12/15/2023

KCMMB concrete mix is required from the right of way line to the road. Allthough recommended for the interior parking lot, it is not required. Please show KCMMB concrete mix for the driveway as specified above in the form of a note.
Corrective Action Required
12/15/2023

Sidewalk Detail: Sidewalk within right of way (i.e., public sidewalk) shall not have woven wire fabric installed. Please see City specific standard detail for sidewalk, which includes leveling course. Please revise.
Corrective Action Required
12/15/2023

ADA-accessible ramps at the two (2) commercial entrances were missing from the plans. These ramps shall be sufficiently detailed, including elevation callouts, slope callouts, width, flat spot across the driveway, etc. Please be aware the City of Lee's Summit uses a design standard of no greater than 1.5% cross-slope for ramps and sidewalks, and 7.5% running slope for ADA-accessible ramps. This will allow for some level of construction tolerance. Please provide a site-specific (i.e., not a generic) ADA-accessible ramp and ADA-accessible route plan.
Corrective Action Required
12/15/2023

It appears the City standard drawing for water service connection and meter was missing. Please include WAT-11 or WAT-13 (depends on size of meter) in the revised plans.
Corrective Action Required
12/15/2023

There appear to be several references throughout the plan set specifying 1.7% slope for ADA-accessible turning spaces, cross-slope, ADA-accessible ramps, ADA-accessible drive spaces, etc. Please revise, as the City of Lee's Summit has different design standards of 1.5%. Final construction will be allowed to exceed this slope to 2.00% maximum, but we need the plans to show 1.5% design slope. In addition, running slope of ADA-accessible ramps in the City of Lee's Summit is a maximum of 7.5%, with 8.33% being acceptable for the as-built condition. Please review tha plans, and revise as appropriate.
Corrective Action Required
12/15/2023

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. Please include all sitework in this estimate, but do not include the building, lighting, trees, bushes, fencing, or trash enclosures.
Planning Review Corrections 12/15/2023 12/15/2023
Hector Soto Jr.
Corrective Action Required
12/06/2023

ARCHITECTURE. Color building elevations are required to be submitted as part of the final development plan application for review. No building elevations were provided as part of the application submittal.
Corrective Action Required
12/13/2023

PLATTING. No building permit shall be issued until such time as the subject property is platted.
Corrective Action Required
12/13/2023

SITE DATA TABLE. Include a site data table that includes the following information: Lot Size; Building Area (building footprint sq. ft. and total sq. ft.); Floor Area Ratio; Number of Dwelling Units and Number of Beds; Impervious Coverage; Number of Parking Spaces (required # and provided #). The UDO requires parking to be provided at a rate of 1 space for every 2 beds plus 1 space per employee on maximum shift. Please provide the parking calculation used to arrive at the number of required spaces. Staff can administratively approve the provision of parking at a different rate if empirical data can be provided to support that an alternate rate can satisfy demands of the facility.
Corrective Action Required
12/13/2023

ACCESSIBLE ROUTE. A general note is included on the accessibility plan (C7.01) indicating that certain slopes will not be exceeded, but no slopes are actually labeled on the plan. Label the slopes and cross-slopes of the site's accessible routes.
Corrective Action Required
12/13/2023

OIL & GAS WELLS. Add a note to the plans regarding the presence of any active, inactive or abandoned oil and/or gas wells on the subject property. Cite the source of information used to make this determination. The Missouri Department of Natural Resources has a database of wells that can be used and cited as a resource.
Corrective Action Required
12/13/2023

RETAINING WALLS. The plans show a proposed retaining wall that crosses a proposed general utility easement along the south property line. The City's encroachment policy does not allow retaining walls to cross or encroach into a public easement. The plans also show an existing retaining wall that crosses a proposed general utility easement along the north property line. It does not appear from the utility plans that there is no public infrastructure along the north or south property line, so the proposed utility easements along said property lines do not appear to be necessary and therefore can be eliminated so as to avoid any conflict.
Corrective Action Required
12/13/2023

PHOTOMETRIC PLAN. No photometric plan is provided for review. Submit a photometric plan in accordance with UDO Section 8.230. All proposed exterior lighting shall comply with the requirements of UDO Sections 8.220, 8.250, 8.260, 8.270 and 8.280. Provide cut sheets for all exterior light fixtures for review to confirm compliance with the lighting requirements previously cited.
Corrective Action Required
12/13/2023

MECHANICAL SCREENING. Indicate on the site plan or building elevations the location of all exterior ground-mounted and roof-mounted equipment as appropriate. Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. Roof-mounted units shall be dashed-in on the building elevations to indicate their location. Please take into account the additional height from the curbs on which RTUs will be placed when providing the required parapet height for screening purposes.
Corrective Action Required
12/13/2023

LANDSCAPE PLAN. Label the size of all proposed trees and shrubs at the time of planting. Medium and large shrubs shall be a minimum 2-gallon or 5-gallon container size, respectively. Deciduous trees shall be a minimum 3" caliper at the time of planting. Evergreen trees shall be a minimum 8' in height at the time of planting.
Corrective Action Required
12/14/2023

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosure. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier.
Building Codes Review Corrections 12/15/2023 12/13/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/20/2023

Specify sizes of water meters. If larger than 2" provide complete custom pit construction details. (we only provide pits for 2" and smaller)
Traffic Review Corrections 12/15/2023 12/04/2023
Erin Ralovo
Corrective Action Required
12/04/2023

The sidewalk on the east side of the development will need to be extended past the plat all the way to the intersection of Wilshire and Meadowview to meet with the existing sidewalk.
Corrective Action Required
12/04/2023

Curb return radii at the drive connections should be 35 FT or an explaination as to why that is not possible is needed.
Fire Review Corrections 12/15/2023 12/01/2023
Jim Eden
Miscellaneous Correction
Resolved
02/28/2024

Provide the correct address for the project.
Code Statement
Resolved
02/28/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
Water Supply
Corrective Action Required
12/01/2023

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- Work with Water Uilities to determine there is adequate fire flow per IFC Table b105.1(2) with a 50% reduction allowed for a sprinkler system. 2/24/2024-Confirm construction type of either 5A or 5B. The water flow requirement for a 5A building is 2,125 GPM, and 3,125 GPM for a 5B.
Miscellaneous Correction
Resolved
02/28/2024

Fire Department Access- Prior to any combustible construction, Wilshire Drive shall be completed through to Strother Road, all public and private hydrants shall be in place and operable , and the apartment parking lot's asphalt base shall be in place.
FDC
Resolved
02/28/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. It is assumed the FDC will be located the same as Wilshire II, but it needs to be shown on the plans.
Imposed Loads
Corrective Action Required
02/28/2024

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Confirm the"standard duty" pavement on the fire access lanes will support 75,000-pounds (IFC D102).
Building Codes Review Corrections 12/15/2023 11/08/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/08/2023

Specify sizes of water meters. If larger than 2" provide complete custom pit construction details. (we only provide pits for 2" and smaller)
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,200.00 $1,200.00 Paid 03/18/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/23/2023 Application Form Application_2023163
11/20/2023 Plans Plan Set_Rev0_PL2023163
11/20/2023 Engineer Report/Study Old Unapproved Hydraulic Report_PL2023163
12/05/2023 Engineer Report/Study Hydraulic Report_Rev0_PL2023163
12/15/2023 Letter Applicant Letter_PL2023163
02/27/2024 Plans Plan Set_Rev1_PL2023163
02/27/2024 Engineer Report/Study Hydraulic Report_Rev1_PL2023163
02/27/2024 Receipt Receipt_PL2023163
03/05/2024 Letter Applicant Letter - FDP (DFDP)
03/18/2024 Receipt Receipt for transaction:2024-001648
04/19/2024 Letter Response Letter_Rev0_PL2023163
04/19/2024 Plans Plan Set_Rev2_PL2023163
04/26/2024 Letter Applicant Letter - FDP (DFDP)
04/26/2024 Email Supplement Comment Email_PL2023163
04/30/2024 Plans Plan Set_Rev3_PL2023163
05/02/2024 Letter Response Letter_Rev1_PL2023163
05/02/2024 Plans Plan Set_Rev4_PL2023163
05/02/2024 Engineers Estimate Probable Cost Estimate_PL2023163
05/09/2024 Activity Document Fee Worksheet WilshireIII FDP_PL2023163
05/10/2024 Letter Applicant Letter - FDP (DFDP)
07/16/2024 Letter Response Letter_Rev2_PL2023163
07/16/2024 Drawing Elevations/Sign/Shed_PL2023163
07/22/2024 Letter Applicant Letter_PL2024163
07/25/2024 Approved Plans Approved FDP Stamped Plan Set_PL2023163
10/01/2024 Approved Plans Approved Stamped Plan - Water Meter_PL2023163
10/15/2024 Drawing ADA Ramp Detail_PL2023163
10/22/2024 Letter Applicant Letter_PL2024163
11/18/2024 Plans Plan Set_Rev5_PL2023163
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home