Planning Application Status

PL2023145




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023145
THE VILLAGE AT DISCOVERY PARK - PUBLIC SANITARY and FORCE MAIN RELOCATION
Engineering Plan Review
Engineering Plan Review
Approved
06/07/2023
ORR STREET LOFTS LLC
Locations
Contacts
ORR STREET LOFTS LLC, Address:4240 PHILIPS FARM ROAD #109  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Nelson Willoughby, Address:Olsson Associates, Phone:(816) 361-1177  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 12/05/2023 11/29/2023
Gene Williams, P.E.
Engineering Review Corrections 11/28/2023 11/28/2023
Gene Williams, P.E.
Engineering Review Corrections 11/07/2023 11/07/2023
Gene Williams, P.E.
Corrective Action Required
11/07/2023

As requested in the previous applicant letter, further engineering work was recommended to lessen the depth issues related to the sanitary sewer. Although this was addressed on the connection point to the south of Colbern Rd., it appears no other effort was expended in lessening the impact. I found the following locations where this impact can be lessened by using a different pipe slope, adjusting flowline elevations, or a combination of both. The following are examples: 1) the segment between manhole Z2 and Z1 could be decreased significantly, 2) the segment between the existing manhole being replaced at 16-008 and manhole Z2 could be decreased slightly, recommend no less than 0.40% (0.33% is the minimum required by the Design and Construction Manual), 3) manhole A1 to existing manhole 16-010 (to be replaced) is shown with excessive slope for no apparent reason, and appears slope can be lessened significantly with an outside drop manhole, 4) manhole C1 is deep for no apparent reason. Please revise.
Corrective Action Required
11/07/2023

Sheet 660: Flowline in at Z3 has zero fall across the invert. Minimum fall across inverts at this angle is 0.20 feet. Please revise.
Corrective Action Required
11/07/2023

Sheet 656: It does not appear sufficient fall was provided across the invert at manhole 16-010. Minimum slope for this angle of entry and exit is 0.50 feet. Please revise.
Corrective Action Required
11/07/2023

Please revise the Design Criteria Modification Request (i.e., the waiver) as appropriate after making revisions. Please ensure the waiver request is submitted as one (1) pdf document which includes 1) the form, 2) the summary sheet, and 3) the exhibit.
Corrective Action Required
11/07/2023

Sheet 652: Please label each manhole on the general overview sheet. Many manhole labels were missing for existing manholes to be removed and replaced, and makes the interpretation in the field difficult for the contractor and the inspector.
Corrective Action Required
11/07/2023

Stub Locations: There are numerous references to marking the end of the line for future location. Tracer wire and box will be required as per the City of Lee's Summit standard detail. Recommend the plan view of the sanitary stubs be revised to reference the standard detail for tracer wire and other design requirements for a wye connection (i.e., SAN-1).
Engineering Review Corrections 10/13/2023 10/13/2023
Gene Williams, P.E.
Corrective Action Required
10/12/2023

Sheet C664 was shown in the previous submittal with the forcemain outside the limits of the dam. A review of Sheet C663, however, appears to show the forcemain is still within the limits of the dam. The forcemain must be outside the limits of the dam, since it will present a conduit for potential failure, as well as the possibility of a line break and subsequent dam failure. Please review and revise as appropriate, and ensure the forcemain is outside the limits of the dam.
Corrective Action Required
10/13/2023

The sanitary sewer manholes that exceed 20 feet of depth should be upgraded to 5 foot inside diameter. Many are already shown as 5 foot inner diameter manholes, with the exception of Z1, Z2, 16-008, 16-010, 16-009, and A8. Please revise plans to show 5 foot inside diameter sanitary sewer manholes for all sanitary sewer manholes greater than 20 feet in depth.
Corrective Action Required
10/13/2023

Manhole A8 is shown with excessive depth for no apparent reason. It was also not included in the waiver exhibit. Was there a reason for the excessive depth on the south side of Colbern Rd.? If not, please raise the manhole.
Corrective Action Required
10/13/2023

It does not appear sufficient effort was expended to lessen the depth of sanitary sewer lines throughout the project. Where allowed, please raise manholes to lessen the impact of deep sanitary sewers for this project. There appear to be several ways to minimize the depth issues, one of which was described in the above comment. There also appear to be methods to raise the manholes at the Douglas St. crossing by a measurable amount. Every foot will help, as these lines will be extremely difficult to maintain as shown. Please thoroughly evaluate and revise. At this time, staff will not support a waiver to the 20 foot maximum depth rule unless there has been additional effort to minimize the excessive depth issues.
Engineering Review Corrections 09/25/2023 09/25/2023
Gene Williams, P.E.
Corrective Action Required
09/26/2023

Please refer to comment #21 in the previous applicant letter. Connection at Sta. 10+09.53 is not DIP to HDPE connection. Please specify electrofusion coupling for HDPE to HDPE connection. Please revise as appropriate.
Corrective Action Required
09/26/2023

The waiver request was missing the standard template with Water Utilities listed as a reviewer. I have attached the template for your use, and this form includes the signature for Jeff Thorn, Deputy Director of Water Utilities. Please complete the form with Water Utilities listed as a reviewer. In addition, this form also lists Sue Pyles which was also missing. Please include her in the template form.
Corrective Action Required
09/26/2023

The waiver request was missing an exhibit showing in general where the waiver is being requested (i.e., a plan view with labels or other methods to show the typical depths from finish grade to flowline along selected intervals along the sanitary sewer line would suffice). Please provide an exhibit showing where the waiver is being sought.
Corrective Action Required
09/26/2023

Off-site sanitary sewer easements shall be required prior to formal approval of the plans. The City desires these easements to be exclusive to sanitary sewer, and the City has a standard template for language related to this easement. Please provide exclusive sanitary sewer easements for the project.
Engineering Review Corrections 08/04/2023 08/04/2023
Gene Williams, P.E.
Corrective Action Required
07/18/2023

Please refer to the separate pdf markup of the plans for specific comments related to the sanitary sewer and forcemain. This markup shall be transmitted separately.
Corrective Action Required
07/18/2023

A trenching and backfill detail was missing from the plans. Please ensure the new standard of 12 inches aggregate is shown over the top of pipe.
Corrective Action Required
08/04/2023

The geometry of the forcemain appears to bisect the dam for the retention basin which is not acceptable. Please select a new route which does not impact the dam during a malfunction of the forcemain or future maintenance of the forcemain.
Corrective Action Required
08/04/2023

A separate meeting via Zoom will be setup soon to discuss the water main and the Colbern Rd. CIP project. We would recommend these plans be added to the agenda for discussion due to the amount of comments related to the sanitary sewer plans.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
06/30/2023 Plans 23-06-30_Zone 1 Public Sanitary Sewer Plans
08/04/2023 Letter DE-Comment Letter (Engineering Plans)
08/04/2023 Email COMMENTS WITH PDF MARKUP
09/10/2023 Waiver/Modification Document 23-09-08_DCM Waiver Request
09/10/2023 Letter 23-09-08_GNCV_Comment Response Letter_City
09/10/2023 Plans Zone 1 Public Sanitary Sewer Plans
09/26/2023 Letter DE-Comment Letter (Engineering Plans)
09/29/2023 Waiver/Modification Document 23-09-28 Discovery Park Sanitary Sewer Waiver Exhibit
09/29/2023 Letter 23-09-28_GNCV_Comment Response Letter_City
09/29/2023 Plans 23-09-28_Zone 1 Public Sanitary Sewer Plans
09/29/2023 Waiver/Modification Document DCM Design Criteria Modification Request
10/13/2023 Letter DE-Comment Letter (Engineering Plans)
10/24/2023 Waiver/Modification Document 23-10-16 Discovery Park Sanitary Sewer Waiver Exhibit
10/24/2023 Letter 23-10-16_GNCV_Comment Response Letter_City
10/24/2023 Plans 23-10-16_Zone 1 Public Sanitary Sewer Plans
11/01/2023 Engineers Estimate 2023-10-31_Public Sanitary Cost Estimate
11/07/2023 Letter DE-Comment Letter (Engineering Plans)
11/07/2023 Email EMAIL OF COMMENTS AND SUPPLEMENTAL
11/09/2023 EMAIL PRELIMINARY REVIEW
11/10/2023 Waiver/Modification Document 23-11-10_DCM Design Criteria Modification Request
11/10/2023 Letter 23-11-10_GNCV_Comment Response Letter_City
11/10/2023 Engineers Estimate 23-11-10_Public Sanitary Cost Estimate
11/10/2023 Plans 23-11-10_Zone 1 Public Sanitary Sewer Plans
11/21/2023 Letter 23-11-10_DCM Design Criteria Modification Request
11/21/2023 Plans 23-11-21_Zone 1 Public Sanitary Sewer Plans
11/28/2023 Email EMAIL COMMENTS NOV2023
11/28/2023 Letter 23-11-28_DCM Design Criteria Modification Request
11/28/2023 Letter 23-11-28_GNCV_Comment Response Letter_City
11/28/2023 Plans 23-11-28_Zone 1 Public Sanitary Sewer Plans
11/29/2023 Letter SIGNED WAIVER SEWER DEPTH
11/29/2023 Email MDNR CONCURR SIGNED
11/29/2023 Approved Plans STAMPED APPROVED CONSTRUCTION PLANS
12/05/2023 Recorded Document SanitaryEasementsandDrainageEasement
01/03/2024 3rd Party Permit/Approval MDNR Sanitary permit The Village at Discovery Park
01/05/2024 Activity Document FeeWorksheetVillageDiscParkSanitaryForcemain_20231445
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home