Planning Application Status

PL2022414




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022414
Residences at Blackwell - Street and Stormwater
Engineering Plan Review
Engineering Plan Review
Approved
11/29/2022
RESIDENCES AT BLACKWELL LLC
Locations
Contacts
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
RESIDENCES AT BLACKWELL LLC, Address:21 SE 29TH TER  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 02/02/2024 02/02/2024
Gene Williams, P.E.
Traffic Review No Comments 02/08/2024 01/25/2024
Mike Weisenborn
Engineering Review Corrections 12/22/2023 12/12/2023
Gene Williams, P.E.
Engineering Review No Comments 11/10/2023 11/08/2023
Gene Williams, P.E.
Engineering Review Approved with Conditions 04/17/2023 04/13/2023
Gene Williams, P.E.
Traffic Review No Comments 04/17/2023 04/11/2023
Brad Cooley, P.E., RSPI
Engineering Review Corrections 02/07/2023 02/07/2023
Gene Williams, P.E.
Corrective Action Required
02/07/2023

Please refer to comment #3 in the previous applicant letter. Although slope callouts were provided, there are several instances on Sheet 12 and 13 where the running slope exceeds the City of Lee's Summit design standards of 7.5% maximum design running slope. Please provide a re-design which utilizes the 7.5% maximum running slope standard. This standard is used to allow for construction tolerance. Please evaluate and revise.
Traffic Review No Comments 02/07/2023 01/30/2023
Brad Cooley, P.E., RSPI
Engineering Review Corrections 12/16/2022 12/16/2022
Gene Williams, P.E.
Corrective Action Required
12/16/2022

Plans include a Master Drainage Plan which is not required for this project. Although an overall mass grading and drainage plan is required, the Master Drainage Plan is defined in a different context. Suggest changing the title of the sheet and index on the cover sheet to "overall drainage plan" or equivalent language.
Corrective Action Required
12/16/2022

A SWPPP is required due to the size being larger than 1 acre.
Corrective Action Required
12/16/2022

ADA-accessible ramp details: Please include slope callouts for 1) running slope at ramps, 2) cross-slope of sidewalk and ramps, and 3) cross-slope, and diagonal slope at all turning spaces within ADA-accessible ramps. The latter includes all turning spaces at the Type B curb ramps, where the area between the ramps must be flat (i.e., no more than 1.50% design slope in any direction, including the diagonal direction). Please revise.
Corrective Action Required
12/16/2022

Sheet 12 and 13: A total of 4 of the curb ramps show truncated domes that are greater than 5 feet to the back of curb. A maximum of 5.0 feet to the back of curb is required, so the truncated domes will either need to be skewed, or a different design shown. Please evaluate and revise as appropriate.
Corrective Action Required
12/16/2022

Riley St., Wildflower Ln., Wildflower Ct., and Riley Ln. enter Heritage St. in a stop-controlled situation. ADA-accessible routes with a minimum of 5.0 feet across the entire route shall be established at these stop-controlled intersections with a design cross-slope no greater than 1.50%. Please show this on the ADA-accessible ramp design sheets.
Corrective Action Required
12/16/2022

The hydraulic grade line shall be shown on the profile view for all storm lines greater than 6 inches diameter. The design storm shall also be included on the hydraulic grade line callout. If the 100 year event cannot be contained within the pipe without surcharging as defined in the Design and Construction Manual, a suitable overflow route shall be established. Please evaluate and revise as appropriate.
Corrective Action Required
12/16/2022

In regard to above comment, if the 10 year event can be contained at or below the crown of the pipe, it is typical the 100 year event will still be within the pipe without surcharging. Recommend evaluating this approach to eliminate flooding concerns.
Corrective Action Required
12/16/2022

All cross-pipes beneath Collector roads (i.e., Heritage St.) shall either be RCP or CPP as specified in the Design and Construction Manual. Please revise as appropriate, since HDPE is not allowed beneath Collector streets.
Corrective Action Required
12/16/2022

A trenching and backfill detail for the storm lines appeared to be missing. Please provide a trenching and backfill detail with the updated 12 inch aggregate over the top of pipe which was adopted in July 2020. Please update.
Corrective Action Required
12/16/2022

Please see Traffiic comments related to the temporary turnaround on Heritage St. If you desire to end the street at Riley St. rather than completing Heritage St. to the east of Riley Place, recommend a meeting be set up with Development Services concerning the effects to the platting process, and other effects to storm design, etc. It is recommended a temporary cul-de-sac be constructed at the end of Heritage St. east of Riley Place which may take the form of a bulb extended to the north rather than a symmetrical cul-de-sac.
Traffic Review Corrections 12/16/2022 12/16/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
12/15/2022

Sheet 3: Heritage St. - Minimum horizontal curve for a Residential Collector is 335’.
Corrective Action Required
12/15/2022

Sheet 22: Street name signs need to be a mix of upper- and lower-case letters (first letter capitalized) with directional suffix.
Corrective Action Required
12/16/2022

Sheet 21: Stop signs and street name signs on the side streets along Heritage do not have to be installed with this phase. If installed this phase, they should be covered.
Corrective Action Required
12/16/2022

Sheet 21: Add additional "No Parking" signs, one at each end of the stretch being designated. Add additional if needed around curve with double arrow.
Corrective Action Required
12/16/2022

Sheet 21/22: The end of road object markers should be the solid red diamond (no reflective buttons - OM4-3), spaced 6' OC, and 4' from the ground to the bottom of the diamond.
Corrective Action Required
12/16/2022

General: Constructing Heritage St. in its entirety with this phase creates a long deadend street. Without any side streets, this street will need a temporary turn around at the end. Alternatively, the street could be constructed to the northmost entrance/Riley St. with this phase and be extended with future phases.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/29/2022 Application Form Application and Affidavit_Rev 0_PL2022413
11/30/2022 Plans 22-102 SS - REV0 - 2022_11_30
11/30/2022 Engineer Report/Study 22-102 Final Stormwater Management Plan
12/16/2022 Letter DE-Comment Letter (Engineering Plans)
01/24/2023 Plans 22-102 PUBLIC STREET AND STORM SEWER - REV1 - 2023_01_23
01/24/2023 Letter Response to Comments - Engineering Plans - Street and Storm dated 12-16-2022
01/24/2023 Engineer Report/Study 22-102 Final Stormwater Management Plan
02/07/2023 Letter DE-Comment Letter (Engineering Plans)
04/03/2023 Engineers Estimate 22-102 - COST EST - 2023_01_23
04/03/2023 Plans PUBLIC STREET STORM APPROVABLE
04/03/2023 Engineer Report/Study 22-102 - swp2
04/03/2023 Engineer Report/Study 02225094 Lee's Summit Mixed Use Geotech Report_signed
04/03/2023 Letter Response to Comments - Engineering Plans - Street and Storm dated 2-7-2023
04/13/2023 Email STKY APPROVAL APR2023
04/13/2023 Approved Plans defunctSTAMPED APPROVABLE PLANS
11/03/2023 Engineers Estimate 22-102 cost estimate 2023_11_03 - Public Street
11/08/2023 Activity Document DefunctFeeWorksheetResidencesBlackwellStreetStorm
11/30/2023 Engineers Estimate 22-102 - RESIDENCES AT BLACKWELL - STREET & STORM - EOPC - 2023_11_29
11/30/2023 Plans 22-102 - RESIDENCES AT BLACKWELL - PUBLIC STREET AND STORM - REV3 - 2023_11_29
12/12/2023 Email EMAIL COMMENTS REDESIGN
01/24/2024 Letter Response to Comments - Engineering Plans - Street and Storm dated 12-12-2023
01/24/2024 Photograph 22-102 - RESIDENCES AT BLACKWELL - PUBLIC STREET AND STORM - REV4 - 2024_01_17
02/02/2024 Activity Document FeeWorksheetResidencesBlackwellStreetStorm
02/02/2024 Approved Plans STAMPED PLANS - STREET AND STORM
02/02/2024 Email EMAIL APPROVAL CONDITIONS
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home