PL2021454
Pergola Park 5th Plat - Streets, Storm, Mass Grading
Engineering Plan Review
Engineering Plan Review
Approved
11/18/2021
NLV PERGOLA PARK LLC
Locations
Contacts
RUSSELL PEARSON, Address:3152 GRANDSTAND CIR, Phone:(913) 735-9861  
DAVID RINNE, Address:SCHLAGEL ASSOCIATES  
Scott Ready, Phone: 8169691225  
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
As-graded MDP Review No Comments 06/16/2023 06/16/2023
Sue Pyles, P.E.
Record Drawings Review No Comments 06/16/2023 06/16/2023
Sue Pyles, P.E.
As-graded MDP Review Corrections 06/07/2023 06/08/2023
Sue Pyles, P.E.
Record Drawings Review Corrections 06/07/2023 06/08/2023
Sue Pyles, P.E.
Engineering Review Approved with Conditions 04/15/2022 04/26/2022
Sue Pyles, P.E.
Traffic Review Approved with Conditions 04/15/2022 04/13/2022
Scott Ready
Engineering Review Corrections 03/08/2022 03/09/2022
Sue Pyles, P.E.
Corrective Action Required
03/09/2022

Comments on the Engineer's Estimate will be sent in the next few days under separate cover.
Corrective Action Required
03/09/2022

Include a street sign plan.
Corrective Action Required
03/09/2022

Please relocate overlapping text on Sheet 12 at Sta. 10+50.00 and Sheet 13 near Sta. 0+00 in Profile views for clarity.
Corrective Action Required
03/09/2022

Why are all of the storm sewer street crossings using flowable fill? While allowed, it is rarely used for new construction like this due to costs.
Corrective Action Required
03/09/2022

There are several different pavement sections on this project. Each section (e.g., 26’ B-B, 28’ B-B, divided), and each will require a typical pavement section. I’ll forward an example. This example is just for information, to help explain what is required.
Traffic Review Approved with Conditions 03/08/2022 03/07/2022
Brad Cooley, P.E., RSPI
Informational
03/07/2022

All of the islands within City R/W will require a license agreement to address maintenance responsibility.
Engineering Review Corrections 12/06/2021 12/07/2021
Sue Pyles, P.E.
Corrective Action Required
12/07/2021

Please note that since the roundabout and intersection designs (Sheets 17-19) are not being provided until the second submittal, it will be a 10-day review.
Corrective Action Required
12/07/2021

As discussed, please revise the turnaround location to be within the plat boundary in conjunction with the associated storm sewer comments, below.
Corrective Action Required
12/07/2021

Submit the following: • Engineer's Estimate of Probable Construction Costs. • SWPPP. • Copy of the MDNR Land Disturbance Permit.
Corrective Action Required
12/07/2021

Sheet 1: • KCP&L is now Evergy. Please revise the Utility contacts list accordingly. • Dena Mezger is no longer the Public Works Director. No contact name is necessary, but Michael Park is now the PW Director. • Please replace General Note 14 with the following: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • Remove the approval signature block for the City. A stamp will be provided electronically when approved. • “Asphalt Pavement – Existing” is shown twice in the Legend. Please delete the duplicate.
Corrective Action Required
12/07/2021

Sheet 2: • Please remove “(By Others)” from the proposed water and sanitary sewer labels on this sheet and throughout the plan set. They will be constructed with this project. • The use of text masking (if that is the correct terminology) throughout the plan set at times covers up important information and/or drawings. Please review this and all sheets for clarity.
Corrective Action Required
12/07/2021

Sheets 3-4: • Please remove the utility callouts on the MDP, the line types suffice. • Include a table showing allowable house type for each lot.
Corrective Action Required
12/07/2021

Sheets 8-12: See comments sent for PL2021455, Pergola Park 5th Plat ESC. Revise plans to match the ESC plan revisions.
Corrective Action Required
12/07/2021

Sheets 13-16: • Please denote sidewalk to be constructed by the contractor/developer the same on every page. • Show the sidewalk adjacent to Tract Q as being constructed by the contractor/developer. • Show the sidewalk adjacent to all of Tract S as being constructed by the contractor/developer. • Please note that the areas shown as future Pergola Park 6th Plat and Lumberman’s Row 1st Plat are currently unplatted and therefore require sidewalk constructed as a part of this development. In lieu of constructing the sidewalk, please note that a cash escrow for this work will be required. • Please show underdrain in Profile views at all low points.
Corrective Action Required
12/07/2021

Sheet 20: Sheets 3-4: • Please revise the angle thru Structure 802 to be 90 degrees or greater. • Please eliminate the stub for future connection at Structure 803. Future connections shall be core drilled. • The 20’ U/Es shown between Lots 1 & 2 is drawn as a 15’ width easement, but labeled both as a 15’ D/E and a 20’ U/E. Please clarify. • Why is the end section at Structure 800 shown both angled and straight? Please clarify. Future Structure 1600 is shown the same way.
Corrective Action Required
12/07/2021

Sheet 21: • Please shown the design HGL in the Profile views. • Please show all utility crossings in the Profile views. • Structure 501 does not meet the requirement of a minimum 0.5’ drop through the structure. Please revise. • Please note that only storm sewer included in the 5th Plat has been reviewed at this time.
Corrective Action Required
12/07/2021

Sheet 24: Please include standard pavement sections for all different pavement configurations. The sidewalk note (1 side only) included is incorrect.
Corrective Action Required
12/07/2021

Sheets 25 & 26: Field Inlet (STM-2) and Junction Box (STM-3) are not used, please remove.
Traffic Review Corrections 12/03/2021 12/01/2021
Brad Cooley, P.E., RSPI
Corrective Action Required
12/01/2021

All of the islands within City R/W will require a license agreement to address maintenance responsibility.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/18/2021 Engineer Report/Study 18_08_08_Stormwater Management Study
11/18/2021 Plans 20-189 SS (REV0)
12/07/2021 Letter DE-Comment Letter (Engineering Plans)
02/18/2022 Meeting Summary Response to Comments dated 12-7-21 for Pergola Park 5th Plat - Street, Storm & Mass Grading
02/18/2022 Plans 20-189 SS (REV1)
02/18/2022 Engineers Estimate 20-189-Engineers Cost Estimate
03/09/2022 Letter DE-Comment Letter (Engineering Plans)
04/04/2022 Plans 20-189 SS (REV2)
04/04/2022 Engineers Estimate 20-189-Engineers Cost Estimate
04/13/2022 Engineer Report/Study SWPPP
04/13/2022 Letter RENEWED MDNR PERMIT 2022
04/26/2022 Email PL2021-454 Pergola Park 5th Plat Street & Storm Pending Items
05/02/2022 Activity Document Fees PL2021454 Pergola Park 5th Street Storm
08/17/2022 Approved Plans Pergola Park, 5th Plat Street, Storm, MDP and ESC Approved 8.17.22
08/17/2022 Letter DE-Engineering Plans Approval Letter
05/23/2023 Plans 20-189 SS (AS-BUILTS)
06/01/2023 Plans 20-189 MDP (AS-BUILTS)
06/08/2023 Email PL2021454 Pergola Park 5th As-Graded MDP Review Comments
06/08/2023 Email PL2021454 Pergola Park 5th Street_Storm Record Drawing Review Comments
06/09/2023 Plans 20-189 SS (AS-BUILTS)
06/09/2023 Plans 20-189 MDP (AS-BUILTS)
06/15/2023 Accepted MDP Pergola Park 5th AsGraded MDP Accepted 06 16 23
06/15/2023 Accepted Record Drawings Pergola Park 5th Street Storm AsBuilts Accepted RD
06/30/2023 Engineers Estimate 20-189-REMAINING Engineers Cost Estimate (6-30-23)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home