Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Corrections
|
03/12/2025
|
03/12/2025
|
|
Ian Trefren
|
|
Corrective Action Required
[CCR] - Please include a cover letter that denotes or otherwise highlights the language within the CCR that is required by Sec. 4.290 (A thru N)
|
|
|
Engineering Review
|
Corrections
|
11/26/2024
|
11/26/2024
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Missing stream buffer easement on Sheet 2 of 2. Show stream buffer easement on Sheet 2 of 2. Correction required.
|
|
|
Traffic Review
|
Corrections
|
11/26/2024
|
11/25/2024
|
|
Erin Ralovo
|
|
Corrective Action Required
Sidewalks should extend on both sides of Baliey Farms Parkway all the way to Cape Drive.
|
|
|
Fire Review
|
No Comments
|
11/26/2024
|
11/25/2024
|
|
Jim Eden
|
|
|
GIS Review
|
No Comments
|
11/26/2024
|
11/21/2024
|
|
Kathy Kraemer
|
|
|
Planning Review
|
Approved with Conditions
|
11/26/2024
|
11/21/2024
|
|
Ian Trefren
|
|
Corrective Action Required
Address and lot numbers overlap for Lots 57 and 58. Please correct before mylars
|
|
Corrective Action Required
Replace "Joshua Johnson, AICP" with "Aimee Nassif, Interim Director of Development Services" for signature line
|
|
|
GIS Review
|
Corrections
|
11/24/2021
|
12/02/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Not necessarily a correction, but the 3 curves just southeast of Bailey Rd (between Line 12 and 13) all say in the legal "to a point of reverse curvature," and the directions of curves are LEFT/LEFT/RIGHT respectively. I am just wanting to confirm that these directions in the legal are correct, as I can't confirm using the drawing (too subtle).
|
|
|
Engineering Review
|
Corrections
|
11/19/2021
|
11/18/2021
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Stream buffers shall be shown on the plat in graphic format, along with dimensions. Please refer to the approved Preliminary Plat for information regarding this requirement.
|
|
Corrective Action Required
Stream buffer notes were missing from the plat. Legal staff has prepared language for the plat, and shall be used to define the term "stream buffer" and the associated stream buffer easement.
|
|
Corrective Action Required
Detention basin notes were not in accordance with the standard language prepared by the City's legal staff. Legal staff has prepared standard language for plats with detention basins owned and maintained by a homeowners or property owners association. Please use this language to define the detention basin area and associated maintenance schedule.
|
|
Corrective Action Required
An easement is shown within Tract C with a length of 200 feet and near the southwest corner of Tract C. This easement appears to drain the detention basin, and is not needed or desired by the City since this is a private detention basin.
|
|
|
Planning Review
|
Corrections
|
11/19/2021
|
11/16/2021
|
|
Shannon McGuire
|
|
Corrective Action Required
Please label the area in square feet for each lot, parcel, or tract.
|
|
Corrective Action Required
Please label each lot, parcel, or tract with its respective street number.
|
|
Corrective Action Required
Sidewalks are required on both sides of SE Bailey Farms PKWY. Please update the plans accordingly.
|
|
Corrective Action Required
Please show the required sidewalks on sheet No. 2 of 2.
|
|
Corrective Action Required
Access to individual lots shall not be allowed from an arterial or collector street when access from a local or access street is available. Please add a not to lots #15 & #25 shall not have direct vehicular access to SE Bailey Farms PKWY.
|
|
|
Traffic Review
|
Corrections
|
11/19/2021
|
11/16/2021
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
SE Bailey Farms Parkway is classified as a residential collector. Sidewalks are required on both sides.
|
|
|
Fire Review
|
No Comments
|
11/19/2021
|
11/11/2021
|
|
Jim Eden
|
|
|