Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
10/25/2021
|
10/25/2021
|
|
Jennifer Thompson
|
|
|
GIS Review
|
No Comments
|
10/25/2021
|
10/20/2021
|
|
Kathy Kraemer
|
|
|
Engineering Review
|
No Comments
|
10/25/2021
|
10/19/2021
|
|
Loic Nguinguiri, E.I.
|
|
|
GIS Review
|
Corrections
|
09/13/2021
|
09/08/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Drawing and the certification paragraph for city signatures still references lot 1135A.
|
|
|
Planning Review
|
Corrections
|
09/13/2021
|
09/08/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
The lot is still labeled as 1135A, however it has been revised in other areas of the plat.
|
|
Corrective Action Required
Please see engineering comment regarding the easement.
|
|
|
Engineering Review
|
Corrections
|
09/13/2021
|
09/03/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Due to the shifting of the common property line between Lots 75 and 135, Show/label the new variable U/E.
|
|
Corrective Action Required
On the plan view exhibit, revise name of eastern lot to Lot 135A, instead of Lot 1135A.
|
|
|
Planning Review
|
Corrections
|
08/09/2021
|
08/05/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
There is an extra one (1) in the plat title and all other areas where lot 135A is shown, please revise.
|
|
Corrective Action Required
Staff is meeting with our legal department tomorrow morning to double check on the plat title
|
|
|
Traffic Review
|
No Comments
|
08/05/2021
|
08/04/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
GIS Review
|
Corrections
|
08/05/2021
|
08/03/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please verify that the title, dedication, and drawing are correct as to the lot number; is it 1135A or is it 135A?
|
|
|
Building Codes Review
|
No Comments
|
08/05/2021
|
08/02/2021
|
|
Joe Frogge
|
|
|
Engineering Review
|
Corrections
|
08/05/2021
|
08/02/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
With the shifting of the common property line between Lots 75 and 135, the proposed Lot 75A no longer has access to the existing north-south U/E between the original lots. There is no public infrastructure located within this north-south easement. Is any private utility infrastructure located in the north-south easement for which access is needed by the new Lot 75A? If so, there is now a gap between the new lot line and the easement that doesn’t allow Lot 75A to access the easement. If access is needed, additional easement needs to be dedicated as part of this minor plat to close the gap.
|
|
|
Fire Review
|
No Comments
|
08/05/2021
|
07/30/2021
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
07/21/2021
|
07/21/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
Please see GIS comments regarding the plat title. Will need to brainstorm a new plat title to meet Jackson County needs.
|
|
Corrective Action Required
Revise the address for Lot 135A, it should be 4320.
|
|
Corrective Action Required
Add street names in the vicinity map.
|
|
Corrective Action Required
Plat dedications/certifications will need to be revised once the Plat title is determined.
|
|
|
Engineering Review
|
Corrections
|
07/21/2021
|
07/20/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Revise the FEMA panel number.
|
|
Corrective Action Required
Include the existing 7.5 U/E running north-south along the western property line within lot 135A.
|
|
|
GIS Review
|
Corrections
|
07/21/2021
|
07/12/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Two plat names cannot be combined into a single plat due to indexing at the assessor's office. Please rename plat or split into two plats.
|
|
Corrective Action Required
The south lot line on lot 75A/135A: Please correct dimension on bearing S75-55-13W. 77.98+14.13= 92.11.
|
|
|