Summary
PL2021240
Village at New Longview Townhomes - Site Disturbance Plans
Engineering Plan Review
Engineering Plan Review
Approved
06/28/2021
YARCO-DEVCO LLC
Locations
Contacts
YARCO-DEVCO LLC, Address:7920 WARD PARKWAY  
Scott Ready, Phone: 8169691225  
RUSSELL PEARSON, Address:3152 GRANDSTAND CIR, Phone:(913) 735-9861  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 11/24/2021 11/23/2021
Sue Pyles, P.E.
Traffic Review No Comments 11/24/2021 11/22/2021
Brad Cooley, P.E., RSPI
Engineering Review Corrections 10/28/2021 10/19/2021
Sue Pyles, P.E.
Corrective Action Required
10/19/2021

SWPPP Page 4: • Update anticipated start and end dates. • Update Table 1 to match the Site Disturbance plan set. Revise the text of Stages B & C to match Stage A (eliminate the scaled back text).
Traffic Review No Comments 10/28/2021 10/14/2021
Scott Ready
Engineering Review Corrections 08/12/2021 08/11/2021
Sue Pyles, P.E.
Corrective Action Required
08/11/2021

Submit an Engineer's Estimate of Probable Construction Costs and s copy of the MDNR Land Disturbance Permit.
Traffic Review No Comments 08/12/2021 08/10/2021
Brad Cooley, P.E., RSPI
Engineering Review Corrections 07/07/2021 07/07/2021
Sue Pyles, P.E.
Corrective Action Required
07/07/2021

Submit an Engineer's Estimate of Probable Construction Costs and s copy of the MDNR Land Disturbance Permit.
Corrective Action Required
07/07/2021

Sheet C500: • Cite the source used in the oil/gas well note. • Revise “Lee’s Summit Water & Services Department” at 816-969-1940 to “Lee’s Summit Water Utilities Department” at 816-969-1900. • KCP&L is now Evergy.
Corrective Action Required
07/07/2021

The Erosion Control Staging Chart BMP Reference No. C2 indicated that the temporary sediment basin will be converted to a permanent detention basin. This is not accurate, please revise.
Corrective Action Required
07/07/2021

Please include installation of initial silt fence in Stage A.
Corrective Action Required
07/07/2021

Show and label the emergency spillway location and dimensions, including the rip-rap installation, on all Plan views.
Corrective Action Required
07/07/2021

Please note that the grading shown has been reviewed in a general overview. Specific grading review will be completed with separate, more detailed, plan sets.
Corrective Action Required
07/07/2021

Please add the following note “The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
07/07/2021

SWPPP: Update the anticipated start and end dates on Sheet 3 and update document based on revisions to the Site Disturbance plan set.
Traffic Review No Comments 07/07/2021 06/30/2021
Brad Cooley, P.E., RSPI
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home