Review Type |
Outcome |
Est. Completion Date |
Completed |
DCM Waiver Request
|
Approved
|
02/09/2022
|
02/09/2022
|
|
Sue Pyles, P.E.
|
|
The DCM waiver request has been sent to the City Engineer on 1/26/22. Additional information was requested by the City Engineer and provided on 1/27/22. Waiting for approval. Date required changed to 2/7/22. KENT MONTER 01/28/2022 4:17 PM
A reminder email was sent to CE on 2/7/22. KENT MONTER 02/07/2022 9:30 AM
|
Engineering Review
|
No Comments
|
10/21/2021
|
10/21/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $26,678.74
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Engineering Review
|
Approved with Conditions
|
06/21/2021
|
06/21/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $26,678.74
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Building Codes Review
|
No Comments
|
06/21/2021
|
06/14/2021
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
06/21/2021
|
06/14/2021
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
The lane along the back of the building in front of the hydrant and FDC shall be marked.
|
|
|
Planning Review
|
No Comments
|
06/21/2021
|
06/14/2021
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
06/21/2021
|
06/14/2021
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Approved with Conditions
|
06/10/2021
|
06/11/2021
|
|
Mike Weisenborn
|
|
Misc.
Corrective Action Required
Please provide and engineers estimate of probable cost.
|
|
|
Traffic Review
|
No Comments
|
06/10/2021
|
06/09/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
No Comments
|
06/10/2021
|
06/08/2021
|
|
Shannon McGuire
|
|
|
Fire Review
|
Approved with Conditions
|
06/10/2021
|
06/07/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
The lane along the back of the building in front of the hydrant and FDC shall be marked.
|
|
|
Building Codes Review
|
No Comments
|
06/10/2021
|
06/03/2021
|
|
Joe Frogge
|
|
|
Engineering Review
|
Corrections
|
05/20/2021
|
05/20/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please submit the following:
• Engineer's Estimate of Probable Construction Costs.
• SWPPP (SWPPP submitted is not for this location).
|
|
Corrective Action Required
Sheet C1.0:
• Please revise the City’s various contact information. Public Works is in City Hall, Building Inspections is in City Hall at 816-969-1200, and Water Utilities is 816-969-1900.
• Include an Index of Sheets.
• Show and label SW Oldham Pkwy in the Vicinity Map.
|
|
Corrective Action Required
Sheet C.3.0: Many of the proposed contours don’t tie back into existing contours. Please review and revise as needed.
|
|
Corrective Action Required
Sheets C3.1 & C3.2: Many of the slopes and elevations overlap. Please relocate overlapping text for clarity. A review of the ADA-accessible ramp design will be done after the text has been relocated.
|
|
Corrective Action Required
Sheet C.4.0:
• Utility Keynote FP-2 near the SE corner of the site doesn’t appear to be pointing at anything. Please revise as needed.
• Utility Keynote FP-4 near the NW corner of the site doesn’t appear to be pointing at anything. Please revise as needed.
• Utility Keynote RD=1 & RD-4 reference a boot. Is that included in the details? If not, please add.
|
|
Corrective Action Required
Sheets C5.0-C5.2:
• Please review the proposed and existing grade lines. Many of them are missing or partially missing. Revise as needed.
• Include the design HGL in the Profile views.
• Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
• Please denote existing flowlines in the Profile views.
• Please review flowlines to ensure the required minimum drop the structure is met.
• Please review all structure tops to ensure they match with the proposed grade.
• All pipes larger than 6” diameter require profiles. Please add for the roof drain piping.
|
|
|
Planning Review
|
Corrections
|
05/20/2021
|
05/19/2021
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a signed application and a completed/signed ownership affidavit form.
|
|
Corrective Action Required
Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. Please label the site plan to show compliance with this requirement. Additionally, the pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course. The standard details on sheet C8.0 depicts a PCC Drive Pavement Section. Please clarify what PCC stands for.
|
|
Corrective Action Required
Please provide a detail depicting the proposed height of the light pole.
|
|
Corrective Action Required
On the elevation sheets please provide a dashed line indicating the roof line and rooftop mechanical equipment behind the screening walls.
|
|
Corrective Action Required
All signs must comply with the sign requirements as outlined in the sign section of the UDO or as approved during the PDP process. Signs will be reviewed and permitted by separate application.
|
|
Corrective Action Required
A minor plat will be required to be submitted and approved prior to the issuance of building permits.
|
|
|
Fire Review
|
Approved with Conditions
|
05/20/2021
|
05/17/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
The lane along the back of the building in front of the hydrant and FDC shall be marked.
|
|
|
Traffic Review
|
No Comments
|
05/20/2021
|
05/17/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
05/20/2021
|
05/07/2021
|
|
Joe Frogge
|
|
|