Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
04/13/2021
|
04/13/2021
|
|
Jennifer Thompson
|
|
|
Fire Review
|
Approved with Conditions
|
04/13/2021
|
04/09/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Engineering Review
|
Approved with Conditions
|
04/13/2021
|
04/08/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $35,676.17
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Traffic Review
|
No Comments
|
04/13/2021
|
04/08/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
04/13/2021
|
04/07/2021
|
|
Joe Frogge
|
|
|
Planning Review
|
Corrections
|
04/01/2021
|
04/02/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
Provide a site data table for the Lot. Similar to what was provided on the PDP.
|
|
Corrective Action Required
The landscaping data table is incomplete. Please incorporate the required and provided numbers, etc.
|
|
Corrective Action Required
Provide color elevations, similar to what was submitted as part of the pdp.
|
|
Corrective Action Required
Provide the manufacturing lighting specifications for all exterior lighting.
|
|
|
Engineering Review
|
Corrections
|
04/01/2021
|
03/30/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Sheet C5.0: Please clarify Notes 60 & 61. Is note 60 referring to the sanitary main? If so, the size is wrong. Is the service line intended to be 4” or 6”? If 6” then revise Note 61.
|
|
Corrective Action Required
Sheet C8.0: Add erosion control to protect the detention basin.
|
|
Corrective Action Required
Sheets C11.0-C13.0: Add backflow vault and trench/backfill details.
|
|
|
Fire Review
|
Approved with Conditions
|
04/01/2021
|
03/29/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Traffic Review
|
No Comments
|
04/01/2021
|
03/22/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
04/01/2021
|
03/19/2021
|
|
Joe Frogge
|
|
|