Summary
PL2021092
LOT 1 STREETS OF WEST PRYOR
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/17/2021
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
URBAN PRAIRIE ARCHITECTRUAL COLLABRORATIVE - PALU MINTO, Address:4523 MERCIER ST, Phone:(816) 304-7416  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 04/13/2021 04/13/2021
Jennifer Thompson
Fire Review Approved with Conditions 04/13/2021 04/09/2021
Jim Eden
Code Statement
Informational
04/07/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Engineering Review Approved with Conditions 04/13/2021 04/08/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/08/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/08/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/08/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $35,676.17
DE Future Repair Work
Corrective Action Required
04/08/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 04/13/2021 04/08/2021
Michael Park
Building Codes Review No Comments 04/13/2021 04/07/2021
Joe Frogge
Planning Review Corrections 04/01/2021 04/02/2021
Jennifer Thompson
Corrective Action Required
04/02/2021

Provide a site data table for the Lot. Similar to what was provided on the PDP.
Corrective Action Required
04/02/2021

The landscaping data table is incomplete. Please incorporate the required and provided numbers, etc.
Corrective Action Required
04/02/2021

Provide color elevations, similar to what was submitted as part of the pdp.
Corrective Action Required
04/02/2021

Provide the manufacturing lighting specifications for all exterior lighting.
Engineering Review Corrections 04/01/2021 03/30/2021
Sue Pyles, P.E.
Corrective Action Required
03/30/2021

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
03/30/2021

Sheet C5.0: Please clarify Notes 60 & 61. Is note 60 referring to the sanitary main? If so, the size is wrong. Is the service line intended to be 4” or 6”? If 6” then revise Note 61.
Corrective Action Required
03/30/2021

Sheet C8.0: Add erosion control to protect the detention basin.
Corrective Action Required
03/30/2021

Sheets C11.0-C13.0: Add backflow vault and trench/backfill details.
Fire Review Approved with Conditions 04/01/2021 03/29/2021
Jim Eden
Code Statement
Informational
03/29/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review No Comments 04/01/2021 03/22/2021
Michael Park
Building Codes Review No Comments 04/01/2021 03/19/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 03/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: