Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Approved with Conditions
|
03/09/2021
|
03/09/2021
|
|
Dawn Bell
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/09/2021
|
03/09/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $39,619.69
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
Misc.
Corrective Action Required
A recorded copy of the proposed U/E along NW Lowenstein Drive must be provided to the City prior to any form of occupancy.
|
|
|
Planning Review
|
No Comments
|
03/09/2021
|
03/08/2021
|
|
Jennifer Thompson
|
|
|
Traffic Review
|
No Comments
|
03/09/2021
|
03/04/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
03/09/2021
|
03/03/2021
|
|
Joe Frogge
|
|
|
Building Codes Review
|
No Comments
|
02/26/2021
|
02/26/2021
|
|
Joe Frogge
|
|
|
Planning Review
|
No Comments
|
02/26/2021
|
02/25/2021
|
|
Jennifer Thompson
|
|
|
Engineering Review
|
Corrections
|
02/26/2021
|
02/24/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please show and label all current easements throughout the plan set. Please note that some of the easements shown on the Final Plat included in the plans have been vacated.
|
|
Corrective Action Required
Please show the existing water line crossing NW Lowenstein Drive throughout the plan set, not just on Sheet C5.0.
|
|
Corrective Action Required
Sheet C5.0:
• Please locate the water meters in the utility easement within 1’ of the easement line, as required by Design and Construction Manual Section 6901.L.1.
• Please locate the backflow prevention vault within 5’ of the utility easement line, on the private side, as required by Design and Construction Manual Section 6901.I.3.
• Revise Utility Note 9 to specify Type “K” Copper material at least 10 feet beyond the water meter.
|
|
Corrective Action Required
Sheet C10.0: The geogrid specified in the asphalt pavement details isn’t on the current Public Works Approved Products List. Please revise.
|
|
Corrective Action Required
Sheet C14.0: Please relocate the irrigation water source label leader, it appears to be pointing to the wrong location.
|
|
Corrective Action Required
Estimate:
• Include erosion and sediment control items.
• Please verify the water service line quantity.
|
|
|
Fire Review
|
Approved with Conditions
|
02/26/2021
|
02/24/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Traffic Review
|
No Comments
|
02/26/2021
|
02/22/2021
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
02/04/2021
|
02/18/2021
|
|
Joe Frogge
|
|
|
Planning Review
|
Corrections
|
02/04/2021
|
02/17/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
Provide color elevation renderings similar to what was submitted with the preliminary development plan. They also provided a multidimensional view.
Label the exterior building materials.
Label the orientation for each elevation.
Dash in the roof-mounted units and illustrate how they will be screened from view (for each elevation).
|
|
Corrective Action Required
On Sheet C1.0 the legal description reflects both lots, revise to reference Lot 2 only.
|
|
Corrective Action Required
Show the proposed stacking of the vehicles within the drive-thru.
|
|
|
Traffic Review
|
No Comments
|
02/04/2021
|
02/03/2021
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
02/04/2021
|
02/03/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Sheet C1.0: Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Sheet C3.0:
• Please remove the “PV1” label. It isn’t necessary on this sheet.
• As this sheet is intended to show the overall layout for the proposed project, it should reflect just that. Please clearly show the new portion of retaining wall and delete the existing retaining wall that is being removed.
|
|
Corrective Action Required
Sheet C4.0:
• The Detail List shows “CW1” for the curb walk at building, but it is labeled as “CW2” in the Plan view. Please revise. If “CW1” is not used, please delete from the list.
• “TP” is shown in Plan view but is not included in the Detail List. Please add.
• The Detail List shows “PK-2” for the accessible sign, but they are labeled as “PK1” in the Plan view. Please revise.
|
|
Corrective Action Required
Sheet C5.0:
• Please locate the domestic water line connection, water meter, and Backflow Prevention Device per Section 6900 of the Design and Construction Manual.
• Please revise the detail referenced in Note 20E, it is incorrect.
• Why is the sanitary sewer service line 6”? That seems excessive.
• Note 61 seems to be pointing to the wrong location.
• Please include flowlines at the sanitary cleanouts and connection to the public main.
• Utility Note 10 references KCP&L, now Evergy.
|
|
Corrective Action Required
Sheet C6.0: Please clearly delineate the existing TW and BW where the new wall will connect.
|
|
Corrective Action Required
Sheet C7.0: The ADA-accessible ramps to the north of the proposed building do not have complete design information. Please revise similar to the other ramps on site.
|
|
Corrective Action Required
Sheet C9.0: The existing inlets are grate inlets. Please include the appropriate standard detail.
|
|
|
Fire Review
|
Approved with Conditions
|
02/04/2021
|
01/25/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|