Independence Ave Detail Center - Mass Grading and ESC
Engineering Plan Review
Engineering Plan Review
Approved
11/20/2020
Locations
Contacts
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 01/13/2021 01/07/2021
Loic Nguinguiri, E.I.
Traffic Review No Comments 12/31/2020 12/29/2020
Michael Park
Engineering Review Corrections 12/31/2020 12/28/2020
Loic Nguinguiri, E.I.
Corrective Action Required
12/28/2020

Please revise the direction of J-hooks to openly curve along with the direction of descending flow (i.e. nearby northern perimeter silt fence and area below).
Corrective Action Required
12/28/2020

Is the emergency spillway set at elevation 986.38’ or 983.4’ ? Please revise sediment basin data.
Corrective Action Required
12/28/2020

Within the staging chart, please assign a description (or a unique project stage) for the conversion of sediment basin. Applicable notes for the construction of new detention basin/pond need to be provided along.
Corrective Action Required
12/28/2020

Is the construction of sediment basin, project stage D, expected to be removed after stage F ? Is the installation of storm sewer, project stage C, expected to take place with all three (3) silt fence types installed ? Is phase II silt fence expected to be installed prior to or during mass grading ? Please revise the staging chart sequencing.
Corrective Action Required
12/28/2020

Please add and account for the following note: CONTRACTOR TO CONSTRUCT STORMWATER MANAGEMENT FACILITIES, SPECIFICALLY THOSE FEATURES RELATED TO DETENTION, PRIOR TO ANY LAND DISTURBANCE OF THE SITE AND PRIOR TO THE CONSTRUCTION OF ANY OTHER SITE DEVELOPMENT WORK AS NOT TO EFFECT DOWNSTREAM NEIGHBORS WITH UNDETAINED STORMWATER DISCHARGE.
Corrective Action Required
12/28/2020

On the EOOPCC sheet, please re-compute the total probable cost. Make sure to also revise the quantity of seeding & stabilization.
Engineering Review Corrections 12/30/2020 12/17/2020
Loic Nguinguiri, E.I.
Corrective Action Required
12/17/2020

Please revise to include a more reliable source regarding the survey for oil and/or gas note.
Corrective Action Required
12/17/2020

Feel free to correct any existing typographical errors. (e.g. within sheet index and general notes)
Corrective Action Required
12/17/2020

Please revise the label “future detention area” to “proposed sediment basin” on sheet C2.3, as also mentioned within the SWPPP. Make sure to also include the conversion step (from sediment basin to detention basin) within the ESC staging chart. Sediment basin data information, as shown in ESC-11 design summary table, needs to be provided as well.
Corrective Action Required
12/17/2020

Please include a final restoration plan. Make sure to also include a seeding and/or mulching cost item on to the EOOPCC sheet.
Corrective Action Required
12/17/2020

Please show Rock ditch check detail ESC-10 instead of Outlet protection detail ESC-14 since inflow protection is needed for the eastern Flared End Section in our case. Also on the EOOPCC sheet, make sure to account for the five (5) rock ditch checks along the proposed drainage swale as part of item #3.
Corrective Action Required
12/17/2020

Please re-include the drainage swale cross-section, but on the grading plan. Make sure to also label/show proposed grading elevations for the areas surrounding the future pavement. Labels for the proposed and existing contours need be turned on as well on both ESC phase I and phase II sheets.
Corrective Action Required
12/17/2020

Please show/re-include inlet protections, to be maintained throughout project duration.
Corrective Action Required
12/17/2020

Proposed arrangement of intermediate silt fence does not seem to best capture potential water runoff, but only divert it sideways. Please revise. Make sure to also show adequate direction of J-hooks.
Corrective Action Required
12/17/2020

Please revise the ESC staging chart sequencing. Several phase I items are listed as part of phase II. In addition to it, phase I silt fence that is likely to be removed before the construction of parking lot, is undistinguishable from phase II and perimeter silt fence(s) on the plan as well. Make sure to also include construction of temporary entrance.
Corrective Action Required
12/17/2020

On page 20 of 42 of the SWPPP, please check the unchecked boxes. Also, SWPPP seems to contain separated single data information throughout the last pages. Please revise format.
Engineering Review Corrections 12/09/2020 12/08/2020
Loic Nguinguiri, E.I.
Corrective Action Required
12/08/2020

Please label the correct address “2100 NE INDEPENDENCE AVE” in the title block.
Corrective Action Required
12/08/2020

Show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
12/08/2020

Please revise 14th general note on page C1.1 to mention “The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200”.
Corrective Action Required
12/08/2020

Please revise the 5th general note from the bottom to mention that paving shall conform to the geotech report which itself meets or exceeds City's requirements.
Corrective Action Required
12/08/2020

Please add the developer’s direct phone number.
Corrective Action Required
12/08/2020

Please provide a SWPPP and a Missouri DNR permit along with the resubmittal.
Corrective Action Required
12/08/2020

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
Corrective Action Required
12/08/2020

Given the vast area, additional intermediate silt fence barriers would be required within the disturbance area in order to prevent mud from running over long distances across the lot during heavy rain events.
Corrective Action Required
12/08/2020

As shown in ESC-03, J-hooks are required within the ESC plan. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks on the plan.
Corrective Action Required
12/08/2020

Please include information regarding removal and soil stabilization process of the existing pond.
Corrective Action Required
12/08/2020

Within the plans, please show construction standard details ESC-01, ESC-03, ESC-06, ESC-11, ESC-12 and ESC-14 available on the City's website.
Corrective Action Required
12/08/2020

These plans have been reviewed for erosion and sediment control design, as well as mass grading. The Final Development Plan review will include the review of the grading spot elevations and other similar information, so all of that information should be removed from this set of plans. The parking lot and building footprints can be shown, but scaled back. Only include in this set of plans what is to be constructed with this project.
Corrective Action Required
12/08/2020

If the retaining wall shall be constructed with this project, please include details.
Corrective Action Required
12/08/2020

Please note that no review of the detention basin design is included with this review.
Corrective Action Required
12/08/2020

The detention basin area is typically shown as a sediment basin or sediment trap in mass grading plans. Please clarify, and include the proper standard detail and design information.
Corrective Action Required
12/08/2020

Regarding pages C2.3 and C2.4, please clarify the intent or remove the two (2) extra FES.
Corrective Action Required
12/08/2020

Please provide ESC protection at the FES located along the eastern property line.
Traffic Review No Comments 12/09/2020 11/24/2020
Michael Park
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home