Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
01/13/2021
|
01/07/2021
|
|
Loic Nguinguiri, E.I.
|
|
|
Traffic Review
|
No Comments
|
12/31/2020
|
12/29/2020
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
12/31/2020
|
12/28/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please revise the direction of J-hooks to openly curve along with the direction of descending flow (i.e. nearby northern perimeter silt fence and area below).
|
|
Corrective Action Required
Is the emergency spillway set at elevation 986.38’ or 983.4’ ? Please revise sediment basin data.
|
|
Corrective Action Required
Within the staging chart, please assign a description (or a unique project stage) for the conversion of sediment basin. Applicable notes for the construction of new detention basin/pond need to be provided along.
|
|
Corrective Action Required
Is the construction of sediment basin, project stage D, expected to be removed after stage F ? Is the installation of storm sewer, project stage C, expected to take place with all three (3) silt fence types installed ? Is phase II silt fence expected to be installed prior to or during mass grading ? Please revise the staging chart sequencing.
|
|
Corrective Action Required
Please add and account for the following note: CONTRACTOR TO CONSTRUCT STORMWATER MANAGEMENT FACILITIES, SPECIFICALLY THOSE FEATURES RELATED TO DETENTION, PRIOR TO ANY LAND DISTURBANCE OF THE SITE AND PRIOR TO THE CONSTRUCTION OF ANY OTHER SITE DEVELOPMENT WORK AS NOT TO EFFECT DOWNSTREAM NEIGHBORS WITH UNDETAINED STORMWATER DISCHARGE.
|
|
Corrective Action Required
On the EOOPCC sheet, please re-compute the total probable cost. Make sure to also revise the quantity of seeding & stabilization.
|
|
|
Engineering Review
|
Corrections
|
12/30/2020
|
12/17/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please revise to include a more reliable source regarding the survey for oil and/or gas note.
|
|
Corrective Action Required
Feel free to correct any existing typographical errors. (e.g. within sheet index and general notes)
|
|
Corrective Action Required
Please revise the label “future detention area” to “proposed sediment basin” on sheet C2.3, as also mentioned within the SWPPP. Make sure to also include the conversion step (from sediment basin to detention basin) within the ESC staging chart. Sediment basin data information, as shown in ESC-11 design summary table, needs to be provided as well.
|
|
Corrective Action Required
Please include a final restoration plan. Make sure to also include a seeding and/or mulching cost item on to the EOOPCC sheet.
|
|
Corrective Action Required
Please show Rock ditch check detail ESC-10 instead of Outlet protection detail ESC-14 since inflow protection is needed for the eastern Flared End Section in our case. Also on the EOOPCC sheet, make sure to account for the five (5) rock ditch checks along the proposed drainage swale as part of item #3.
|
|
Corrective Action Required
Please re-include the drainage swale cross-section, but on the grading plan. Make sure to also label/show proposed grading elevations for the areas surrounding the future pavement. Labels for the proposed and existing contours need be turned on as well on both ESC phase I and phase II sheets.
|
|
Corrective Action Required
Please show/re-include inlet protections, to be maintained throughout project duration.
|
|
Corrective Action Required
Proposed arrangement of intermediate silt fence does not seem to best capture potential water runoff, but only divert it sideways. Please revise. Make sure to also show adequate direction of J-hooks.
|
|
Corrective Action Required
Please revise the ESC staging chart sequencing. Several phase I items are listed as part of phase II. In addition to it, phase I silt fence that is likely to be removed before the construction of parking lot, is undistinguishable from phase II and perimeter silt fence(s) on the plan as well. Make sure to also include construction of temporary entrance.
|
|
Corrective Action Required
On page 20 of 42 of the SWPPP, please check the unchecked boxes. Also, SWPPP seems to contain separated single data information throughout the last pages. Please revise format.
|
|
|
Engineering Review
|
Corrections
|
12/09/2020
|
12/08/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please label the correct address “2100 NE INDEPENDENCE AVE” in the title block.
|
|
Corrective Action Required
Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Please revise 14th general note on page C1.1 to mention “The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200”.
|
|
Corrective Action Required
Please revise the 5th general note from the bottom to mention that paving shall conform to the geotech report which itself meets or exceeds City's requirements.
|
|
Corrective Action Required
Please add the developer’s direct phone number.
|
|
Corrective Action Required
Please provide a SWPPP and a Missouri DNR permit along with the resubmittal.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
|
|
Corrective Action Required
Given the vast area, additional intermediate silt fence barriers would be required within the disturbance area in order to prevent mud from running over long distances across the lot during heavy rain events.
|
|
Corrective Action Required
As shown in ESC-03, J-hooks are required within the ESC plan. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks on the plan.
|
|
Corrective Action Required
Please include information regarding removal and soil stabilization process of the existing pond.
|
|
Corrective Action Required
Within the plans, please show construction standard details ESC-01, ESC-03, ESC-06, ESC-11, ESC-12 and ESC-14 available on the City's website.
|
|
Corrective Action Required
These plans have been reviewed for erosion and sediment control design, as well as mass grading. The Final Development Plan review will include the review of the grading spot elevations and other similar information, so all of that information should be removed from this set of plans. The parking lot and building footprints can be shown, but scaled back. Only include in this set of plans what is to be constructed with this project.
|
|
Corrective Action Required
If the retaining wall shall be constructed with this project, please include details.
|
|
Corrective Action Required
Please note that no review of the detention basin design is included with this review.
|
|
Corrective Action Required
The detention basin area is typically shown as a sediment basin or sediment trap in mass grading plans. Please clarify, and include the proper standard detail and design information.
|
|
Corrective Action Required
Regarding pages C2.3 and C2.4, please clarify the intent or remove the two (2) extra FES.
|
|
Corrective Action Required
Please provide ESC protection at the FES located along the eastern property line.
|
|
|
Traffic Review
|
No Comments
|
12/09/2020
|
11/24/2020
|
|
Michael Park
|
|
|